-->


LOWER COLORADO RIVER DAILY REPORT: Today and the past 6 days
(Hourly Data)

You can access this data in a machine readable (JSON) format at this link.
You can view locations of data sites at this link.
These links are updated hourly with our most recent hourly data for the last 7 days.

  • Friday, 12-05-2025 (Today)


      TIME
      (MST)
      LAKE MEAD/HOOVER DAM LAKE MOHAVE/DAVIS DAM LAKE HAVASU/PARKER DAM
      ELEV
      (FT)
      STORAGE
      (KAF)
      RELEASE
      (CFS)
      ELEV
      (FT)
      STORAGE
      (KAF)
      RELEASE
      (CFS)
      ELEV
      (FT)
      STORAGE
      (KAF)
      RELEASE
      (CFS)
      0000-0100 1,059.39 8,376.91 1,053 640.72 1,695.21 2,202 448.69 544.56 1,912
      0100-0200 1,059.41 8,378.42 1,004 640.67 1,693.93 2,226 448.66 544.06 1,815
      0200-0300 1,059.44 8,380.68 980 640.68 1,694.12 2,214 448.69 544.56 1,888
      0300-0400 1,059.45 8,381.44 968 640.67 1,693.84 2,214 448.69 544.60 1,839
      0400-0500 1,059.43 8,379.93 992 640.65 1,693.45 2,202 448.67 544.13 1,888
      0500-0600 1,059.45 8,381.44 1,258 640.64 1,693.07 2,202 448.68 544.33 1,839
      0600-0700 1,059.45 8,381.44 2,408 640.67 1,693.98 2,214 448.69 544.56 1,863
      0700-0800
      0800-0900
      0900-1000
      1000-1100
      1100-1200
      1200-1300
      1300-1400
      1400-1500
      1500-1600
      1600-1700
      1700-1800
      1800-1900
      1900-2000
      2000-2100
      2100-2200
      2200-2300
      2300-2400
      Average 1,059.43 8,380.04 1,238 640.67 1,693.94 2,211 448.68 544.40 1,863
      TIME
      (MST)
      Below Big Bend Below Needles Bridge RS 41
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      0000-0100 479.14 2,536 451.50 4,067 449.51 2,494
      0100-0200 479.17 2,577 451.50 4,063 449.50 2,544
      0200-0300 479.07 2,470 451.50 4,062 449.51 2,471
      0300-0400 479.06 2,454 451.50 4,060 449.53 2,458
      0400-0500 479.05 2,449 451.50 4,058 449.52 2,525
      0500-0600 479.05 2,445 451.50 4,058 449.52 2,560
      0600-0700 479.06 2,454 451.50 4,057 449.52 2,528
      0700-0800
      0800-0900
      0900-1000
      1000-1100
      1100-1200
      1200-1300
      1300-1400
      1400-1500
      1500-1600
      1600-1700
      1700-1800
      1800-1900
      1900-2000
      2000-2100
      2100-2200
      2200-2300
      2300-2400
      Average 479.09 2,484 451.50 4,061 449.51 2,511
      TIME
      (MST)
      Parker Gage Water Wheel I-10 Bridge MCINTYRE PARK TAYLOR FERRY OXBOW BRIDGE
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      0000-0100 340.68 1,815 297.31 1,610 244.40 1,802 235.21 1,662 226.22 2,318 216.24 2,102
      0100-0200 340.54 1,605 297.31 1,610 244.38 1,775 235.21 1,659 226.25 2,344 216.24 2,100
      0200-0300 340.64 1,754 297.36 1,657 244.35 1,744 235.20 1,650 226.27 2,353 216.24 2,100
      0300-0400 340.68 1,811 297.53 1,833 244.34 1,731 235.19 1,640 226.27 2,359 216.24 2,100
      0400-0500 340.62 1,730 297.88 2,232 244.34 1,729 235.18 1,625 226.28 2,361 216.24 2,100
      0500-0600 340.59 1,678 298.24 2,665 244.33 1,712 235.16 1,605 226.28 2,366 216.24 2,100
      0600-0700 340.59 1,676 298.44 2,920 244.30 1,678 235.14 1,591 226.28 2,368 216.24 2,101
      0700-0800
      0800-0900
      0900-1000
      1000-1100
      1100-1200
      1200-1300
      1300-1400
      1400-1500
      1500-1600
      1600-1700
      1700-1800
      1800-1900
      1900-2000
      2000-2100
      2100-2200
      2200-2300
      2300-2400
      Average 340.62 1,724 297.72 2,075 244.35 1,739 235.18 1,633 226.26 2,353 216.24 2,101
      TIME
      (MST)
      CIBOLA PICACHO PARK MARTINEZ LAKE SENATOR
      WASH
      ABOVE
      IMPERIAL DAM
      ABOVE
      LAGUNA DAM
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      ELEV
      (FT)
      ELEV
      (FT)
      ELEV
      (FT)
      0000-0100 204.98 2,220 187.55 2,033 182.47 1,840 233.99 180.55 144.61
      0100-0200 204.97 2,210 187.55 2,031 182.47 1,840 233.96 180.55 144.55
      0200-0300 204.97 2,200 187.55 2,028 182.47 1,840 233.97 180.55 144.49
      0300-0400 204.97 2,194 187.55 2,023 182.47 1,840 233.98 180.51 144.44
      0400-0500 204.97 2,190 187.54 2,017 182.47 1,840 233.91 180.49 144.38
      0500-0600 204.97 2,192 187.54 2,009 182.47 1,840 233.89 180.47 144.32
      0600-0700 204.97 2,200 187.53 2,000 182.47 1,840 233.95 180.37 144.27
      0700-0800 187.53 1,993 182.47 1,840 233.95 180.35 144.25
      0800-0900
      0900-1000
      1000-1100
      1100-1200
      1200-1300
      1300-1400
      1400-1500
      1500-1600
      1600-1700
      1700-1800
      1800-1900
      1900-2000
      2000-2100
      2100-2200
      2200-2300
      2300-2400
      Average 204.97 2,201 187.54 2,017 182.47 1,840 233.95 180.48 144.41

      💧 These sites are not operated and maintained by Reclamation 💧

      TIME
      (MST)
      BELOW LAGUNA YUMA GAGE NIB BROCK SIB 242 WELLFIELD
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      INFLOW
      (CFS)
      STORAGE
      (KAF)
      RELEASE
      (CFS)
      FLOW
      (CFS)
      FLOW
      (CFS)
      0000-0100 124.49 411 112.29 1,250 105.33 1,154 0 8.17 184 200 58
      0100-0200 124.48 409 112.30 1,253 105.33 1,157 0 8.15 184 201 58
      0200-0300 124.47 406 112.31 1,260 105.34 1,162 0 8.13 208 200 58
      0300-0400 124.46 404 112.31 1,260 105.34 1,163 0 8.09 465 201 58
      0400-0500 124.45 401 112.31 1,260 105.35 1,166 0 8.05 465 201 58
      0500-0600 124.44 400 112.30 1,260 105.35 1,170 0 8.00 667 201 58
      0600-0700 124.43 396 112.30 1,253 105.35 1,170 0 7.93 812 201 58
      0700-0800 124.44 112.29 105.35 1,170 0 7.91 854 201 58
      0800-0900
      0900-1000
      1000-1100
      1100-1200
      1200-1300
      1300-1400
      1400-1500
      1500-1600
      1600-1700
      1700-1800
      1800-1900
      1900-2000
      2000-2100
      2100-2200
      2200-2300
      2300-2400
      Average 124.46 404 112.30 1,256 105.34 1,164 00 8.05 480 201 58

