Project Details
Title: San Joaquin River Restoration Program (SJRRP) Interim Flows Project Environmental Assessment/ Initial Study Water Year 2010 ***************************** 2. SJRRP Water Year 2011 Interim Flows Project Supplemental Environmental Assessment ***************************** 3. SJRRP Water Year 2012 Interim Flows Project Supplemental Environmental Assessment
Summary: 1. Water Year 2010 EA: Reclamation temporarily changed Friant Dam operations in Water Year (WY) 2010 to release Interim Flows from Friant Dam into the San Joaquin River and potentially downstream to the Sacramento-San Joaquin River Delta (Delta), as specified in the Stipulation of Settlement in NRDC et al. v. Kirk Rodgers et al., and as part of the SJRRP. Interim Flows would be constrained by existing channel capacity, anticipated seepage, future agreements with downstream agencies, entities, and landowners, and the capacity of diversions, as well as water supply demand at the possible diversion locations. The purpose of the WY 2010 Interim Flows Project is to implement provisions of the Settlement related to Interim Flows and to collect relevant data to guide future releases of Interim Flows and Restoration Flows under the SJRRP.*********************** 2. Water Year 2011 EA: This Supplemental EA described and analyzed the effects of an additional year of Interim Flows for WY 2011. The Supplemental EA includes a review of the WY 2010 Final EA/IS, synthesizes discussions/results where conditions have not changed, and evaluates potential impacts due to implementation of WY 2011 Interim Flows in consideration of changed conditions or new data/information that have occurred.************************** 3. Water Year 2012 EA: The purpose of this Supplemental EA is to proceed with the continuation of activities necessary to convey the flows in the San Joaquin River from Friant Dam to the Delta, and to continue data collection and monitoring activities during Interim Flow releases consistent with the provisions and conditions described in the WY 2010 Interim Flows Final EA/IS and the Supplemental WY 2011 Interim Flows Final EA.
Contact
Phone
Fax
E-Mail
Michelle Banonis 916 978-5457 N/A mbanonis@usbr.gov
Status
09/30/2011Draft Supplemental EA for 2012 available for review June 14, 2011. Comments due 5:00 p.m. on July 21, 2011. FONSI signed and Final EA available on September 30, 2011.
09/22/2010Draft Supplemental EA for 2011 available for review June 11, 2010. Comments due date extended to July 23, 2010. FONSI signed and Final 2011 Supplemental EA completed on September 21, 2010.
06/24/2010Draft 2010 EA/IS available for review on June 3, 2009. The comment period ended July 20, 2009. Final 2010 EA/IS and signed FONSI available September 25, 2009.
List of Available Reports
File Report Title File Ext File Size
Signed FONSI, 2012 Interim Flows Project .pdf 109 KB
Final Supplemental EA, 2012 Interim Flows Project .pdf 951 KB
Final Supplemental EA, Appendices A-G; 2012 Interim Flows Project .pdf 3,644 KB
Final Supplemental EA, Appendices H-J; 2012 Interim Flows Project .pdf 2,494 KB
Final Supplemental EA, Appendix K, Part 1: BCID thru RP; 2012 Interim Flows Project .pdf 4,519 KB
Final Supplemental EA, Appendix K, Part 2: RMC; 2012 Interim Flows Project .pdf 5,279 KB
Final Supplemental EA, Appendix K, Part 3: RMC thru SLDMWA ; 2012 Interim Flows Project .pdf 1,820 KB
Final Supplemental EA, Appendix K, Part 4: SLDMWA attachments; 2012 Interim Flows Project .pdf 4,378 KB
Final Supplemental EA, Appendix K, Part 5: SLDMWA thru WSID; 2012 Interim Flows Project .pdf 628 KB
Draft FONSI, Supplemental EA 2012 Interim Flows Project .pdf 80 KB
Draft Supplemental EA, 2012 Interim Flows Project .pdf 933 KB
Draft Supplemental EA - Appendix A_G. 2012 Interim Flows Project .pdf 5,582 KB
Draft Supplemental EA - Appendix H_I. 2012 Interim Flows Project .pdf 2,139 KB
FONSI, Supplemental EA 2011 Interim Flows Project .pdf 622 KB
Final Supplemental EA, Part 1, 2011 Interim Flows Project .pdf 4,079 KB
Final Supplemental EA, Part 2, 2011 Interim Flows Project .pdf 5,480 KB
Final Supplemental EA, Part 3, 2011 Interim Flows Project .pdf 2,086 KB
