Schedule of Proposed NEPA Actions

NOTE: This report contains the most accurate information available at time of publication.

Browse by Office:

 

Regional Office

<RO> <DKAO> <ECAO> <MTAO> <NKAO> <OTAO> <WYAO> <Regional Archive> <Back to Top>

Project Name Project Location NEPA Phase Dates of Phase Project Sponsor and/or Partners Public Contact
Crow MR&I Water System (EA) Crow Indian Reservation, Montana Final EA/FONSI Complete January 2017 Crow Tribe, Water Resources Department Joey e'Silva
(406) 247-7720
jesilva@usbr.gov

Project Activities: Complete

Additional Information: www.usbr.gov/gp/nepa/cmri/index.html

 

 

Dakotas Area Office

<RO> <DKAO> <ECAO> <MTAO> <NKAO> <OTAO> <WYAO> <Regional Archive> <Back to Top>

Project Name Project Location NEPA Phase Dates of Phase Project Sponsor and/or Partners Public Contact
Supplemental Environmental Assessment for Funding of Operation, Maintenance and Replacement of the Mni Wiconi Rural Water Project, South Dakota (EA) Lyman, Jones, Stanley, Haakon, Mellette, Jackon, Todd, Oglala-Lakota Counties, Pine Ridge Indian Reservation, Rosebud Indian Reservation, Lower Bruel Indian Reservation, South Dakota Drafting EA December 2018   Kate Kenniger
701-221-1282
kkenninger@usbr.gov
Additional Information: Reclamation is completing an environmental review for funding of the OM&R of the OSRWSS (Core Pipeline System and On-Reservation Distribution System), LBSRWS, and RSRWS segments of the Mni Wiconi Rural Water System.
 
Environmental Assessment for the Issuance of Water Service and Power Contracts to Garrison Diversion Conservancy District for the Central North Dakota Water Supply Project, Burleigh and Sheridan Counties, North Dakota (EA) Burleigh, Sheridan Counties, North Dakota Release of Draft EA August 2017 Garrison Diversion Conservancy District Kate Kenniger
701-221-1282
kkenninger@usbr.gov
Additional Information: Reclamation is evaluating the environmental impacts associated with the issuance of a water service contract and power contract and to allow Garrison Diversion Conservancy District to construct an intake, wet well, pump station, 28-inch pipeline, and electrical facilities on the McClusky Canal right-of-way to withdraw up to 20 cfs of water from the McClusky Canal to serve areas of Stutsman Rural Water District/Jamestown, Central Plains Water District, Tuttle, and potentially other communities within the Missouri River Basin.
 
Environmental Assessment for the Funding and Construction to Repair the Slide at McClusky Canal, McLean County, North Dakota (EA) McLean County, North Dakota Final EA/FONSI Complete May 2017 Garrison Diversion Conservancy District Kate Kenniger
701-221-1282
kkenninger@usbr.gov
Additional Information: Reclamation is preparing an Environmental Assessment for the funding and construction of slide repairs on the McClusky Canal, McLean County, North Dakota.
 
Environmental Assessment for the Funding of the Cass Rural Water District Leonard Area Project, Cass, Ransom, and Richland Counties, North Dakota (EA) Cass, Ransom, and Richland Counties, North Dakota Release of Draft EA Sept 2017 Garrison Diversion Conservancy District Kate Kenniger
701-221-1282
kkenninger@usbr.gov
Additional Information: Reclamation is preparing an Environmental Assessment for the funding of approximately 25 miles of new water pipeline in Cass, Ranson, and Richland Counties, North Dakota.
 
Environmental Assessment for the Funding and Construction of the Heart Butte Conduit Repair, Grant County, North Dakota Grant County, North Dakota Scoping Est. Oct 2017   Kelly McPhillips
(701) 221-1287
kmcphillips@usbr.gov
Additional Information: Reclamation is evaluating the environmental impacts associated with proposed repairs to Heart Butte Dam.
 
