Project Details
Title: Reinitiation of Consultation on the Coordinated Long-Term Operation of the Central Valley Project and State Water Project
Summary: Reclamation prepared this environmental impact statement (EIS) to analyze potential modifications to the continued long-term operation of the CVP, for its authorized purposes, in a coordinated manner with the SWP, for its authorized purposes. This EIS evaluates alternatives to maximize water supply deliveries and optimize marketable power generation consistent with applicable laws, contractual obligations, and agreements and to augment operational flexibility by addressing the status of listed species.
Contact
Phone
Fax
E-Mail
BDO 916-414-2426 N/A sha-mpr-bdo@usbr.gov
Status
07/11/2019Draft EIS available for public review. Comments due by August 26, 2019.
List of Available Reports
File Report Title File Ext File Size
Reinitiation of Consultation on the Coordinated Long-Term Operation of the Central Valley Project and State Water Project Draft EIS .pdf 12,419,422 KB
Appendices A thru E, Reinitiation of Consultation on the Coordinated Long-Term Operation of the Central Valley Project and State Water Project Draft EIS .pdf 23,354,196 KB
Appendix F, Reinitiation of Consultation on the Coordinated Long-Term Operation of the Central Valley Project and State Water Project Draft EIS .pdf 27,579,911 KB
Appendices G thru P, Reinitiation of Consultation on the Coordinated Long-Term Operation of the Central Valley Project and State Water Project Draft EIS .pdf 44,488,803 KB
Appendices Q thru Z, Reinitiation of Consultation on the Coordinated Long-Term Operation of the Central Valley Project and State Water Project Draft EIS .pdf 10,911,797 KB