  • Thursday, 12-04-2025


      TIME
      (MST)
      LAKE MEAD/HOOVER DAM LAKE MOHAVE/DAVIS DAM LAKE HAVASU/PARKER DAM
      ELEV
      (FT)
      STORAGE
      (KAF)
      RELEASE
      (CFS)
      ELEV
      (FT)
      STORAGE
      (KAF)
      RELEASE
      (CFS)
      ELEV
      (FT)
      STORAGE
      (KAF)
      RELEASE
      (CFS)
      0000-0100 1,059.26 8,367.08 1,900 640.68 1,694.12 2,226 448.84 547.58 1,888
      0100-0200 1,059.27 8,367.84 1,791 640.68 1,694.20 2,214 448.84 547.42 1,839
      0200-0300 1,059.29 8,369.35 1,791 640.66 1,693.57 2,214 448.85 547.75 1,863
      0300-0400 1,059.28 8,368.59 1,827 640.65 1,693.45 2,238 448.84 547.42 1,863
      0400-0500 1,059.30 8,370.11 1,815 640.66 1,693.62 2,214 448.82 547.11 1,839
      0500-0600 1,059.30 8,370.11 2,323 640.66 1,693.57 2,214 448.84 547.50 1,863
      0600-0700 1,059.28 8,368.59 4,368 640.66 1,693.68 2,202 448.84 547.54 1,863
      0700-0800 1,059.30 8,370.11 10,805 640.69 1,694.48 2,214 448.82 547.11 1,839
      0800-0900 1,059.33 8,372.37 4,259 640.71 1,694.98 2,202 448.83 547.38 1,863
      0900-1000 1,059.33 8,372.37 1,343 640.73 1,695.68 2,202 448.86 547.87 1,863
      1000-1100 1,059.31 8,370.86 1,258 640.73 1,695.68 2,214 448.84 547.58 1,863
      1100-1200 1,059.32 8,371.62 1,004 640.73 1,695.68 2,214 448.81 546.92 1,549
      1200-1300 1,059.36 8,374.64 956 640.69 1,694.45 2,202 448.82 547.15 1,525
      1300-1400 1,059.35 8,373.88 1,016 640.72 1,695.21 2,202 448.80 546.80 1,549
      1400-1500 1,059.35 8,373.88 1,004 640.69 1,694.59 2,202 448.78 546.43 1,863
      1500-1600 1,059.35 8,373.88 1,089 640.66 1,693.54 2,214 448.78 546.38 1,863
      1600-1700 1,059.35 8,373.88 1,634 640.60 1,692.09 2,202 448.78 546.36 1,863
      1700-1800 1,059.36 8,374.64 4,380 640.64 1,693.07 2,202 448.77 546.24 1,863
      1800-1900 1,059.36 8,374.64 5,772 640.66 1,693.79 2,202 448.73 545.29 4,598
      1900-2000 1,059.38 8,376.15 5,203 640.66 1,693.62 2,202 448.73 545.35 4,671
      2000-2100 1,059.37 8,375.40 7,054 640.67 1,693.93 2,202 448.72 545.18 4,695
      2100-2200 1,059.37 8,375.40 4,695 640.68 1,694.34 2,202 448.70 544.77 1,912
      2200-2300 1,059.38 8,376.15 5,663 640.71 1,694.98 2,202 448.69 544.56 1,912
      2300-2400 1,059.39 8,376.91 3,291 640.69 1,694.48 2,202 448.70 544.85 1,815
      Average 1,059.33 8,372.44 3,177 640.68 1,694.20 2,209 448.79 546.60 2,172
      TIME
      (MST)
      Below Big Bend Below Needles Bridge RS 41
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      0000-0100 479.14 2,543 451.50 4,077 449.62 2,566
      0100-0200 479.14 2,535 451.50 4,075 449.62 2,673
      0200-0300 479.14 2,541 451.50 4,079 449.61 2,769
      0300-0400 479.15 2,549 451.50 4,077 449.61 2,642
      0400-0500 479.16 2,556 451.50 4,074 449.60 2,676
      0500-0600 479.15 2,552 451.50 4,071 449.61 2,520
      0600-0700 479.15 2,551 451.50 4,068 449.61 2,534
      0700-0800 479.16 2,558 451.50 4,069 449.60 2,633
      0800-0900 479.15 2,554 451.50 4,078 449.59 2,734
      0900-1000 479.16 2,561 451.50 4,095 449.56 2,860
      1000-1100 479.16 2,564 451.50 4,102 449.54 2,952
      1100-1200 479.16 2,566 451.50 4,109 449.51 3,039
      1200-1300 479.16 2,561 451.50 4,117 449.51 2,892
      1300-1400 479.15 2,555 451.50 4,109 449.52 2,788
      1400-1500 479.15 2,546 451.50 4,103 449.53 2,747
      1500-1600 479.14 2,538 451.50 4,099 449.53 2,770
      1600-1700 479.14 2,537 451.50 4,097 449.51 2,734
      1700-1800 479.14 2,545 451.50 4,090 449.49 2,618
      1800-1900 479.12 2,517 451.50 4,078 449.50 2,525
      1900-2000 479.11 2,512 451.50 4,074 449.52 2,496
      2000-2100 479.12 2,519 451.50 4,072 449.53 2,495
      2100-2200 479.12 2,522 451.50 4,071 449.51 2,598
      2200-2300 479.12 2,522 451.50 4,069 449.48 2,569
      2300-2400 479.12 2,521 451.50 4,067 449.50 2,538
      Average 479.14 2,543 451.50 4,084 449.55 2,682
      TIME
      (MST)
      Parker Gage Water Wheel I-10 Bridge MCINTYRE PARK TAYLOR FERRY OXBOW BRIDGE
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      0000-0100 340.45 1,487 297.19 1,490 244.41 1,820 235.28 1,734 226.31 2,387 216.25 2,114
      0100-0200 340.64 1,751 297.24 1,534 244.37 1,774 235.26 1,719 226.34 2,411 216.25 2,112
      0200-0300 340.67 1,798 297.28 1,579 244.34 1,728 235.24 1,699 226.36 2,424 216.25 2,111
      0300-0400 340.56 1,636 297.33 1,627 244.31 1,690 235.22 1,668 226.36 2,425 216.25 2,111
      0400-0500 340.52 1,582 297.43 1,726 244.29 1,660 235.19 1,635 226.36 2,421 216.25 2,111
      0500-0600 340.61 1,707 297.57 1,877 244.27 1,638 235.16 1,605 226.34 2,407 216.25 2,113
      0600-0700 340.69 1,827 297.70 2,026 244.25 1,620 235.13 1,578 226.31 2,387 216.25 2,115
      0700-0800 340.74 1,900 297.77 2,104 244.25 1,608 235.11 1,550 226.29 2,373 216.26 2,118
      0800-0900 340.62 1,723 297.78 2,108 244.24 1,606 235.09 1,533 226.26 2,347 216.26 2,125
      0900-1000 340.51 1,572 297.74 2,061 244.24 1,599 235.08 1,521 226.22 2,323 216.27 2,131
      1000-1100 340.55 1,626 297.68 2,001 244.23 1,593 235.07 1,511 226.20 2,302 216.27 2,134
      1100-1200 340.57 1,658 297.63 1,940 244.23 1,585 235.06 1,504 226.17 2,283 216.27 2,134
      1200-1300 340.52 1,587 297.58 1,885 244.23 1,582 235.06 1,497 226.15 2,270 216.27 2,130
      1300-1400 340.46 1,497 297.54 1,843 244.22 1,576 235.05 1,490 226.14 2,263 216.26 2,125
      1400-1500 340.41 1,433 297.51 1,816 244.22 1,575 235.04 1,486 226.13 2,251 216.26 2,119
      1500-1600 340.39 1,414 297.50 1,807 244.24 1,604 235.04 1,482 226.12 2,244 216.25 2,116
      1600-1700 340.53 1,602 297.50 1,802 244.29 1,670 235.04 1,481 226.12 2,243 216.25 2,113
      1700-1800 340.70 1,843 297.49 1,797 244.35 1,740 235.04 1,484 226.11 2,241 216.25 2,111
      1800-1900 340.67 1,792 297.48 1,778 244.39 1,789 235.06 1,501 226.10 2,234 216.25 2,109
      1900-2000 340.66 1,787 297.46 1,759 244.41 1,824 235.09 1,532 226.10 2,232 216.24 2,107
      2000-2100 341.52 3,292 297.44 1,736 244.44 1,855 235.12 1,569 226.11 2,237 216.24 2,106
      2100-2200 341.92 4,214 297.41 1,706 244.44 1,860 235.16 1,603 226.12 2,250 216.24 2,105
      2200-2300 341.87 4,087 297.37 1,671 244.43 1,840 235.18 1,632 226.15 2,269 216.24 2,104
      2300-2400 341.27 2,807 297.34 1,636 244.41 1,819 235.20 1,654 226.18 2,291 216.24 2,103
      Average 340.75 1,984 297.50 1,804 244.31 1,694 235.12 1,570 226.21 2,313 216.25 2,116
      TIME
      (MST)
      CIBOLA PICACHO PARK MARTINEZ LAKE SENATOR
      WASH
      ABOVE
      IMPERIAL DAM
      ABOVE
      LAGUNA DAM
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      ELEV
      (FT)
      ELEV
      (FT)
      ELEV
      (FT)
      0000-0100 205.04 2,372 187.74 2,305 182.70 2,321 236.10 180.66 145.59
      0100-0200 205.03 2,348 187.73 2,284 182.70 2,306 236.03 180.66 145.52
      0200-0300 205.02 2,328 187.71 2,263 182.69 2,285 235.97 180.62 145.46
      0300-0400 205.01 2,313 187.70 2,242 182.68 2,271 235.91 180.61 145.41
      0400-0500 205.01 2,297 187.68 2,222 182.67 2,253 235.83 180.57 145.37
      0500-0600 205.01 2,295 187.66 2,194 182.65 2,220 235.72 180.48 145.34
      0600-0700 205.01 2,299 187.65 2,174 182.64 2,199 235.57 180.39 145.30
      0700-0800 205.01 2,312 187.63 2,150 182.63 2,178 235.40 180.29 145.28
      0800-0900 205.02 2,340 187.62 2,129 182.61 2,138 235.29 180.23 145.25
      0900-1000 205.03 2,369 187.61 2,109 182.60 2,116 235.18 180.20 145.24
      1000-1100 205.04 2,392 187.59 2,080 182.59 2,085 235.04 180.18 145.23
      1100-1200 205.05 2,414 187.57 2,063 182.57 2,037 234.88 180.24 145.22
      1200-1300 205.06 2,431 187.56 2,043 182.55 2,003 234.78 180.31 145.22
      1300-1400 205.06 2,436 187.55 2,031 182.54 1,975 234.63 180.34 145.22
      1400-1500 205.06 2,432 187.55 2,025 182.52 1,950 234.51 180.40 145.22
      1500-1600 205.05 2,421 187.54 2,020 182.51 1,914 234.34 180.44 145.17
      1600-1700 205.05 2,400 187.54 2,014 182.50 1,897 234.21 180.50 145.11
      1700-1800 205.03 2,364 187.54 2,015 182.49 1,871 234.11 180.53 145.04
      1800-1900 205.02 2,333 187.54 2,019 182.48 1,852 234.03 180.53 144.98
      1900-2000 205.01 2,312 187.54 2,020 182.47 1,840 234.00 180.50 144.92
      2000-2100 205.01 2,292 187.55 2,023 182.47 1,840 233.98 180.49 144.86
      2100-2200 205.00 2,271 187.55 2,027 182.47 1,840 233.99 180.48 144.79
      2200-2300 204.99 2,254 187.55 2,030 182.47 1,840 233.96 180.49 144.73
      2300-2400 204.99 2,239 187.55 2,032 182.47 1,840 233.95 180.53 144.67
      Average 205.02 2,344 187.60 2,105 182.57 2,045 234.89 180.44 145.17

      💧 These sites are not operated and maintained by Reclamation 💧

      TIME
      (MST)
      BELOW LAGUNA YUMA GAGE NIB BROCK SIB 242 WELLFIELD
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      INFLOW
      (CFS)
      STORAGE
      (KAF)
      RELEASE
      (CFS)
      FLOW
      (CFS)
      FLOW
      (CFS)
      0000-0100 124.58 430 112.26 1,240 105.34 1,163 0 8.31 0 203 58
      0100-0200 124.57 430 112.25 1,230 105.34 1,160 0 8.31 0 203 58
      0200-0300 124.57 428 112.24 1,230 105.33 1,155 0 8.31 0 222 58
      0300-0400 124.56 427 112.25 1,230 105.33 1,156 0 8.31 0 228 58
      0400-0500 124.55 424 112.27 1,238 105.33 1,154 0 8.30 0 211 58
      0500-0600 124.55 423 112.27 1,240 105.33 1,155 0 8.31 0 202 58
      0600-0700 124.54 423 112.26 1,238 105.33 1,156 0 8.31 0 222 58
      0700-0800 124.54 421 112.25 1,230 105.33 1,155 0 8.31 0 231 58
      0800-0900 124.54 420 112.25 1,230 105.33 1,155 0 8.30 0 224 58
      0900-1000 124.53 419 112.24 1,230 105.33 1,151 0 8.30 0 218 58
      1000-1100 124.53 419 112.24 1,230 105.32 1,151 0 8.31 0 209 58
      1100-1200 124.52 418 112.25 1,230 105.32 1,148 0 8.30 0 196 58
      1200-1300 124.52 417 112.26 1,235 105.32 1,146 0 8.31 0 200 58
      1300-1400 124.52 417 112.27 1,240 105.32 1,148 0 8.31 0 229 58
      1400-1500 124.52 417 112.26 1,240 105.32 1,148 0 8.30 0 221 58
      1500-1600 124.52 417 112.27 1,240 105.32 1,148 0 8.30 0 218 58
      1600-1700 124.51 417 112.27 1,240 105.32 1,149 0 8.31 0 216 58
      1700-1800 124.51 416 112.26 1,235 105.32 1,148 0 8.30 59 213 58
      1800-1900 124.51 416 112.24 1,230 105.32 1,148 0 8.28 188 216 58
      1900-2000 124.52 418 112.23 1,230 105.32 1,148 0 8.27 188 217 58
      2000-2100 124.52 418 112.24 1,230 105.32 1,147 0 8.25 188 214 58
      2100-2200 124.52 416 112.25 1,230 105.32 1,148 0 8.22 185 204 58
      2200-2300 124.51 414 112.25 1,230 105.32 1,148 0 8.21 184 197 58
      2300-2400 124.50 412 112.27 1,240 105.32 1,149 0 8.19 184 199 58
      Average 124.53 420 112.25 1,234 105.33 1,151 00 8.29 49 213 58

