Miscellaneous Documents and Publications

On this page you will find those documents and publications that do not fit into any of the categories listed to the left. Those documents that are recurring are grouped together and listed chronologically, those that do not fall in to a grouped category are listed chronologically in the Miscellaneous section.

Technical Memorandums

Publication Date Title
08/2024 Technical Memorandum No. 86-68330-2024-10 – Event Relative Location and Updated Earthquake Catalog Paradox Valley Seismic network
08/2024 Technical Memorandum No. 86-68330-2024-8 – Analyses of the Fall 2020 Seismicity Swarm
07/2024 Technical Memorandum No. 86-68330-2024-7 – Development of a New Velocity Model for the Paradox Valley Area
06/2024 Technical Memorandum No. 86-68330-2023-2 – Geomechanical and Flow Modeling of the 2022 Injection Test and Future Injection Scenarios
03/2024 Technical Decision Memorandum – Establishment of Interim Operating Guidance for Glen Canyon Dam during Low Reservoir Levels at Lake Powell
02/2023 Technical Memorandum ENV-2023-012 – Middle Rio Grande Flood Frequency Study
07/2020 Technical Memorandum 86-68330-2020-07 – Analysis of the March 4th, 2019 MW 4.5 Earthquake and Its Aftershocks Paradox Valley Unit, Colorado
05/2018 Technical Memorandum 85-833000-2017-15 – Integrated Subsurface Geologic Model, Paradox Valley, Colorado
07/2017 Technical Memorandum 85-833000-2017-14 - Compilation of Well Data in the Vicinity of Paradox Valley, CO
07/2017 Technical Memorandum TM-85-833000-2017-10 – Trends of Induced Seismicity and Pressures Following the 2013 Change in Injection Operations at the Paradox Valley Unit, Colorado
12/2016 Technical Memorandum TM-85-833000-2016-16 – Identification of Deformation in Paradox Valley using InSAR

Miscellaneous Documents

Publication Date Title
08/2025 Agreement between the United States Bureau of Reclamation and Bridger Valley Water Conservancy District for the Transfer of Title to the Lyman Project 3.132-Acre Construction Camp in Uinta County, Wyoming
11/2024 Draft Repayment Contract Between the United States and the Ute Mountain Ute Tribe for the Animas La-Plata Project
07/2024 Upper Basin Environmental Drought Mitigation (B2E) Request For Applications (RFA)
10/2023 Flaming Gorge Dam Brochure - Mobile Version
06/2023 Designation of a Special Use Area on Bureau of Reclamation Land Pumping Plant Parcel East of Silt, Colo.
06/2023 Request for Input for the Upper Colorado River Basin System Conservation and Efficiency Program
11/2022 Grand Valley Diversion Dam – Electrical and Control Systems Upgrade Project Brochure
2021 Water and Power for our Future
09/2020 Draft Contract Between the United States and the Navajo Tribal Utility Authority for Payment of Operation, Maintenance, and Replacement Costs for the Use of Federal Project Facilities
2020 Rio Grande Channel Analysis: Highway 380 to Elephant Butte Delta (RM 87 to RM 45)

For more infomation about Miscellaneous Documents or Publications contact: ucbpao@usbr.gov

Last updated 8/5/25