Delta Cross Channel Upgrades
The Delta Cross Channel (DCC) is a gate-controlled diversion channel on the east bank of the Sacramento River, about 30 miles south of Sacramento. The DCC initiates the diversion of fresh water from the Sacramento River, through the interior Sacramento-San Joaquin River Delta, to the Central Valley Project and State Water Project.
Reclamation recently completed an evaluation of alternatives for modernizing the operation of the Delta Cross Channel gates to allow for more frequent operation. Improvements are also expected to increase the structure’s operational life, decrease operation and maintenance costs, increase the safety of employees, and improve conditions for recreational boaters. Reclamation is recommending an alternative for detailed analysis and is adding a public access feature that includes accessible, non-motorized boater and fishing access.
Schedule

News & Information
Contact
Bay-Delta Office, Interior Region 10 ยท California-Great Basin
Bureau of Reclamation
801 I Street, Suite 140
Sacramento, CA 95814
(916) 414-2400