Grand Lake Clarity

Related Documents:

  • Supplement 10 of Contract Between the United States of America and the Northern Colorado Water Conservancy District For Addressing Commitments Associated with Meeting the Grand Lake Clarity Standard
  • Grand Lake Clarity Stakeholders' Memorandum of Understanding

Technical Reports

  • Value Planning Study Final Report, Grand Lake Water Clarity (2017)
  • Grand Lake Clarity Adaptive Management Annual Report (2016)
  • Top-Down Water Storage Mixing Systems Scoping Report (2016)
  • Draft 2015 Operational and Water Quality Summary Report for the Three Lakes (2016)
  • Sources and Characterization of Particles Affecting Transparency in Grand Lake and Shadow Mountain Reservoir (2015)
  • Highlights-Current Understanding of Water Quality Related to Grand Lake Clarity Standard (2015)
  • Grand Lake Statistical Trend Analysis (2013)
  • 2013 Shadow Mountain Reservoir Aquatic Weed Ground Truthing Survey Report (2013)
  • Grand Lake Water Clarity Technical Review and Work Plan (2013)
  • Preliminary Alternatives Development Report (2012)
  • Impact of the 2006 Shadow Mountain Reservoir Drawdown to Control Aquatic Plants (2008)
  • Algae Toxin Monitoring Program, Three Lakes Region (2008)
  • Scoping Study 3 Lakes Water Quality, Grand County, Colorado (2006)
  • Grand Lake 104(b)(3) Stormwater Project 1999-2001 Report (2002)
Last Updated: 6/24/20