Yakima River Basin Water Enhancement Project

Home | Integrated Plan | 2010 Basin Study | 2009 Workgroup | IOP | Phase 1 | Phase 2 | Authorization


YRBWEP Reports
11/2014 Technical Memorandum: Hydrologic Modeling of System Improvements Phase 1 Report PDF 22.15 mb
05/2014 Technical Memorandum: Programmatic Framework for Aquifer Storage and Recovery in the Ahtanum Valley PDF 1.98 mb
04/2014 Yakima River Basin Integrated Water Resource Management Plan Technical Memorandum: Wymer Reservoir Temperature Study PDF 2.75 mb
04/2014 Yakima River Basin Integrated Water Resource Management Plan Technical Memorandum: Wymer Reservoir Pumping Plant Update PDF 11.8 mb
09/2013 Yakima River Basin Integrated Water Resource Management Plan Technical Memorandum: Field Investigation of Shallow Groundwater Recharge - Eastern Kittitas Valley, WA PDF 32.49 mb
09/2013 Yakima River Basin Integrated Water Resource Management Plan Technical Memorandum: Screening of Alternatives for the Keechelus-to-Kachess Conveyance Project PDF 5.89 mb
07/2013 Record of Decision for the Yakima River Basin Integrated Water Resource Management Plan Final Programmatic Environmental Impact Statement PDF 559 kb
04/2013 First Annual Progress Report Clear Creek Dam Passage Assessment PDF 5.20 mb
04/2013 Appraisal Study of Kittitas Valley Delivery Systems for Groundwater Recharge and Creek Flows Technical Memoranda PDF 3.76 mb
10/2012 Yakima River Basin Integrated Water Resource Management Plan Framework for Implementation Report PDF 3.21 mb
10/2012 Yakima River Basin Integrated Water Resource Management Plan Four Accounts Analysis PDF 1.63 mb
10/2012 Technical Memorandum: Preliminary Cost Allocation for the Proposed Yakima River Basin Integrated Water Resource Management Plan PDF 1.01 mb
06/2012 Yakima River Basin Study Technical Memorandum: Cost Risk Assessment of Six Projects from the Proposed Integrated Water Resource Management Plan PDF 2.49 mb
03/2012 Yakima River Basin Integrated Water Resource Plan Final Programmatic Environmental Impact Statement (PEIS) PDF 18.6 mb
03/2012 Executive Summary for the Final PEIS PDF 4.19 mb
02/2012 Yakima River Basin Integrated Water Resources Management Plan Final Fish and Wildlife Coordination Act Report PDF 2.68 mb
11/2011 Yakima River Basin Integrated Water Resource Management Plan Draft Programmatic Environmental Impact Statement (PEIS) PDF 8.43 mb
11/2011 Yakima River Basin Integrated Water Resource Management Plan, Draft PEIS, Executive Summary PDF 830 kb
11/2011 Yakima River Basin Water Resource Management Plan Draft Fish and Wildlife Coordination Act Report PDF 1.43 mb
08/2011 Scoping Summary Report Yakima River Basin Integrated Water Resource Management PDF 8.39 mb
08/2011 Addendum to the Proposed Integrated Water Resource Management Plan, Vol. 1 PDF 382 kb
04/2011 Proposed Integrated Water Resource Management Plan: Vol. 1 PDF 2.48 mb
03/2011 Final Integrated Plan Summary Support Document PDF 331 kb
03/2011 Technical Memoranda: Volume 2 HTML
12/2009 Preliminary Integrated Water Resource Management Plan for the Yakima River Basin HTML
07/2009 YRBWEP Fact Sheet PDF 57 kb
07/2009 Yakima River Basin Water Enhancement Project Timeline PDF 183 kb
06/2009 Washington State Dept. of Ecology Final EIS HTML
03/2009 Climate Impact Group - Climate change impact on water management and irrigated agriculture in the Yakima River Basin, Washington, USA PDF 409 kb
Reference Documents
12/2008 Yakima River Basin Water Storage Feasibility Study Planning Report/EIS HTML
09/2008 Cle Elum and Bumping Lake Dams Fish Passage Facilities Planning Report – Draft PDF 6.0 mb
08/2008 Yakima Steelhead Recovery Plan HTML
01/2008 System Operations Technical Document for the Yakima River Basin Technical Series No. TS-YSS-21 PDF 2.58 mb
01/2008 Yakima River Basin Fish Passage, Phase I and II Fish Screen Construction Project Completion Report PDF 745 kb
2006-08 USGS Yakima Basin Studies HTML
09/2007 Detailed Implementation Plan PDF 3.71 mb
01/2003 Watershed Management Plan PDF 18.36 mb
11/2002 Yakima River Basin Interim Operation Plan PDF 6.0 mb
05/1999 System Operation Advisory Committee (SOAC) Report on Biologically Based Flows for the Yakima River Basin PDF 2.3 mb
03/1999 Yakima River Basin Water Enhancement Project Record of Decision Final Programmatic Environmental Impact Statement PDF 383 kb
01/1999 YRBWEP Final Programmatic Environmental Impact Statement PDF 30.27 mb
10/1997 Cle Elum Pool Raise Planning Aid Memorandum PDF 1.94 mb
06/1989 Appraisal Assessment of Tributary Storage Potentials - Kittitas Valley, Washington PDF 8.3 mb
04/1985 Yakima River Basin Water Enhancement Project, Phase 2, Status Report PDF 3.1 mb
03/1984 Yakima River Basin Water Enhancement Study - Preliminary Report for Swauk Creek Dam, Lake Cle Elum Tunnel & Lake Cle Elum Pumping Plant PDF 2.8 mb
02/1984 Yakima River Basin Water Enhancement Project, Phase 2, Draft Plan of Study PDF 5.5 mb
01/1984 Damsite and Structure Review Team Report PDF 24.36 mb
1979-84 YRBWEP Authorization Documents HTML
08/1982 Yakima River Basin Water Enhancement Project, Phase 1 Study Team Report PDF 6.0 mb
05/1978 Yakima River Reregulating Storage - Feasibility Study PDF 10.8 mb
05/1978 Yakima River Reregulating Storage - Appendix A-E PDF 4.3 mb

Contact

Wendy Christensen
(509) 573-8050
gchristensen@usbr.gov

Bureau of Reclamation
Pacific Northwest Region
Columbia-Cascades Area Office
1917 Marsh Road
Yakima, WA 98901-2058


Thomas Tebb
(509) 575-3989
Thomas.tebb@ecy.wa.gov

Director, Office of Columbia River
State of Washington
Department of Ecology
15 W. Yakima Ave, Ste 200
Yakima, WA 98902-3452


Last Updated 12/14/17