  • Wednesday, 12-03-2025


      TIME
      (MST)
      LAKE MEAD/HOOVER DAM LAKE MOHAVE/DAVIS DAM LAKE HAVASU/PARKER DAM
      ELEV
      (FT)
      STORAGE
      (KAF)
      RELEASE
      (CFS)
      ELEV
      (FT)
      STORAGE
      (KAF)
      RELEASE
      (CFS)
      ELEV
      (FT)
      STORAGE
      (KAF)
      RELEASE
      (CFS)
      0000-0100 1,059.13 8,357.26 4,259 640.55 1,690.73 2,263 448.90 548.72 1,549
      0100-0200 1,059.20 8,362.55 4,404 640.57 1,691.29 2,263 448.86 547.96 1,549
      0200-0300 1,059.16 8,359.53 1,888 640.54 1,690.45 2,251 448.84 547.60 1,549
      0300-0400 1,059.16 8,359.53 1,767 640.61 1,692.26 2,251 448.91 548.82 1,549
      0400-0500 1,059.17 8,360.28 1,888 640.56 1,690.84 2,251 448.94 549.38 1,525
      0500-0600 1,059.16 8,359.53 3,013 640.50 1,689.23 2,238 448.89 548.47 1,549
      0600-0700 1,059.14 8,358.02 6,994 640.57 1,691.04 2,251 448.93 549.22 1,525
      0700-0800 1,059.18 8,361.04 13,504 640.58 1,691.40 2,226 448.95 549.67 1,573
      0800-0900 1,059.21 8,363.31 9,995 640.56 1,691.01 2,226 448.93 549.32 1,500
      0900-1000 1,059.19 8,361.79 1,537 640.70 1,694.82 2,226 448.90 548.62 1,573
      1000-1100 1,059.19 8,361.79 1,234 640.78 1,697.07 2,214 448.93 549.34 1,525
      1100-1200 1,059.20 8,362.55 1,283 640.74 1,695.96 2,226 448.99 550.51 1,549
      1200-1300 1,059.19 8,361.79 1,404 640.61 1,692.40 2,202 449.04 551.36 1,839
      1300-1400 1,059.19 8,361.79 1,597 640.63 1,692.93 2,214 448.97 550.10 1,888
      1400-1500 1,059.21 8,363.31 1,162 640.72 1,695.46 2,190 448.97 550.10 1,815
      1500-1600 1,059.24 8,365.57 1,754 640.68 1,694.12 2,214 449.00 550.58 1,888
      1600-1700 1,059.22 8,364.06 1,972 640.61 1,692.15 2,190 448.97 550.04 1,839
      1700-1800 1,059.23 8,364.82 4,538 640.57 1,691.09 2,226 448.90 548.60 1,863
      1800-1900 1,059.23 8,364.82 5,711 640.60 1,691.98 2,226 448.84 547.52 1,876
      1900-2000 1,059.23 8,364.82 6,002 640.61 1,692.37 2,214 448.92 549.13 4,525
      2000-2100 1,059.24 8,365.57 6,873 640.68 1,694.23 2,226 448.86 547.96 1,863
      2100-2200 1,059.24 8,365.57 4,658 640.68 1,694.12 2,214 448.84 547.54 1,912
      2200-2300 1,059.25 8,366.33 5,457 640.66 1,693.62 2,226 448.82 547.21 1,839
      2300-2400 1,059.24 8,365.57 4,780 640.66 1,693.57 2,214 448.85 547.75 1,839
      Average 1,059.20 8,362.55 4,070 640.62 1,692.67 2,227 448.92 548.98 1,813
      TIME
      (MST)
      Below Big Bend Below Needles Bridge RS 41
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      0000-0100 479.27 2,685 451.93 4,198 449.91 3,618
      0100-0200 479.25 2,659 451.88 4,135 449.91 3,640
      0200-0300 479.24 2,649 451.80 4,070 449.90 3,657
      0300-0400 479.23 2,640 451.74 4,068 449.89 3,596
      0400-0500 479.22 2,630 451.66 4,065 449.86 3,454
      0500-0600 479.21 2,614 451.60 4,068 449.83 3,438
      0600-0700 479.17 2,574 451.58 4,064 449.82 3,312
      0700-0800 479.21 2,613 451.56 4,067 449.82 3,136
      0800-0900 479.20 2,607 451.54 4,076 449.82 3,012
      0900-1000 479.22 2,623 451.52 4,098 449.78 3,043
      1000-1100 479.22 2,632 451.52 4,114 449.76 3,214
      1100-1200 479.23 2,635 451.51 4,112 449.71 3,465
      1200-1300 479.22 2,629 451.51 4,116 449.61 3,609
      1300-1400 479.22 2,622 451.51 4,116 449.53 3,524
      1400-1500 479.19 2,591 451.50 4,104 449.52 3,450
      1500-1600 479.15 2,546 451.50 4,094 449.49 3,161
      1600-1700 479.13 2,532 451.50 4,088 449.49 2,977
      1700-1800 479.11 2,512 451.50 4,083 449.48 2,802
      1800-1900 479.12 2,518 451.50 4,078 449.49 2,588
      1900-2000 479.12 2,516 451.50 4,074 449.54 2,338
      2000-2100 479.11 2,513 451.50 4,072 449.57 2,400
      2100-2200 479.12 2,516 451.50 4,071 449.60 2,436
      2200-2300 479.12 2,517 451.50 4,069 449.61 2,414
      2300-2400 479.13 2,526 451.50 4,074 449.62 2,465
      Average 479.18 2,587 451.58 4,091 449.69 3,115
      TIME
      (MST)
      Parker Gage Water Wheel I-10 Bridge MCINTYRE PARK TAYLOR FERRY OXBOW BRIDGE
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      0000-0100 340.54 1,617 297.23 1,527 244.50 1,935 235.42 1,889 226.60 2,612 216.53 2,373
      0100-0200 340.62 1,726 297.27 1,565 244.46 1,876 235.39 1,863 226.59 2,599 216.53 2,369
      0200-0300 340.58 1,667 297.33 1,626 244.43 1,840 235.36 1,829 226.57 2,585 216.52 2,365
      0300-0400 340.44 1,480 297.41 1,707 244.40 1,808 235.33 1,790 226.55 2,568 216.52 2,363
      0400-0500 340.37 1,379 297.53 1,831 244.37 1,768 235.30 1,754 226.52 2,549 216.52 2,361
      0500-0600 340.37 1,389 297.68 2,004 244.35 1,738 235.26 1,719 226.49 2,526 216.51 2,354
      0600-0700 340.40 1,421 297.82 2,155 244.33 1,714 235.23 1,686 226.46 2,499 216.50 2,346
      0700-0800 340.39 1,410 297.88 2,225 244.30 1,678 235.21 1,657 226.43 2,475 216.49 2,335
      0800-0900 340.32 1,319 297.87 2,220 244.27 1,635 235.19 1,639 226.39 2,447 216.48 2,322
      0900-1000 340.29 1,282 297.82 2,154 244.24 1,607 235.16 1,613 226.35 2,418 216.46 2,302
      1000-1100 340.35 1,361 297.75 2,079 244.25 1,616 235.14 1,584 226.32 2,397 216.43 2,279
      1100-1200 340.39 1,413 297.67 1,988 244.27 1,634 235.12 1,562 226.29 2,374 216.40 2,253
      1200-1300 340.40 1,425 297.58 1,894 244.27 1,635 235.10 1,541 226.26 2,351 216.37 2,226
      1300-1400 340.39 1,413 297.51 1,810 244.26 1,621 235.10 1,540 226.24 2,337 216.36 2,210
      1400-1500 340.46 1,505 297.43 1,729 244.26 1,628 235.10 1,545 226.22 2,316 216.35 2,202
      1500-1600 340.57 1,657 297.36 1,658 244.29 1,672 235.10 1,542 226.19 2,300 216.33 2,188
      1600-1700 340.58 1,664 297.30 1,595 244.35 1,749 235.10 1,542 226.16 2,279 216.32 2,175
      1700-1800 340.58 1,665 297.24 1,539 244.43 1,844 235.10 1,549 226.15 2,268 216.30 2,162
      1800-1900 340.60 1,688 297.21 1,505 244.48 1,908 235.13 1,571 226.14 2,264 216.29 2,151
      1900-2000 340.58 1,660 297.18 1,475 244.51 1,941 235.16 1,612 226.15 2,270 216.28 2,140
      2000-2100 340.63 1,734 297.17 1,463 244.51 1,938 235.21 1,660 226.16 2,279 216.27 2,131
      2100-2200 341.41 3,084 297.15 1,446 244.49 1,915 235.25 1,700 226.19 2,294 216.26 2,124
      2200-2300 341.21 2,696 297.15 1,449 244.47 1,892 235.27 1,726 226.22 2,323 216.26 2,119
      2300-2400 340.65 1,760 297.16 1,462 244.44 1,860 235.28 1,736 226.27 2,360 216.25 2,116
      Average 340.55 1,642 297.45 1,754 244.37 1,769 235.21 1,660 226.33 2,404 216.40 2,249
      TIME
      (MST)
      CIBOLA PICACHO PARK MARTINEZ LAKE SENATOR
      WASH
      ABOVE
      IMPERIAL DAM
      ABOVE
      LAGUNA DAM
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      ELEV
      (FT)
      ELEV
      (FT)
      ELEV
      (FT)
      0000-0100 205.34 2,994 188.13 2,904 182.88 2,693 236.64 180.71 147.16
      0100-0200 205.32 2,957 188.14 2,910 182.90 2,724 236.58 180.73 147.09
      0200-0300 205.30 2,925 188.13 2,906 182.91 2,757 236.59 180.71 147.03
      0300-0400 205.28 2,895 188.13 2,895 182.92 2,782 236.61 180.68 146.96
      0400-0500 205.26 2,872 188.11 2,874 182.94 2,808 236.54 180.65 146.89
      0500-0600 205.25 2,853 188.10 2,851 182.94 2,814 236.61 180.63 146.82
      0600-0700 205.24 2,838 188.09 2,830 182.94 2,814 236.53 180.55 146.75
      0700-0800 205.23 2,823 188.06 2,798 182.94 2,814 236.50 180.53 146.69
      0800-0900 205.23 2,813 188.04 2,761 182.94 2,814 236.54 180.49 146.62
      0900-1000 205.22 2,804 188.01 2,721 182.94 2,814 236.55 180.45 146.55
      1000-1100 205.22 2,796 187.99 2,681 182.93 2,794 236.48 180.41 146.49
      1100-1200 205.21 2,783 187.97 2,645 182.93 2,790 236.52 180.38 146.42
      1200-1300 205.20 2,774 187.94 2,603 182.91 2,755 236.53 180.38 146.36
      1300-1400 205.19 2,760 187.92 2,569 182.88 2,693 236.51 180.40 146.30
      1400-1500 205.18 2,736 187.90 2,539 182.86 2,644 236.51 180.43 146.23
      1500-1600 205.16 2,717 187.88 2,511 182.84 2,601 236.47 180.44 146.16
      1600-1700 205.15 2,692 187.86 2,481 182.82 2,556 236.48 180.42 146.10
      1700-1800 205.13 2,635 187.84 2,459 182.80 2,521 236.43 180.43 146.03
      1800-1900 205.11 2,587 187.83 2,435 182.78 2,491 236.38 180.45 145.96
      1900-2000 205.10 2,552 187.81 2,414 182.77 2,452 236.34 180.52 145.91
      2000-2100 205.09 2,516 187.80 2,393 182.76 2,430 236.30 180.55 145.84
      2100-2200 205.07 2,472 187.78 2,368 182.74 2,401 236.21 180.58 145.77
      2200-2300 205.06 2,438 187.77 2,345 182.73 2,380 236.19 180.61 145.71
      2300-2400 205.05 2,404 187.76 2,328 182.72 2,357 236.14 180.64 145.65
      Average 205.19 2,735 187.96 2,634 182.86 2,654 236.47 180.53 146.39

      💧 These sites are not operated and maintained by Reclamation 💧

      TIME
      (MST)
      BELOW LAGUNA YUMA GAGE NIB BROCK SIB 242 WELLFIELD
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      INFLOW
      (CFS)
      STORAGE
      (KAF)
      RELEASE
      (CFS)
      FLOW
      (CFS)
      FLOW
      (CFS)
      0000-0100 124.75 470 112.23 1,223 105.32 1,148 0 8.32 0 169 58
      0100-0200 124.75 469 112.22 1,220 105.32 1,146 0 8.32 0 179 58
      0200-0300 124.74 467 112.21 1,220 105.31 1,140 0 8.32 0 165 58
      0300-0400 124.73 466 112.21 1,215 105.31 1,140 0 8.32 0 186 58
      0400-0500 124.73 465 112.21 1,218 105.31 1,139 0 8.31 0 175 58
      0500-0600 124.72 463 112.22 1,220 105.31 1,138 0 8.31 0 191 58
      0600-0700 124.71 460 112.24 1,230 105.31 1,140 0 8.32 0 192 58
      0700-0800 124.70 460 112.26 1,235 105.31 1,142 0 8.32 0 194 58
      0800-0900 124.70 458 112.28 1,243 105.32 1,148 0 8.31 0 194 58
      0900-1000 124.69 456 112.29 1,250 105.33 1,154 0 8.32 0 193 58
      1000-1100 124.68 454 112.30 1,250 105.33 1,157 0 8.32 0 194 58
      1100-1200 124.67 452 112.30 1,258 105.34 1,163 0 8.31 0 192 58
      1200-1300 124.66 450 112.31 1,260 105.34 1,163 0 8.31 0 191 58
      1300-1400 124.66 448 112.31 1,260 105.34 1,163 0 8.31 0 190 57
      1400-1500 124.65 447 112.32 1,265 105.34 1,163 0 8.31 0 189 57
      1500-1600 124.64 444 112.32 1,263 105.34 1,163 0 8.31 0 189 58
      1600-1700 124.63 443 112.31 1,260 105.34 1,163 0 8.31 0 188 58
      1700-1800 124.63 441 112.31 1,260 105.34 1,163 0 8.31 0 171 58
      1800-1900 124.61 438 112.30 1,253 105.34 1,163 0 8.31 0 195 58
      1900-2000 124.60 435 112.30 1,250 105.34 1,163 0 8.31 0 199 58
      2000-2100 124.61 437 112.29 1,250 105.34 1,163 0 8.31 0 201 58
      2100-2200 124.60 436 112.29 1,250 105.34 1,163 0 8.31 0 201 58
      2200-2300 124.59 434 112.28 1,240 105.34 1,163 0 8.31 0 201 58
      2300-2400 124.59 432 112.27 1,240 105.34 1,163 0 8.31 0 202 58
      Average 124.67 451 112.27 1,243 105.33 1,154 00 8.31 00 189 58