Northwest Area Water Supply Project (EIS) Northwest North Dakota ROD issued 2015; U.S. District Court, Washington, DC issued an order finding the NEPA was sufficient in August 2017. October 9, 2017 the Province of Manitoba Canada and the State of Missouri filed Notices of Appeal. Schedule for the appeal process is uncertain at this time. Project sponsor is moving ahead with design/construction activities of various project features.   State of North Dakota is the project sponsor. State of North Dakota is an Intervenor Defendant. Alicia Waters
(701) 221-1206
awaters@usbr.gov
Additional Information: Reclamation is working with the DOI Solicitor's Office and the Department of Justice in the appeal process.
 

 

Eastern Colorado Area Office

<RO> <DKAO> <ECAO> <MTAO> <NKAO> <OTAO> <WYAO> <Regional Archive> <Back to Top>

Project Name Project Location NEPA Phase Dates of Phase Project Sponsor and/or Partners Public Contact
Arkansas Valley Conduit Long-Term Excess Capacity Master Contract (EIS) Lower Arkansas Valley Complete: Record of Decision issued February 27, 2014 Lower Arkansas Water Entities Signe Snortland
(970) 962-4338
jsnortland@usbr.gov

Project Activities: Ongoing please visit the AVCEIS Web site.

Additional Information: www.usbr.gov/avceis/

 
Black Hills Corporation Pueblo Reservoir Substation (EA) Pueblo Reservoir, Pueblo, Colorado EA and FONSI Complete April 2014 Black Hills Corporation Signe Snortland
(970) 962-4338
jsnortland@usbr.gov

Project Activities: Complete

Additional Information: Black Hills Corporation Pueblo Reservoir Substation

 
Colorado Springs - Southern Delivery System (EIS) Pueblo-Colorado Springs, Colorado Complete: Record of Decision issued March 2009 Colorado Springs Utilities, City of Fountain, Security Water District, and City of Pueblo West Signe Snortland
(970) 962-4338
jsnortland@usbr.gov

Project Activities: Complete

Additional Information: Southern Delivery System

 
Estes Park Transit Facility Parking Structure Above Lake Estes, Estes Park, Colorado Draft EA January 2016 Town of Estes Park Terence Stroh
970-962-4369
tstroh@usbr.gov

Project Activities: Draft EA distributed for public comment.

Additional Information: Estes Park Transit Facility Parking Structure

 
Granby Hydropower Project Grand County, Colorado EA and FONSI completed March 13, 2015 Northern Colorado Water Conservancy District Signe Snortland
(970) 962-4338
jsnortland@usbr.gov

Project Activities: Final EA & FONSI are now available.

Additional Information: Granby Hydropower Project

 
Grand Lake Clarity Grand Lake, Colorado Pre-Scoping 2017 Northern Colorado Water Conservancy District, Colorado River Water Conservation District, Grand County, Northwest Colorado Council of Governments Terence Stroh
(970) 962-4369
tstroh@usbr.gov

Project Activities: Planning/Pre-Scoping.

Additional Information: Grand Lake Clarity

 
Horsetooth Reservoir Admin and Maintenance Facilities Larimer County, Colorado EA and FONSI completed October 2015 Larimer County Parks Terence Stroh
970-962-4369
tstroh@usbr.gov
or
Mark Caughlan
Larimer County Parks
970-498-5600
mcaughlan@larimer.org

Project Activities: Final EA & FONSI are now available.

Additional Information: Horsetooth Reservoir Admin and Maintenance Facilities

 
Pueblo Hydropower Project (EA) Pueblo Dam, Pueblo, Colorado Draft EA January 2016 Southeastern Colorado Water Conservation District, Colorado Springs Utilities, and Board of Water Work of Pueblo Terence Stroh
970-962-4369
tstroh@usbr.gov

Project Activities: Draft EA distributed for public comment.