Final Supplemental EA; Attachment A-1, Part 1; 2011 Interim Flows Project .pdf 3,259 KB
Final Supplemental EA; Attachment A-1, Part 2; 2011 Interim Flows Project .pdf 4,469 KB
Final Supplemental EA; Attachment A-2; 2011 Interim Flows Project No File Extenstion Given 315 KB
Final Supplemental EA; Appendix A, Part 1; 2011 Interim Flows Project .pdf 2,359 KB
Final Supplemental EA; Appendix A, Part 2A; 2011 Interim Flows Project .pdf 3,259 KB
Final Supplemental EA; Appendix A, Part 2B; 2011 Interim Flows Project .pdf 4,364 KB
Final Supplemental EA; Appendix B; 2011 Interim Flows Project .pdf 1,202 KB
Draft Supplemental FONNSI 2011 Interim Flows Project .pdf 187 KB
Draft Supplemental EA 2011 Interim Flows Project .pdf 716 KB
Draft Supplemental EA - Appendix A. Part 1; 2011 Interim Flows Project .pdf 4,018 KB
Draft Supplemental EA - Appendix A. Part 2; 2011 Interim Flows Project .pdf 4,385 KB
Draft Supplemental EA - Appendix B; 2011 Interim Flows Project .pdf 458 KB
Draft Supplemental EA - Appendix C; 2011 Interim Flows Project .pdf 1,662 KB
Draft Supplemental EA - Appendix D; 2011 Interim Flows Project .pdf 1,346 KB
Draft Supplemental EA - Appendix E; 2011 Interim Flows Project .pdf 1,602 KB
Draft Supplemental EA - Appendix F. Part 1; 2011 Interim Flows Project .pdf 3,964 KB
Draft Supplemental EA - Appendix F. Part 2; 2011 Interim Flows Project .pdf 4,550 KB
Draft Supplemental EA - Appendix G; 2011 Interim Flows Project .pdf 107 KB
Signed FONSI, 2010 Interim Flows Project .pdf 368 KB
Final EA/IS - Chapters 1-3; 2010 Interim Flows Project .pdf 6,444 KB
Final EA/IS - Chapters 4-8; 2010 Interim Flows Project .pdf 2,500 KB
Final EA/IS - Appendix A,Settlement, Part 1; 2010 Interim Flows Project .pdf 5,335 KB
Final EA/IS - Appendix A,Settlement, Part 2; 2010 Interim Flows Project .pdf 2,522 KB
Final EA/IS - Appendices B-C; 2010 Interim Flows Project .pdf 6,532 KB
Final EA/IS - Appendix D; 2010 Interim Flows Project .pdf 1,869 KB
Final EA/IS - Appendix E; 2010 Interim Flows Project .pdf 102 KB
Final EA/IS - Appendix F; 2010 Interim Flows Project .pdf 64 KB
Final EA/IS - Appendix G,Chap. 1-7, Att.1; 2010 Interim Flows Project .pdf 5,047 KB
Final EA/IS - Appendix G, Att.2; 2010 Interim Flows Project .pdf 6,874 KB
Final EA/IS - Appendix G, Att.3; 2010 Interim Flows Project .pdf 3,480 KB
Final EA/IS - Appendix G, Att.4-5; 2010 Interim Flows Project .pdf 384 KB
Final EA/IS - Appendix G, Att.6, Part 1; 2010 Interim Flows Project .pdf 3,417 KB
Final EA/IS - Appendix G, Att.6, Part 2; 2010 Interim Flows Project .pdf 5,371 KB
Final EA/IS - Appendix H; 2010 Interim Flows Project .pdf 790 KB
Final EA/IS - Appendix I, Chap. 1-2; 2010 Interim Flows Project .pdf 6,849 KB
Final EA/IS - Appendix I, Chap. 3, Part 1; 2010 Interim Flows Project .pdf 6,126 KB
Final EA/IS - Appendix I, Chap. 3, Part 2; 2010 Interim Flows Project .pdf 5,270 KB
Final EA/IS - Appendix I, Chap. 3, Part 3; 2010 Interim Flows Project .pdf 6,443 KB
Final EA/IS - Appendix I, Chap. 4, Part 1; 2010 Interim Flows Project .pdf 6,779 KB
Final EA/IS - Appendix I, Chap. 4, Part 2; 2010 Interim Flows Project .pdf 6,159 KB
Final EA/IS - Appendix I, Chap. 4, Part 3; 2010 Interim Flows Project .pdf 6,367 KB
Final EA/IS - Appendix I, Chap. 5, Part 1; 2010 Interim Flows Project .pdf 4,784 KB
Final EA/IS - Appendix I, Chap. 5, Part 2; 2010 Interim Flows Project .pdf 5,362 KB
Final EA/IS - Appendix J, Att. 1-4; 2010 Interim Flows Project .pdf 6,546 KB
Draft EA/IS - Draft FONSI, Chap. 1 - 2; 2010 Interim Flows Project .pdf 4,527 KB
Draft EA/IS - Chap. 3-8; 2010 Interim Flows Project .pdf 3,312 KB
Draft EA/IS - Appendix A main body; 2010 Interim Flows Project .pdf 4,928 KB
Draft EA/IS - Appendix A exhibits; 2010 Interim Flows Project .pdf 2,943 KB
Draft EA/IS - Appendix B; 2010 Interim Flows Project .pdf 143 KB
Draft EA/IS - Appendix C; 2010 Interim Flows Project .pdf 6,051 KB
Draft EA/IS - Appendix D; 2010 Interim Flows Project .pdf 1,466 KB
Draft EA/IS - Appendix E; 2010 Interim Flows Project .pdf 100 KB
Draft EA/IS - Appendix F; 2010 Interim Flows Project .pdf 67 KB
Draft EA/IS - Appendix G; 2010 Interim Flows Project .pdf 4,563 KB
Draft EA/IS - Appendix H; 2010 Interim Flows Project .pdf 349 KB