  • Tuesday, 12-02-2025


      TIME
      (MST)
      LAKE MEAD/HOOVER DAM LAKE MOHAVE/DAVIS DAM LAKE HAVASU/PARKER DAM
      ELEV
      (FT)
      STORAGE
      (KAF)
      RELEASE
      (CFS)
      ELEV
      (FT)
      STORAGE
      (KAF)
      RELEASE
      (CFS)
      ELEV
      (FT)
      STORAGE
      (KAF)
      RELEASE
      (CFS)
      0000-0100 1,059.06 8,351.97 6,256 640.43 1,687.29 2,347 448.97 550.02 1,573
      0100-0200 1,059.07 8,352.73 2,940 640.42 1,686.98 2,360 448.97 550.02 1,525
      0200-0300 1,059.04 8,350.46 2,759 640.46 1,688.04 2,360 448.96 549.77 1,549
      0300-0400 1,059.06 8,351.97 2,747 640.43 1,687.32 2,372 448.95 549.71 1,525
      0400-0500 1,059.09 8,354.24 2,759 640.43 1,687.23 2,360 448.96 549.89 1,549
      0500-0600 1,059.08 8,353.48 3,824 640.41 1,686.84 2,360 448.97 550.02 1,525
      0600-0700 1,059.06 8,351.97 7,345 640.46 1,688.12 2,384 448.96 549.77 1,573
      0700-0800 1,059.09 8,354.24 10,866 640.43 1,687.40 4,658 448.95 549.63 1,525
      0800-0900 1,059.10 8,354.99 7,248 640.44 1,687.68 4,683 448.96 549.92 1,573
      0900-1000 1,059.09 8,354.24 3,412 640.49 1,689.01 4,658 448.95 549.63 1,549
      1000-1100 1,059.08 8,353.48 4,017 640.50 1,689.20 4,634 448.94 549.50 1,549
      1100-1200 1,059.14 8,358.02 3,098 640.48 1,688.54 4,622 448.96 549.85 1,549
      1200-1300 1,059.13 8,357.26 2,977 640.42 1,686.93 4,634 448.94 549.40 1,549
      1300-1400 1,059.04 8,350.46 2,916 640.38 1,685.96 2,396 448.90 548.76 1,839
      1400-1500 1,059.14 8,358.02 2,081 640.62 1,692.54 2,360 448.88 548.35 1,888
      1500-1600 1,059.19 8,361.79 2,977 640.34 1,684.90 2,347 448.86 547.89 1,839
      1600-1700 1,059.07 8,352.73 3,570 640.45 1,687.87 2,372 448.87 548.16 1,863
      1700-1800 1,059.10 8,354.99 5,336 640.48 1,688.62 2,299 448.91 548.86 1,863
      1800-1900 1,059.13 8,357.26 7,212 640.33 1,684.60 2,263 448.84 547.52 1,888
      1900-2000 1,059.12 8,356.51 6,970 640.51 1,689.48 2,251 448.91 548.95 4,429
      2000-2100 1,059.12 8,356.51 10,200 640.46 1,688.04 2,263 448.89 548.56 1,912
      2100-2200 1,059.18 8,361.04 8,180 640.45 1,687.84 2,251 448.87 548.04 1,839
      2200-2300 1,059.16 8,359.53 7,865 640.50 1,689.18 2,238 448.84 547.42 1,863
      2300-2400 1,059.14 8,358.02 5,433 640.52 1,689.87 2,238 448.87 548.14 1,863
      Average 1,059.10 8,355.25 5,125 640.45 1,687.89 2,905 448.92 549.07 1,800
      TIME
      (MST)
      Below Big Bend Below Needles Bridge RS 41
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      0000-0100 479.26 2,666 451.41 4,067 449.80 2,653
      0100-0200 479.25 2,665 451.41 4,064 449.82 2,678
      0200-0300 479.25 2,658 451.41 4,063 449.83 2,741
      0300-0400 479.25 2,663 451.41 4,062 449.83 2,805
      0400-0500 479.26 2,665 451.41 4,061 449.83 2,774
      0500-0600 479.25 2,657 451.41 4,060 449.83 2,789
      0600-0700 479.25 2,662 451.41 4,058 449.81 2,802
      0700-0800 479.24 2,654 451.41 4,058 449.79 2,755
      0800-0900 479.25 2,657 451.41 4,076 449.80 2,742
      0900-1000 479.33 2,743 451.41 4,099 449.80 2,742
      1000-1100 479.70 3,171 451.41 4,116 449.79 2,803
      1100-1200 480.22 3,800 451.41 4,129 449.78 2,878
      1200-1300 480.62 4,323 451.41 4,145 449.77 2,881
      1300-1400 480.88 4,678 451.41 4,136 449.74 2,927
      1400-1500 481.00 4,842 451.41 4,112 449.75 2,785
      1500-1600 480.96 4,783 451.41 4,105 449.79 2,534
      1600-1700 480.67 4,388 451.41 4,100 449.78 2,896
      1700-1800 480.27 3,869 451.44 4,090 449.77 2,940
      1800-1900 479.93 3,439 451.57 4,079 449.77 3,018
      1900-2000 479.67 3,138 451.71 4,075 449.77 3,098
      2000-2100 479.52 2,959 451.83 4,102 449.81 3,206
      2100-2200 479.41 2,837 451.93 4,196 449.85 3,407
      2200-2300 479.34 2,761 451.97 4,238 449.86 3,581
      2300-2400 479.30 2,719 451.97 4,237 449.88 3,631
      Average 479.75 3,267 451.52 4,105 449.80 2,919
      TIME
      (MST)
      Parker Gage Water Wheel I-10 Bridge MCINTYRE PARK TAYLOR FERRY OXBOW BRIDGE
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      0000-0100 340.65 1,764 297.56 1,869 245.25 2,785 236.24 2,874 227.35 3,243 216.76 2,597
      0100-0200 340.68 1,815 297.57 1,880 245.16 2,689 236.20 2,831 227.43 3,309 216.83 2,665
      0200-0300 340.55 1,630 297.65 1,962 245.08 2,599 236.15 2,759 227.47 3,348 216.91 2,750
      0300-0400 340.39 1,409 297.79 2,119 245.01 2,525 236.07 2,669 227.48 3,359 216.99 2,834
      0400-0500 340.33 1,330 297.90 2,256 244.95 2,453 236.00 2,574 227.47 3,344 217.06 2,912
      0500-0600 340.40 1,417 297.96 2,316 244.87 2,368 235.92 2,482 227.42 3,306 217.12 2,975
      0600-0700 340.48 1,523 297.94 2,294 244.80 2,284 235.85 2,396 227.37 3,255 217.16 3,021
      0700-0800 340.43 1,463 297.87 2,221 244.74 2,220 235.78 2,311 227.29 3,186 217.18 3,046
      0800-0900 340.37 1,388 297.80 2,137 244.69 2,164 235.72 2,234 227.21 3,117 217.18 3,043
      0900-1000 340.30 1,301 297.74 2,062 244.64 2,104 235.65 2,154 227.13 3,048 217.16 3,017
      1000-1100 340.32 1,324 297.66 1,983 244.61 2,065 235.59 2,083 227.06 2,983 217.12 2,979
      1100-1200 340.38 1,403 297.59 1,897 244.60 2,049 235.53 2,021 226.98 2,918 217.08 2,935
      1200-1300 340.41 1,439 297.51 1,812 244.59 2,043 235.49 1,971 226.91 2,858 217.03 2,880
      1300-1400 340.42 1,448 297.44 1,743 244.60 2,050 235.46 1,933 226.84 2,800 216.98 2,821
      1400-1500 340.34 1,351 297.40 1,694 244.62 2,072 235.43 1,907 226.77 2,750 216.92 2,762
      1500-1600 340.38 1,400 297.36 1,660 244.65 2,109 235.42 1,893 226.71 2,696 216.86 2,701
      1600-1700 340.53 1,595 297.34 1,634 244.68 2,144 235.42 1,891 226.66 2,654 216.80 2,643
      1700-1800 340.66 1,781 297.30 1,601 244.69 2,158 235.42 1,897 226.61 2,621 216.75 2,591
      1800-1900 340.70 1,845 297.27 1,568 244.68 2,144 235.44 1,914 226.59 2,599 216.71 2,545
      1900-2000 340.63 1,733 297.25 1,543 244.66 2,121 235.45 1,929 226.58 2,594 216.67 2,509
      2000-2100 340.65 1,766 297.23 1,522 244.64 2,101 235.46 1,938 226.58 2,592 216.63 2,467
      2100-2200 341.42 3,086 297.22 1,512 244.61 2,067 235.46 1,938 226.58 2,596 216.59 2,432
      2200-2300 341.20 2,670 297.21 1,506 244.58 2,027 235.45 1,930 226.59 2,602 216.56 2,403
      2300-2400 340.71 1,853 297.21 1,510 244.55 1,988 235.44 1,912 226.59 2,605 216.54 2,385
      Average 340.56 1,656 297.53 1,846 244.75 2,222 235.67 2,185 226.99 2,933 216.90 2,746
      TIME
      (MST)
      CIBOLA PICACHO PARK MARTINEZ LAKE SENATOR
      WASH
      ABOVE
      IMPERIAL DAM
      ABOVE
      LAGUNA DAM
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      ELEV
      (FT)
      ELEV
      (FT)
      ELEV
      (FT)
      0000-0100 205.34 2,995 187.94 2,601 182.69 2,290 236.85 180.73 148.92
      0100-0200 205.33 2,976 187.96 2,632 182.71 2,330 236.89 180.72 148.91
      0200-0300 205.32 2,967 187.97 2,655 182.73 2,381 236.87 180.68 148.82
      0300-0400 205.33 2,967 187.98 2,668 182.75 2,419 236.85 180.66 148.74
      0400-0500 205.33 2,982 187.99 2,676 182.77 2,456 236.82 180.66 148.66
      0500-0600 205.35 3,009 187.99 2,677 182.78 2,490 236.82 180.65 148.58
      0600-0700 205.37 3,046 187.98 2,673 182.80 2,531 236.77 180.61 148.50
      0700-0800 205.40 3,093 187.98 2,661 182.81 2,544 236.77 180.56 148.42
      0800-0900 205.44 3,151 187.97 2,647 182.81 2,553 236.79 180.54 148.35
      0900-1000 205.48 3,213 187.96 2,634 182.82 2,564 236.78 180.48 148.27
      1000-1100 205.51 3,271 187.95 2,621 182.82 2,564 236.76 180.46 148.19
      1100-1200 205.54 3,316 187.95 2,615 182.82 2,564 236.73 180.46 148.11
      1200-1300 205.55 3,342 187.94 2,604 182.82 2,564 236.76 180.48 148.03
      1300-1400 205.56 3,356 187.94 2,606 182.81 2,547 236.74 180.53 147.96
      1400-1500 205.56 3,353 187.95 2,614 182.81 2,544 236.70 180.57 147.88
      1500-1600 205.55 3,344 187.96 2,635 182.81 2,544 236.69 180.59 147.81
      1600-1700 205.54 3,317 187.97 2,659 182.81 2,544 236.72 180.60 147.74
      1700-1800 205.52 3,280 187.99 2,690 182.81 2,544 236.66 180.61 147.66
      1800-1900 205.49 3,243 188.02 2,728 182.81 2,546 236.68 180.62 147.59
      1900-2000 205.47 3,202 188.04 2,763 182.82 2,564 236.64 180.65 147.51
      2000-2100 205.45 3,161 188.07 2,801 182.83 2,580 236.62 180.65 147.44
      2100-2200 205.42 3,119 188.09 2,835 182.84 2,608 236.62 180.66 147.37
      2200-2300 205.39 3,076 188.10 2,861 182.85 2,635 236.64 180.68 147.30
      2300-2400 205.37 3,036 188.12 2,885 182.87 2,663 236.66 180.70 147.23
      Average 205.44 3,159 187.99 2,685 182.80 2,524 236.74 180.61 148.08