Additional Information: Pueblo Hydropower Project

 
Pueblo Resource Management Plan (EA) Pueblo Reservoir and Lake Pueblo State Park, Pueblo, Colorado Drafting EA 2014 Colorado Parks & Wildlife Signe Snortland
(970) 962-4338
jsnortland@usbr.gov

Project Activities: Drafting EA

Additional Information: Pueblo Resource Management Plan

 
Ruedi Repayment Contracts for 19585 Acre-Feet Colorado West Slope Counties Final EA and FONSI complete. July 2013 Colorado West Slope Counties Signe Snortland
(970) 962-4338
jsnortland@usbr.gov

Project Activities: Final EA & FONSI are now available.

Additional Information: Ruedi Repayment Contracts for 19585 Acre-Feet

 
Water Users Commitment to Provide 10,825 AF to the 15 Mile Reach CO R. Basin Complete: Final EA/FONSI March 2012 Upper Colorado River Basin Signe Snortland
(970) 962-4338
jsnortland@usbr.gov

Project Activities: Final EA and FONSI are now available.

Additional Information: Water Users Commitment to Provide 10825 AF

 
Windy Gap Firming Project (EIS) Colorado and South Platte River Basins, Colorado Final EIS

Supplemental Information Report and related errata.
Fall 2011

November 2012
Municipal Subdistrict of the Northern Colorado Water Conservancy District
Cooperating agencies: Corps of Engineers, Western Area Power Administration, Grand County
Signe Snortland
(970) 962-4338
jsnortland@usbr.gov

Project Activities: Supplemental Information Report and related errata now available.

Additional Information: Windy Gap Firming Project EIS

 

 

Montana Area Office

<RO> <DKAO> <ECAO> <MTAO> <NKAO> <OTAO> <WYAO> <Regional Archive> <Back to Top>

Project Name Project Location NEPA Phase Dates of Phase Project Sponsor and/or Partners Public Contact
St. Mary ESA Modifications (EA) Babb, Montana On Hold Ongoing USFWS, NPS, Blackfeet Tribe, MRJBOC Justin Kucera
(406) 247-7330
jkucera@usbr.gov

Additional Information: This project currently has two action alternatives to be analyzed, along with the no action alternative. Management has placed the NEPA/ESA components of this project on hold until reimbursable funding issues can be worked out. Alternative A - Dam with fish ladder has been designed to 60% and physically modeled. Alternative B - River wide rock ramp with low flow notch and complex channel is in a conceptual phase, designs and modeling are expected to continue.

 
Avalanche Irrigation District (EA) Helena, Montana On Hold Ongoing Proposed Avalanche ID, Whitewater Consulting Justin Kucera
(406) 247-7330
jkucera@usbr.gov

Additional Information: During 2016, the Avalanche Irrigation District requested a long term water service contract from Reclamation to provide irrigation water from Canyon Ferry Reservoir. The project proponents completed test wells attempting to show a connection between groundwater and surface water. Testing showed impacts. Public input resulted in the proponents taking a step back to consider additional alternatives. AID has hired a consultant to complete the EA process.

 
Crow Hydro (EA) Fort Smith, Montana Cooperating Agency Invites/MOUs Ongoing Crow Tribe, Montana FWP, NPS, DNRC Justin Kucera
(406) 247-7330
jkucera@usbr.gov
Additional Information: The Montana Area Office proposes working cooperatively with the Crow Tribe to implement Public Law 111-291, signed December 8, 2010. Title IV of the Act, the Crow Tribe Water Rights Settlement Act of 2010, gave the Crow Tribe the exclusive right to develop and market power generation at the Yellowtail Afterbay Dam (Afterbay).
 
Canyon Ferry Sewer District Land Transfer (EA) Helena, Montana Transfer to GSA Ongoing Sewer Districts, Lewis and Clark County Sanitarian Justin Kucera
(406) 247-7330
jkucera@usbr.gov

Additional Information: The Montana Area Office drafted an EA, hosted public scoping meetings and completed a Final EA/FONSI for the proposed land transfer. The Final EA and unsigned FONSI have been sent to GSA for final processing. GSA will be the federal agency for this action and this should be considered completed from a NEPA standpoint.