      💧 These sites are not operated and maintained by Reclamation 💧

      TIME
      (MST)
      BELOW LAGUNA YUMA GAGE NIB BROCK SIB 242 WELLFIELD
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      INFLOW
      (CFS)
      STORAGE
      (KAF)
      RELEASE
      (CFS)
      FLOW
      (CFS)
      FLOW
      (CFS)
      0000-0100 124.92 508 112.32 1,268 105.33 1,158 0 8.32 0 182 58
      0100-0200 124.92 508 112.31 1,260 105.32 1,149 0 8.32 0 180 58
      0200-0300 124.92 508 112.30 1,253 105.31 1,142 0 8.32 0 179 58
      0300-0400 124.91 506 112.28 1,250 105.31 1,140 0 8.32 0 182 58
      0400-0500 124.91 506 112.27 1,240 105.30 1,133 0 8.32 0 162 58
      0500-0600 124.90 504 112.27 1,240 105.30 1,130 0 8.32 0 184 58
      0600-0700 124.89 502 112.25 1,233 105.29 1,127 0 8.32 0 157 58
      0700-0800 124.89 501 112.25 1,230 105.29 1,125 0 8.32 0 184 58
      0800-0900 124.88 499 112.24 1,230 105.28 1,120 0 8.32 0 174 58
      0900-1000 124.87 497 112.25 1,230 105.28 1,120 0 8.32 0 166 58
      1000-1100 124.86 494 112.25 1,230 105.28 1,120 0 8.32 0 160 58
      1100-1200 124.85 492 112.26 1,235 105.28 1,120 0 8.32 0 154 57
      1200-1300 124.84 490 112.28 1,248 105.28 1,120 0 8.32 0 155 58
      1300-1400 124.83 488 112.29 1,250 105.28 1,119 0 8.32 0 155 58
      1400-1500 124.83 486 112.30 1,250 105.28 1,120 0 8.32 0 161 58
      1500-1600 124.82 485 112.28 1,248 105.28 1,120 0 8.32 0 161 58
      1600-1700 124.81 483 112.27 1,240 105.28 1,120 0 8.32 0 167 58
      1700-1800 124.79 480 112.28 1,243 105.29 1,126 0 8.32 0 168 58
      1800-1900 124.76 470 112.29 1,250 105.30 1,133 0 8.32 0 180 58
      1900-2000 124.77 474 112.29 1,250 105.31 1,143 0 8.31 0 168 58
      2000-2100 124.78 477 112.27 1,243 105.32 1,150 0 8.32 0 187 58
      2100-2200 124.77 476 112.26 1,238 105.33 1,155 0 8.32 0 174 58
      2200-2300 124.77 474 112.25 1,230 105.33 1,155 0 8.32 0 187 58
      2300-2400 124.76 473 112.24 1,230 105.32 1,149 0 8.32 0 172 58
      Average 124.84 491 112.27 1,242 105.30 1,133 00 8.32 00 171 58

  • Monday, 12-01-2025


      TIME
      (MST)
      LAKE MEAD/HOOVER DAM LAKE MOHAVE/DAVIS DAM LAKE HAVASU/PARKER DAM
      ELEV
      (FT)
      STORAGE
      (KAF)
      RELEASE
      (CFS)
      ELEV
      (FT)
      STORAGE
      (KAF)
      RELEASE
      (CFS)
      ELEV
      (FT)
      STORAGE
      (KAF)
      RELEASE
      (CFS)
      0000-0100 1,058.90 8,339.90 2,638 640.42 1,686.90 2,360 449.14 553.27 1,851
      0100-0200 1,058.94 8,342.92 1,210 640.39 1,686.10 2,347 449.13 553.19 1,863
      0200-0300 1,058.94 8,342.92 1,270 640.46 1,688.07 2,347 449.16 553.68 1,863
      0300-0400 1,058.93 8,342.16 1,222 640.47 1,688.48 2,335 449.16 553.80 1,863
      0400-0500 1,058.94 8,342.92 1,307 640.40 1,686.51 2,360 449.19 554.26 1,863
      0500-0600 1,058.96 8,344.42 1,876 640.38 1,685.93 2,347 449.20 554.50 1,839
      0600-0700 1,058.94 8,342.92 2,360 640.48 1,688.54 2,360 449.18 554.07 1,863
      0700-0800 1,058.96 8,344.42 9,184 640.38 1,685.87 2,347 449.17 553.99 1,863
      0800-0900 1,058.98 8,345.93 2,493 640.45 1,687.76 2,456 449.20 554.44 1,839
      0900-1000 1,058.98 8,345.93 1,258 640.56 1,690.95 2,408 449.19 554.23 1,863
      1000-1100 1,058.96 8,344.42 1,295 640.41 1,686.82 3,473 449.14 553.33 1,863
      1100-1200 1,058.98 8,345.93 1,210 640.54 1,690.40 3,376 449.15 553.48 1,839
      1200-1300 1,059.00 8,347.44 1,137 640.43 1,687.18 2,432 449.15 553.48 1,863
      1300-1400 1,058.99 8,346.68 1,355 640.38 1,685.90 2,444 449.12 552.88 1,863
      1400-1500 1,059.01 8,348.19 1,416 640.42 1,686.98 2,432 449.08 552.14 1,888
      1500-1600 1,059.01 8,348.19 1,512 640.38 1,685.79 2,360 449.06 551.87 1,839
      1600-1700 1,059.00 8,347.44 3,340 640.36 1,685.37 2,347 449.06 551.71 1,912
      1700-1800 1,058.99 8,346.68 5,784 640.33 1,684.60 2,360 449.04 551.40 4,622
      1800-1900 1,059.03 8,349.70 9,365 640.35 1,685.04 2,372 449.04 551.36 1,912
      1900-2000 1,059.01 8,348.19 7,623 640.35 1,685.01 2,360 449.01 550.78 1,839
      2000-2100 1,059.01 8,348.19 9,692 640.40 1,686.57 2,372 449.00 550.53 1,888
      2100-2200 1,059.04 8,350.46 6,546 640.45 1,687.87 2,335 448.99 550.37 1,839
      2200-2300 1,059.05 8,351.22 5,723 640.42 1,686.90 2,360 448.98 550.18 1,888
      2300-2400 1,059.03 8,349.70 5,929 640.43 1,687.29 2,347 448.97 550.00 1,815
      Average 1,058.98 8,346.12 3,614 640.42 1,686.95 2,460 449.10 552.62 1,977
      TIME
      (MST)
      Below Big Bend Below Needles Bridge RS 41
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      0000-0100 479.23 2,636 451.45 4,075 449.93 2,802
      0100-0200 479.24 2,650 451.44 4,070 449.91 2,900
      0200-0300 479.24 2,650 451.44 4,074 449.89 2,973
      0300-0400 479.24 2,650 451.43 4,073 449.84 2,978
      0400-0500 479.24 2,644 451.43 4,073 449.79 2,954
      0500-0600 479.19 2,593 451.42 4,070 449.77 2,929
      0600-0700 479.18 2,582 451.42 4,069 449.79 2,795
      0700-0800 479.19 2,592 451.42 4,069 449.81 2,743
      0800-0900 479.19 2,596 451.42 4,087 449.79 2,783
      0900-1000 479.19 2,599 451.42 4,106 449.79 2,971
      1000-1100 479.20 2,610 451.41 4,113 449.75 3,250
      1100-1200 479.23 2,642 451.41 4,112 449.71 3,242
      1200-1300 479.32 2,733 451.41 4,123 449.68 3,181
      1300-1400 479.49 2,924 451.41 4,113 449.66 3,127
      1400-1500 479.69 3,153 451.41 4,099 449.65 2,914
      1500-1600 479.72 3,193 451.41 4,091 449.66 2,791
      1600-1700 479.64 3,094 451.41 4,087 449.67 2,680
      1700-1800 479.53 2,968 451.41 4,080 449.66 2,599
      1800-1900 479.44 2,865 451.41 4,076 449.65 2,561
      1900-2000 479.37 2,792 451.41 4,073 449.68 2,450
      2000-2100 479.33 2,744 451.41 4,074 449.72 2,354
      2100-2200 479.30 2,710 451.41 4,074 449.76 2,425
      2200-2300 479.27 2,682 451.41 4,074 449.79 2,483
      2300-2400 479.26 2,668 451.41 4,070 449.79 2,585
      Average 479.33 2,749 451.42 4,084 449.76 2,811
      TIME
      (MST)
      Parker Gage Water Wheel I-10 Bridge MCINTYRE PARK TAYLOR FERRY OXBOW BRIDGE
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      0000-0100 342.04 4,540 297.57 1,875 245.24 2,771 236.04 2,629 226.95 2,893 216.44 2,288
      0100-0200 341.44 3,141 297.71 2,029 245.17 2,702 236.06 2,650 227.05 2,982 216.49 2,331
      0200-0300 340.89 2,137 298.05 2,432 245.10 2,625 236.05 2,641 227.15 3,062 216.54 2,383
      0300-0400 340.75 1,918 298.47 2,968 245.03 2,545 236.02 2,602 227.21 3,121 216.62 2,456
      0400-0500 340.91 2,170 298.85 3,486 244.95 2,461 235.97 2,542 227.25 3,154 216.72 2,558
      0500-0600 340.88 2,125 299.10 3,855 244.87 2,364 235.92 2,473 227.26 3,161 216.80 2,642
      0600-0700 340.77 1,946 299.23 4,052 244.79 2,274 235.85 2,394 227.24 3,148 216.88 2,724
      0700-0800 340.69 1,818 299.24 4,065 244.74 2,214 235.78 2,312 227.21 3,120 216.94 2,788
      0800-0900 340.72 1,870 299.14 3,910 244.70 2,176 235.72 2,232 227.17 3,083 216.98 2,829
      0900-1000 340.77 1,945 298.95 3,625 244.69 2,154 235.64 2,148 227.11 3,030 217.00 2,843
      1000-1100 340.80 1,998 298.71 3,288 244.69 2,154 235.59 2,084 227.04 2,973 216.99 2,840
      1100-1200 340.82 2,025 298.48 2,977 244.72 2,198 235.55 2,039 226.97 2,914 216.98 2,830
      1200-1300 340.78 1,955 298.28 2,712 244.81 2,302 235.52 2,007 226.90 2,854 216.96 2,801
      1300-1400 340.76 1,929 298.11 2,503 244.95 2,457 235.51 1,999 226.83 2,798 216.92 2,765
      1400-1500 340.72 1,865 297.97 2,336 245.09 2,614 235.54 2,024 226.78 2,754 216.88 2,725
      1500-1600 340.60 1,696 297.86 2,200 245.23 2,760 235.59 2,085 226.73 2,717 216.83 2,673
      1600-1700 340.60 1,694 297.77 2,098 245.34 2,879 235.67 2,183 226.71 2,698 216.79 2,627
      1700-1800 340.60 1,690 297.70 2,020 245.43 2,974 235.78 2,306 226.71 2,700 216.75 2,585
      1800-1900 340.69 1,832 297.66 1,972 245.49 3,042 235.89 2,439 226.75 2,729 216.71 2,553
      1900-2000 341.50 3,264 297.63 1,946 245.52 3,070 235.99 2,569 226.82 2,785 216.69 2,526
      2000-2100 341.28 2,817 297.62 1,928 245.52 3,065 236.09 2,689 226.91 2,862 216.67 2,510
      2100-2200 340.77 1,949 297.60 1,911 245.48 3,031 236.17 2,787 227.02 2,958 216.66 2,502
      2200-2300 340.55 1,627 297.59 1,898 245.42 2,968 236.22 2,851 227.15 3,062 216.68 2,515
      2300-2400 340.55 1,624 297.57 1,881 245.34 2,880 236.24 2,881 227.26 3,163 216.71 2,548
      Average 340.87 2,149 298.20 2,665 245.10 2,612 235.85 2,399 227.01 2,947 216.78 2,618
      TIME
      (MST)
      CIBOLA PICACHO PARK MARTINEZ LAKE SENATOR
      WASH
      ABOVE
      IMPERIAL DAM
      ABOVE
      LAGUNA DAM
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      ELEV
      (FT)
      ELEV
      (FT)
      ELEV
      (FT)
      0000-0100 205.12 2,602 187.60 2,104 182.56 2,021 238.08 180.68 150.19
      0100-0200 205.12 2,612 187.61 2,109 182.55 2,006 238.05 180.67 150.10
      0200-0300 205.12 2,626 187.61 2,111 182.55 2,005 237.98 180.67 150.02
      0300-0400 205.13 2,647 187.61 2,113 182.55 2,005 237.91 180.67 149.94
      0400-0500 205.14 2,680 187.61 2,118 182.55 2,015 237.86 180.67 149.86
      0500-0600 205.16 2,708 187.62 2,125 182.55 2,014 237.80 180.68 149.79
      0600-0700 205.18 2,742 187.62 2,126 182.55 2,005 237.69 180.67 149.71
      0700-0800 205.21 2,785 187.62 2,130 182.55 2,005 237.53 180.69 149.62
      0800-0900 205.24 2,833 187.62 2,134 182.55 2,005 237.38 180.68 149.54
      0900-1000 205.28 2,889 187.63 2,140 182.55 2,013 237.27 180.70 149.47
      1000-1100 205.31 2,951 187.63 2,150 182.56 2,024 237.18 180.72 149.40
      1100-1200 205.35 3,010 187.64 2,156 182.55 2,008 237.13 180.71 149.31
      1200-1300 205.39 3,065 187.64 2,165 182.55 2,002 237.03 180.70 149.23
      1300-1400 205.41 3,104 187.65 2,178 182.55 2,001 236.99 180.71 149.14
      1400-1500 205.43 3,135 187.67 2,198 182.55 2,003 236.98 180.75 149.07
      1500-1600 205.44 3,151 187.68 2,219 182.55 2,009 236.98 180.77 149.05
      1600-1700 205.44 3,160 187.70 2,250 182.56 2,026 236.97 180.76 149.03
      1700-1800 205.44 3,153 187.73 2,288 182.56 2,034 236.94 180.76 149.01
      1800-1900 205.43 3,140 187.76 2,329 182.57 2,050 236.95 180.74 149.00
      1900-2000 205.42 3,122 187.79 2,376 182.59 2,081 236.94 180.74 148.99
      2000-2100 205.41 3,098 187.82 2,423 182.61 2,122 236.92 180.73 148.97
      2100-2200 205.39 3,071 187.85 2,475 182.62 2,160 236.94 180.73 148.96
      2200-2300 205.37 3,045 187.88 2,520 182.64 2,200 236.92 180.72 148.95
      2300-2400 205.36 3,018 187.91 2,561 182.67 2,249 236.90 180.73 148.93
      Average 205.30 2,931 187.69 2,229 182.57 2,044 237.30 180.71 149.39

      💧 These sites are not operated and maintained by Reclamation 💧

      TIME
      (MST)
      BELOW LAGUNA YUMA GAGE NIB BROCK SIB 242 WELLFIELD
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      INFLOW
      (CFS)
      STORAGE
      (KAF)
      RELEASE
      (CFS)
      FLOW
      (CFS)
      FLOW
      (CFS)
      0000-0100 125.26 588 113.08 1,618 105.62 1,420 0 8.33 0 169 58
      0100-0200 125.19 573 113.05 1,603 105.61 1,415 0 8.33 0 173 58
      0200-0300 125.16 563 113.02 1,585 105.61 1,410 0 8.33 0 175 58
      0300-0400 125.12 554 112.98 1,568 105.60 1,400 0 8.33 0 164 58
      0400-0500 125.09 548 112.94 1,553 105.59 1,392 0 8.33 0 153 58
      0500-0600 125.07 544 112.90 1,530 105.58 1,379 0 8.33 0 149 58
      0600-0700 125.05 539 112.85 1,510 105.57 1,372 0 8.33 0 148 58
      0700-0800 125.04 535 112.80 1,490 105.56 1,364 0 8.33 0 148 58
      0800-0900 125.02 531 112.76 1,470 105.54 1,351 0 8.33 0 184 57
      0900-1000 125.00 528 112.73 1,450 105.52 1,331 0 8.33 0 186 58
      1000-1100 124.99 524 112.70 1,435 105.50 1,312 0 8.33 0 181 55
      1100-1200 124.97 521 112.67 1,425 105.49 1,297 0 8.33 0 151 53
      1200-1300 124.96 519 112.64 1,410 105.47 1,278 0 8.33 0 171 53
      1300-1400 124.96 517 112.60 1,395 105.46 1,267 0 8.33 0 197 53
      1400-1500 124.95 515 112.56 1,378 105.44 1,255 0 8.33 0 196 53
      1500-1600 124.94 513 112.53 1,360 105.42 1,240 0 8.33 0 191 55
      1600-1700 124.93 512 112.49 1,343 105.41 1,229 0 8.33 0 188 58
      1700-1800 124.93 510 112.48 1,335 105.39 1,213 0 8.33 0 184 58
      1800-1900 124.93 510 112.46 1,325 105.38 1,201 0 8.33 0 185 58
      1900-2000 124.92 507 112.44 1,320 105.38 1,196 0 8.33 0 190 58
      2000-2100 124.92 508 112.41 1,308 105.37 1,186 0 8.33 0 194 58
      2100-2200 124.92 508 112.39 1,295 105.36 1,176 0 8.33 0 193 58
      2200-2300 124.92 508 112.36 1,285 105.35 1,169 0 8.33 0 191 58
      2300-2400 124.92 508 112.34 1,278 105.34 1,163 0 8.32 0 188 58
      Average 125.01 528 112.67 1,428 105.48 1,292 00 8.33 00 177 57

  • Sunday, 11-30-2025


      TIME
      (MST)
      LAKE MEAD/HOOVER DAM LAKE MOHAVE/DAVIS DAM LAKE HAVASU/PARKER DAM
      ELEV
      (FT)
      STORAGE
      (KAF)
      RELEASE
      (CFS)
      ELEV
      (FT)
      STORAGE
      (KAF)
      RELEASE
      (CFS)
      ELEV
      (FT)
      STORAGE
      (KAF)
      RELEASE
      (CFS)
      0000-0100 1,058.71 8,325.58 1,174 640.44 1,687.51 2,360 449.27 555.90 1,960
      0100-0200 1,058.72 8,326.33 1,174 640.41 1,686.62 2,372 449.25 555.57 1,839
      0200-0300 1,058.73 8,327.09 1,331 640.40 1,686.51 2,360 449.25 555.44 1,863
      0300-0400 1,058.73 8,327.09 1,428 640.44 1,687.51 2,360 449.26 555.73 1,863
      0400-0500 1,058.74 8,327.84 1,549 640.40 1,686.51 2,360 449.25 555.57 1,839
      0500-0600 1,058.76 8,329.35 1,682 640.40 1,686.32 2,347 449.25 555.44 1,863
      0600-0700 1,058.75 8,328.59 1,343 640.39 1,686.12 2,360 449.25 555.44 1,863
      0700-0800 1,058.76 8,329.35 1,597 640.39 1,686.21 2,335 449.24 555.34 1,839
      0800-0900 1,058.78 8,330.85 1,307 640.34 1,684.68 2,360 449.24 555.34 1,863
      0900-1000 1,058.79 8,331.61 1,053 640.39 1,686.12 2,360 449.22 554.89 1,863
      1000-1100 1,058.78 8,330.85 1,150 640.34 1,684.87 2,360 449.21 554.79 1,839
      1100-1200 1,058.80 8,332.36 1,089 640.32 1,684.15 2,372 449.21 554.75 1,863
      1200-1300 1,058.82 8,333.87 1,113 640.35 1,685.15 2,347 449.21 554.75 1,863
      1300-1400 1,058.82 8,333.87 1,319 640.32 1,684.18 2,360 449.20 554.54 1,839
      1400-1500 1,058.82 8,333.87 1,125 640.30 1,683.74 2,360 449.18 554.07 1,888
      1500-1600 1,058.84 8,335.38 1,125 640.41 1,686.82 2,360 449.19 554.26 1,839
      1600-1700 1,058.84 8,335.38 1,258 640.31 1,683.85 2,347 449.18 554.13 4,550
      1700-1800 1,058.84 8,335.38 1,198 640.35 1,684.96 2,360 449.18 554.11 4,550
      1800-1900 1,058.85 8,336.13 1,125 640.42 1,687.07 2,360 449.16 553.72 4,646
      1900-2000 1,058.87 8,337.64 1,113 640.33 1,684.57 2,347 449.14 553.35 4,695
      2000-2100 1,058.87 8,337.64 1,512 640.38 1,685.90 2,372 449.15 553.48 4,646
      2100-2200 1,058.88 8,338.39 2,517 640.42 1,686.90 2,347 449.14 553.29 4,695
      2200-2300 1,058.91 8,340.65 1,549 640.35 1,685.10 2,347 449.11 552.84 4,646
      2300-2400 1,058.91 8,340.65 2,360 640.38 1,685.90 2,360 449.14 553.25 1,984
      Average 1,058.81 8,332.74 1,383 640.37 1,685.72 2,357 449.20 554.58 2,675
      TIME
      (MST)
      Below Big Bend Below Needles Bridge RS 41
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      0000-0100 479.22 2,630 451.51 4,066 450.11 2,615
      0100-0200 479.22 2,631 451.51 4,064 450.10 2,750
      0200-0300 479.23 2,634 451.51 4,063 450.09 2,794
      0300-0400 479.22 2,631 451.51 4,063 450.09 2,688
      0400-0500 479.22 2,630 451.50 4,060 450.09 2,597
      0500-0600 479.23 2,634 451.50 4,058 450.09 2,692
      0600-0700 479.23 2,640 451.50 4,057 450.09 2,707
      0700-0800 479.22 2,629 451.50 4,057 450.08 2,756
      0800-0900 479.22 2,628 451.50 4,080 450.08 2,741
      0900-1000 479.22 2,624 451.50 4,107 450.08 2,727
      1000-1100 479.22 2,632 451.50 4,130 450.08 2,757
      1100-1200 479.23 2,637 451.50 4,139 450.08 2,770
      1200-1300 479.23 2,639 451.50 4,137 450.08 2,844
      1300-1400 479.23 2,643 451.50 4,138 450.07 2,853
      1400-1500 479.24 2,651 451.50 4,136 450.06 2,800
      1500-1600 479.24 2,652 451.49 4,125 450.06 2,847
      1600-1700 479.25 2,655 451.49 4,112 450.06 2,822
      1700-1800 479.25 2,660 451.48 4,102 450.05 2,859
      1800-1900 479.25 2,662 451.48 4,093 450.03 2,897
      1900-2000 479.25 2,661 451.47 4,085 450.02 2,902
      2000-2100 479.25 2,657 451.47 4,081 449.99 2,837
      2100-2200 479.25 2,663 451.46 4,079 449.97 2,819
      2200-2300 479.23 2,643 451.46 4,079 449.95 2,809
      2300-2400 479.22 2,625 451.45 4,078 449.94 2,801
      Average 479.23 2,641 451.49 4,091 450.06 2,779
      TIME
      (MST)
      Parker Gage Water Wheel I-10 Bridge MCINTYRE PARK TAYLOR FERRY OXBOW BRIDGE
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      0000-0100 342.06 4,600 297.48 1,784 244.47 1,897 235.24 1,699 226.35 2,415 216.33 2,184
      0100-0200 341.97 4,359 297.48 1,780 244.49 1,915 235.25 1,704 226.34 2,409 216.33 2,182
      0200-0300 341.42 3,104 297.50 1,802 244.50 1,936 235.26 1,720 226.34 2,406 216.33 2,181
      0300-0400 340.87 2,098 297.63 1,948 244.51 1,940 235.27 1,729 226.34 2,410 216.33 2,181
      0400-0500 340.65 1,766 297.97 2,332 244.51 1,943 235.28 1,739 226.35 2,413 216.32 2,180
      0500-0600 340.76 1,926 298.39 2,852 244.52 1,955 235.29 1,748 226.35 2,417 216.32 2,179
      0600-0700 340.88 2,113 298.75 3,341 244.53 1,968 235.30 1,756 226.36 2,425 216.32 2,179
      0700-0800 340.83 2,044 298.98 3,668 244.53 1,964 235.31 1,764 226.37 2,433 216.32 2,178
      0800-0900 340.76 1,928 299.06 3,784 244.52 1,950 235.32 1,776 226.38 2,436 216.32 2,178
      0900-1000 340.73 1,881 299.00 3,701 244.50 1,931 235.32 1,783 226.38 2,441 216.32 2,179
      1000-1100 340.73 1,888 298.85 3,479 244.49 1,925 235.32 1,784 226.39 2,449 216.32 2,179
      1100-1200 340.77 1,946 298.64 3,187 244.50 1,934 235.31 1,775 226.41 2,461 216.32 2,180
      1200-1300 340.81 2,015 298.41 2,884 244.53 1,962 235.31 1,767 226.42 2,470 216.33 2,182
      1300-1400 340.78 1,959 298.21 2,624 244.58 2,027 235.31 1,764 226.42 2,470 216.33 2,185
      1400-1500 340.73 1,878 298.04 2,416 244.66 2,122 235.31 1,771 226.42 2,468 216.35 2,200
      1500-1600 340.74 1,896 297.91 2,260 244.77 2,258 235.33 1,791 226.42 2,471 216.36 2,213
      1600-1700 340.81 2,009 297.81 2,145 244.92 2,427 235.36 1,826 226.42 2,473 216.36 2,217
      1700-1800 340.92 2,177 297.73 2,055 245.07 2,591 235.42 1,890 226.42 2,469 216.37 2,218
      1800-1900 341.67 3,623 297.67 1,984 245.19 2,723 235.49 1,976 226.43 2,480 216.37 2,218
      1900-2000 342.04 4,537 297.62 1,936 245.28 2,819 235.60 2,099 226.47 2,506 216.37 2,218
      2000-2100 342.07 4,625 297.59 1,905 245.34 2,878 235.72 2,235 226.52 2,548 216.37 2,219
      2100-2200 342.09 4,670 297.57 1,883 245.35 2,898 235.83 2,369 226.60 2,612 216.37 2,224
      2200-2300 342.07 4,633 297.56 1,866 245.33 2,875 235.92 2,483 226.70 2,690 216.38 2,233
      2300-2400 342.10 4,702 297.55 1,856 245.29 2,825 236.00 2,575 226.82 2,785 216.40 2,254
      Average 341.22 2,849 298.06 2,478 244.77 2,236 235.42 1,897 226.43 2,481 216.34 2,197
      TIME
      (MST)
      CIBOLA PICACHO PARK MARTINEZ LAKE SENATOR
      WASH
      ABOVE
      IMPERIAL DAM
      ABOVE
      LAGUNA DAM
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      ELEV
      (FT)
      ELEV
      (FT)
      ELEV
      (FT)
      0000-0100 205.10 2,565 187.66 2,182 182.59 2,088 238.40 180.77 150.59
      0100-0200 205.10 2,560 187.65 2,179 182.59 2,088 238.41 180.77 150.59
      0200-0300 205.10 2,554 187.65 2,179 182.59 2,088 238.35 180.77 150.59
      0300-0400 205.10 2,551 187.65 2,175 182.59 2,091 238.33 180.77 150.59
      0400-0500 205.10 2,549 187.65 2,173 182.59 2,096 238.35 180.78 150.59
      0500-0600 205.10 2,550 187.65 2,168 182.60 2,099 238.31 180.77 150.59
      0600-0700 205.10 2,548 187.64 2,162 182.60 2,100 238.33 180.76 150.59
      0700-0800 205.10 2,548 187.64 2,159 182.59 2,097 238.31 180.73 150.59
      0800-0900 205.10 2,548 187.64 2,152 182.59 2,098 238.30 180.71 150.58
      0900-1000 205.10 2,552 187.63 2,145 182.59 2,096 238.26 180.70 150.56
      1000-1100 205.10 2,554 187.63 2,139 182.59 2,088 238.27 180.68 150.55
      1100-1200 205.10 2,550 187.63 2,137 182.59 2,088 238.26 180.69 150.53
      1200-1300 205.10 2,554 187.62 2,134 182.58 2,076 238.29 180.70 150.51
      1300-1400 205.10 2,552 187.62 2,127 182.58 2,067 238.28 180.71 150.50
      1400-1500 205.10 2,550 187.62 2,125 182.58 2,067 238.26 180.71 150.49
      1500-1600 205.10 2,553 187.61 2,118 182.58 2,067 238.23 180.70 150.48
      1600-1700 205.10 2,553 187.61 2,111 182.58 2,067 238.20 180.66 150.48
      1700-1800 205.10 2,551 187.60 2,106 182.58 2,065 238.20 180.65 150.47
      1800-1900 205.10 2,556 187.60 2,103 182.57 2,050 238.19 180.65 150.45
      1900-2000 205.10 2,564 187.60 2,103 182.57 2,046 238.16 180.65 150.43
      2000-2100 205.11 2,576 187.60 2,101 182.57 2,043 238.18 180.64 150.41
      2100-2200 205.11 2,583 187.60 2,099 182.56 2,026 238.16 180.65 150.40
      2200-2300 205.11 2,591 187.60 2,099 182.56 2,026 238.15 180.66 150.35
      2300-2400 205.11 2,595 187.60 2,102 182.56 2,026 238.11 180.68 150.26
      Average 205.10 2,559 187.62 2,137 182.58 2,073 238.26 180.71 150.50

      💧 These sites are not operated and maintained by Reclamation 💧

      TIME
      (MST)
      BELOW LAGUNA YUMA GAGE NIB BROCK SIB 242 WELLFIELD
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      INFLOW
      (CFS)
      STORAGE
      (KAF)
      RELEASE
      (CFS)
      FLOW
      (CFS)
      FLOW
      (CFS)
      0000-0100 126.08 782 112.51 1,350 105.35 1,173 0 8.34 0 194 58
      0100-0200 126.12 793 112.55 1,370 105.36 1,184 0 8.34 0 192 58
      0200-0300 126.16 802 112.60 1,385 105.39 1,205 0 8.34 0 191 58
      0300-0400 126.19 809 112.63 1,405 105.40 1,218 0 8.34 0 190 58
      0400-0500 126.21 815 112.67 1,425 105.41 1,233 0 8.34 0 187 58
      0500-0600 126.23 820 112.71 1,435 105.43 1,245 0 8.34 0 183 58
      0600-0700 126.25 824 112.75 1,455 105.45 1,258 0 8.34 0 173 58
      0700-0800 126.26 826 112.79 1,475 105.46 1,274 0 8.34 0 171 58
      0800-0900 126.27 829 112.82 1,495 105.48 1,287 0 8.34 0 165 58
      0900-1000 126.26 827 112.86 1,505 105.50 1,307 0 8.34 0 174 58
      1000-1100 126.23 818 112.89 1,523 105.52 1,330 0 8.34 0 167 58
      1100-1200 126.14 799 112.92 1,540 105.53 1,343 0 8.33 0 188 58
      1200-1300 126.03 776 112.96 1,560 105.54 1,354 0 8.33 0 163 58
      1300-1400 125.93 749 113.00 1,575 105.56 1,362 0 8.34 0 168 58
      1400-1500 125.84 725 113.04 1,593 105.57 1,374 0 8.34 0 193 58
      1500-1600 125.75 705 113.07 1,610 105.58 1,383 0 8.34 0 179 58
      1600-1700 125.69 688 113.10 1,623 105.59 1,392 0 8.33 0 171 58
      1700-1800 125.63 676 113.11 1,630 105.60 1,400 0 8.33 0 189 58
      1800-1900 125.59 663 113.13 1,640 105.61 1,407 0 8.33 0 177 58
      1900-2000 125.53 651 113.13 1,640 105.61 1,412 0 8.33 0 187 58
      2000-2100 125.47 636 113.14 1,640 105.62 1,420 0 8.34 0 175 58
      2100-2200 125.42 623 113.14 1,640 105.62 1,421 0 8.34 0 167 58
      2200-2300 125.37 613 113.13 1,640 105.62 1,420 0 8.33 0 175 58
      2300-2400 125.32 601 113.11 1,630 105.62 1,420 0 8.33 0 162 58
      Average 125.91 744 112.91 1,533 105.52 1,326 00 8.34 00 178 58

  • Saturday, 11-29-2025


      TIME
      (MST)
      LAKE MEAD/HOOVER DAM LAKE MOHAVE/DAVIS DAM LAKE HAVASU/PARKER DAM
      ELEV
      (FT)
      STORAGE
      (KAF)
      RELEASE
      (CFS)
      ELEV
      (FT)
      STORAGE
      (KAF)
      RELEASE
      (CFS)
      ELEV
      (FT)
      STORAGE
      (KAF)
      RELEASE
      (CFS)
      0000-0100 1,058.52 8,311.26 1,597 640.55 1,690.59 2,299 449.42 558.72 1,863
      0100-0200 1,058.52 8,311.26 1,452 640.60 1,691.87 2,311 449.41 558.57 1,839
      0200-0300 1,058.52 8,311.26 1,343 640.49 1,689.01 2,299 449.40 558.47 1,839
      0300-0400 1,058.54 8,312.76 1,367 640.53 1,690.15 2,323 449.42 558.72 1,863
      0400-0500 1,058.54 8,312.76 1,270 640.53 1,690.15 2,299 449.42 558.80 1,863
      0500-0600 1,058.55 8,313.52 1,077 640.53 1,690.09 2,311 449.40 558.41 1,839
      0600-0700 1,058.55 8,313.52 1,174 640.56 1,690.76 2,323 449.40 558.41 1,839
      0700-0800 1,058.56 8,314.27 1,452 640.53 1,690.04 2,311 449.39 558.25 1,863
      0800-0900 1,058.56 8,314.27 1,404 640.51 1,689.40 2,323 449.39 558.31 1,839
      0900-1000 1,058.59 8,316.53 1,525 640.55 1,690.70 2,311 449.39 558.23 1,863
      1000-1100 1,058.60 8,317.29 1,573 640.54 1,690.23 2,311 449.38 558.08 1,839
      1100-1200 1,058.59 8,316.53 1,742 640.53 1,690.09 2,299 449.38 558.02 1,839
      1200-1300 1,058.61 8,318.04 1,174 640.53 1,690.12 2,323 449.38 558.02 1,863
      1300-1400 1,058.62 8,318.79 1,101 640.53 1,690.09 2,335 449.37 557.80 1,863
      1400-1500 1,058.60 8,317.29 1,041 640.49 1,689.01 2,335 449.35 557.53 1,839
      1500-1600 1,058.62 8,318.79 1,065 640.52 1,689.79 2,323 449.36 557.68 1,863
      1600-1700 1,058.64 8,320.30 1,307 640.45 1,687.87 2,347 449.35 557.43 1,863
      1700-1800 1,058.65 8,321.06 1,028 640.48 1,688.73 2,323 449.35 557.37 1,851
      1800-1900 1,058.65 8,321.06 1,028 640.51 1,689.48 2,347 449.32 556.86 4,525
      1900-2000 1,058.67 8,322.56 1,125 640.47 1,688.37 2,335 449.32 556.90 4,574
      2000-2100 1,058.67 8,322.56 1,065 640.44 1,687.62 2,360 449.30 556.55 4,525
      2100-2200 1,058.68 8,323.32 1,053 640.46 1,688.09 2,347 449.28 556.12 4,525
      2200-2300 1,058.70 8,324.82 1,041 640.46 1,688.09 2,372 449.28 556.04 4,550
      2300-2400 1,058.71 8,325.58 2,045 640.42 1,686.98 2,347 449.26 555.73 4,574
      Average 1,058.60 8,317.47 1,294 640.51 1,689.47 2,326 449.36 557.71 2,525
      TIME
      (MST)
      Below Big Bend Below Needles Bridge RS 41
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      0000-0100 479.22 2,623 451.61 4,074 450.24 2,705
      0100-0200 479.22 2,625 451.61 4,072 450.23 2,708
      0200-0300 479.22 2,623 451.61 4,071 450.23 2,733
      0300-0400 479.21 2,617 451.61 4,070 450.22 2,718
      0400-0500 479.20 2,608 451.61 4,067 450.20 2,693
      0500-0600 479.19 2,598 451.61 4,067 450.20 2,749
      0600-0700 479.19 2,593 451.61 4,066 450.19 2,728
      0700-0800 479.19 2,590 451.61 4,065 450.19 2,686
      0800-0900 479.19 2,589 451.61 4,090 450.19 2,707
      0900-1000 479.19 2,591 451.61 4,119 450.19 2,630
      1000-1100 479.19 2,591 451.60 4,137 450.19 2,669
      1100-1200 479.19 2,593 451.60 4,145 450.18 2,835
      1200-1300 479.18 2,584 451.56 4,154 450.17 2,922
      1300-1400 479.20 2,604 451.55 4,148 450.15 2,955
      1400-1500 479.21 2,618 451.55 4,133 450.15 2,888
      1500-1600 479.18 2,578 451.55 4,119 450.14 2,868
      1600-1700 479.22 2,626 451.52 4,110 450.16 2,804
      1700-1800 479.18 2,587 451.51 4,101 450.15 2,757
      1800-1900 479.18 2,585 451.51 4,088 450.15 2,683
      1900-2000 479.18 2,584 451.51 4,082 450.16 2,642
      2000-2100 479.16 2,565 451.51 4,077 450.16 2,684
      2100-2200 479.21 2,618 451.51 4,070 450.12 2,733
      2200-2300 479.22 2,627 451.51 4,068 450.11 2,736
      2300-2400 479.23 2,634 451.51 4,068 450.11 2,696
      Average 479.20 2,602 451.57 4,094 450.17 2,747
      TIME
      (MST)
      Parker Gage Water Wheel I-10 Bridge MCINTYRE PARK TAYLOR FERRY OXBOW BRIDGE
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      0000-0100 340.82 2,028 297.47 1,775 244.59 2,042 235.33 1,792 226.44 2,484 216.39 2,245
      0100-0200 340.80 1,993 297.47 1,773 244.61 2,069 235.33 1,793 226.43 2,478 216.40 2,246
      0200-0300 340.76 1,935 297.47 1,771 244.56 2,005 235.35 1,810 226.43 2,476 216.40 2,246
      0300-0400 340.75 1,914 297.47 1,772 244.48 1,909 235.37 1,832 226.43 2,475 216.39 2,245
      0400-0500 340.76 1,932 297.48 1,778 244.44 1,854 235.37 1,835 226.44 2,482 216.39 2,243
      0500-0600 340.83 2,037 297.48 1,782 244.42 1,837 235.35 1,811 226.44 2,486 216.39 2,241
      0600-0700 340.86 2,092 297.48 1,783 244.41 1,825 235.31 1,773 226.45 2,494 216.39 2,240
      0700-0800 340.85 2,073 297.48 1,779 244.42 1,832 235.28 1,738 226.45 2,492 216.39 2,239
      0800-0900 340.76 1,937 297.48 1,780 244.44 1,859 235.26 1,720 226.44 2,482 216.39 2,239
      0900-1000 340.76 1,931 297.48 1,783 244.45 1,870 235.25 1,705 226.41 2,466 216.39 2,240
      1000-1100 340.83 2,043 297.48 1,786 244.44 1,862 235.25 1,701 226.40 2,454 216.39 2,241
      1100-1200 340.87 2,104 297.48 1,787 244.44 1,854 235.25 1,706 226.37 2,434 216.39 2,241
      1200-1300 340.79 1,972 297.49 1,791 244.44 1,856 235.26 1,711 226.35 2,419 216.39 2,239
      1300-1400 340.70 1,844 297.50 1,798 244.45 1,869 235.26 1,711 226.34 2,410 216.38 2,231
      1400-1500 340.71 1,851 297.51 1,814 244.46 1,877 235.26 1,710 226.34 2,409 216.37 2,219
      1500-1600 340.79 1,979 297.52 1,824 244.45 1,874 235.26 1,712 226.35 2,414 216.36 2,209
      1600-1700 340.79 1,976 297.53 1,834 244.45 1,869 235.26 1,715 226.34 2,411 216.35 2,206
      1700-1800 340.78 1,955 297.53 1,834 244.45 1,865 235.26 1,715 226.34 2,408 216.35 2,203
      1800-1900 340.78 1,959 297.53 1,835 244.44 1,861 235.26 1,715 226.34 2,407 216.35 2,200
      1900-2000 340.85 2,078 297.53 1,838 244.44 1,857 235.26 1,717 226.34 2,411 216.34 2,197
      2000-2100 341.65 3,570 297.53 1,837 244.43 1,849 235.26 1,713 226.35 2,418 216.34 2,193
      2100-2200 342.04 4,542 297.52 1,828 244.43 1,843 235.26 1,710 226.35 2,418 216.33 2,190
      2200-2300 342.03 4,527 297.51 1,813 244.44 1,858 235.25 1,709 226.35 2,418 216.33 2,187
      2300-2400 342.01 4,474 297.49 1,796 244.46 1,882 235.25 1,701 226.36 2,422 216.33 2,185
      Average 340.98 2,364 297.50 1,800 244.46 1,883 235.28 1,740 226.39 2,444 216.37 2,224
      TIME
      (MST)
      CIBOLA PICACHO PARK MARTINEZ LAKE SENATOR
      WASH
      ABOVE
      IMPERIAL DAM
      ABOVE
      LAGUNA DAM
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      ELEV
      (FT)
      ELEV
      (FT)
      ELEV
      (FT)
      0000-0100 205.11 2,580 187.58 2,078 182.56 2,026 238.80 180.80 149.46
      0100-0200 205.12 2,601 187.59 2,079 182.56 2,026 238.77 180.81 149.46
      0200-0300 205.12 2,619 187.59 2,080 182.56 2,026 238.75 180.82 149.47
      0300-0400 205.13 2,637 187.59 2,081 182.56 2,026 238.74 180.83 149.47
      0400-0500 205.13 2,651 187.59 2,084 182.56 2,026 238.70 180.81 149.58
      0500-0600 205.14 2,660 187.59 2,090 182.56 2,026 238.70 180.78 149.73
      0600-0700 205.14 2,671 187.60 2,096 182.56 2,026 238.69 180.73 149.86
      0700-0800 205.14 2,678 187.60 2,101 182.56 2,026 238.69 180.70 149.99
      0800-0900 205.14 2,685 187.61 2,109 182.56 2,026 238.65 180.68 150.11
      0900-1000 205.15 2,689 187.61 2,118 182.56 2,026 238.69 180.68 150.22
      1000-1100 205.15 2,691 187.62 2,131 182.56 2,026 238.58 180.66 150.31
      1100-1200 205.15 2,693 187.62 2,133 182.56 2,026 238.65 180.66 150.40
      1200-1300 205.15 2,692 187.64 2,152 182.57 2,037 238.57 180.67 150.47
      1300-1400 205.15 2,691 187.64 2,154 182.57 2,045 238.55 180.69 150.52
      1400-1500 205.15 2,689 187.64 2,161 182.57 2,043 238.57 180.68 150.55
      1500-1600 205.14 2,678 187.64 2,164 182.57 2,046 238.56 180.70 150.56
      1600-1700 205.14 2,671 187.65 2,167 182.57 2,046 238.52 180.70 150.56
      1700-1800 205.13 2,653 187.65 2,170 182.58 2,059 238.50 180.72 150.56
      1800-1900 205.13 2,640 187.65 2,173 182.58 2,067 238.52 180.74 150.56
      1900-2000 205.13 2,628 187.65 2,176 182.58 2,067 238.48 180.75 150.56
      2000-2100 205.12 2,612 187.65 2,178 182.58 2,067 238.48 180.77 150.56
      2100-2200 205.12 2,600 187.65 2,179 182.58 2,067 238.46 180.78 150.57
      2200-2300 205.11 2,589 187.65 2,180 182.58 2,067 238.45 180.77 150.58
      2300-2400 205.11 2,577 187.65 2,180 182.59 2,086 238.40 180.77 150.58
      Average 205.13 2,649 187.62 2,134 182.57 2,042 238.60 180.74 150.20

      💧 These sites are not operated and maintained by Reclamation 💧

      TIME
      (MST)
      BELOW LAGUNA YUMA GAGE NIB BROCK SIB 242 WELLFIELD
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      STAGE
      (FT)
      FLOW
      (CFS)
      INFLOW
      (CFS)
      STORAGE
      (KAF)
      RELEASE
      (CFS)
      FLOW
      (CFS)
      FLOW
      (CFS)
      0000-0100 125.00 527 112.56 1,375 105.43 1,245 0 8.34 0 205 58
      0100-0200 125.00 526 112.53 1,363 105.42 1,234 0 8.34 0 199 58
      0200-0300 124.99 525 112.50 1,348 105.41 1,225 0 8.34 0 190 58
      0300-0400 124.99 525 112.48 1,338 105.40 1,215 0 8.34 0 167 58
      0400-0500 124.99 526 112.46 1,328 105.38 1,205 0 8.34 0 159 58
      0500-0600 125.00 526 112.44 1,320 105.38 1,195 0 8.34 0 157 58
      0600-0700 125.00 527 112.43 1,313 105.36 1,184 0 8.34 0 157 58
      0700-0800 125.01 530 112.41 1,308 105.36 1,175 0 8.34 0 162 58
      0800-0900 125.02 531 112.40 1,300 105.35 1,169 0 8.34 0 157 58
      0900-1000 125.03 535 112.39 1,300 105.34 1,163 0 8.34 0 160 58
      1000-1100 125.05 538 112.39 1,300 105.34 1,163 0 8.34 0 161 58
      1100-1200 125.08 544 112.40 1,300 105.34 1,163 0 8.34 0 165 58
      1200-1300 125.13 556 112.40 1,300 105.34 1,163 0 8.34 0 177 58
      1300-1400 125.21 573 112.40 1,303 105.34 1,160 0 8.34 0 170 58
      1400-1500 125.36 605 112.40 1,300 105.33 1,155 0 8.34 0 182 58
      1500-1600 125.53 644 112.39 1,295 105.33 1,155 0 8.34 0 180 58
      1600-1700 125.67 680 112.38 1,290 105.33 1,154 0 8.34 0 191 58
      1700-1800 125.73 698 112.38 1,290 105.32 1,148 0 8.34 0 173 58
      1800-1900 125.71 693 112.38 1,290 105.32 1,148 0 8.34 0 186 58
      1900-2000 125.73 696 112.39 1,295 105.32 1,148 0 8.34 0 188 58
      2000-2100 125.81 715 112.40 1,300 105.32 1,148 0 8.34 0 191 58
      2100-2200 125.90 735 112.42 1,310 105.33 1,155 0 8.34 0 193 58
      2200-2300 125.97 751 112.44 1,320 105.34 1,160 0 8.34 0 193 58
      2300-2400 126.03 767 112.48 1,333 105.34 1,163 0 8.34 0 193 58
      Average 125.33 603 112.43 1,313 105.35 1,175 00 8.34 00 177 58


Note: Automatic reports have not been checked for errors.
(ft=feet above mean sea level, cfs=cubic feet per second, kaf=1000 acre-feet)