 
Fresno Safety of Dams (EA) Havre, Montana Early Internal Scoping December 2018 MRJBOC, Montana FWP Justin Kucera
(406) 247-7330
jkucera@usbr.gov

Additional Information: Fresno Dam requires safety of dams modifications beginning in 2018/2019.

 

 

Nebraska-Kansas Area Office

<RO> <DKAO> <ECAO> <MTAO> <NKAO> <OTAO> <WYAO> <Regional Archive> <Back to Top>

Project Name Project Location NEPA Phase Dates of Phase Project Sponsor and/or Partners Public Contact
Medicine Creek Reservoir Resource Management Plan/NEPA Documentation Frontier County, Nebraska Initializing Project November 2017 Nebraska Game and Parks Commission Nik Johanson
(308) 345-1032
njohanson@usbr.gov
and
Jeanette Timm
(308) 345-1028
jtimm@usbr.gov

Additional Information: Bureau of Reclamation has initialized a contract to update the Resource Management Plan for Medicine Creek Reservoir. NEPA analysis will accompany the plan.

 
Bonny Reservoir Resource Management Plan/NEPA Documentation Yuma County, Colorado Initializing Project November 2017 Colorado Parks and Wildlife Nik Johanson
(308) 345-1032
njohanson@usbr.gov
and
Jeanette Timm
(308) 345-1028
jtimm@usbr.gov

Additional Information: Bureau of Reclamation has initialized a contract to update the Resource Management Plan for Bonny Reservoir. NEPA analysis will accompany the plan.

 

 

Oklahoma-Texas Area Office

<RO> <DKAO> <ECAO> <MTAO> <NKAO> <OTAO> <WYAO> <Regional Archive> <Back to Top>

Project Name Project Location NEPA Phase Dates of Phase Project Sponsor and/or Partners Public Contact
Altus Safety of Dams (EA) W.C. Altus Project, Oklahoma Final EA/FONSI February 2016 Bureau of Reclamation Precious Braggs
(405) 470-4825
pbraggs@usbr.gov

Additional Information: Reclamation is proposing repairs to several dikes at Altus Dam and Reservoir in order to reduce the probability of failure, reduce uncontrolled releases from Altus Reservoir, and reduce public safety risks. For more information, visit: www.usbr.gov/gp/otao/altus/index.html

 

 

Wyoming Area Office

<RO> <DKAO> <ECAO> <MTAO> <NKAO> <OTAO> <WYAO> <Regional Archive> <Back to Top>

Project Name Project Location NEPA Phase Dates of Phase Project Sponsor and/or Partners Public Contact
Boysen Reservoir Resource Management Plan (EA) Fremont County, Wyoming Final Agency Review December 2017 Wyoming State Parks Brad Cannon
(307) 261-5635
bcannon@usbr.gov
and
Laura Schwieger
(307) 261-5664
lschwieger@usbr.gov
Additional Information: Wyoming State Parks, Reclamation's managing partner for Boysen Reservoir, has contracted for the preparation of a Recreation Master Plan / Resource Management Plan and Environmental Assessment. Document is undergoing final agency review and FONSI preparation.

 

 

Regional Archive (NEPA Complete)

<RO> <DKAO> <ECAO> <MTAO> <NKAO> <OTAO> <WYAO> <Regional Archive> <Back to Top>

Project Name Project Location NEPA Phase Dates of Phase Project Sponsor and/or Partners Public Contact
Box Butte Dam: Safety of Dams Corrective Actions Box Butte Dam, Dawes County, Nebraska Draft EA January 15-February 12 Bureau of Reclamation and Mirage Flats Irrigation District Christina Gomer
(406) 247-7753
cmgomer@usbr.gov
or
Lucas Milheiser
(308) 345-8323
lmilheiser@usbr.gov

Additional Information: Reclamation is seeking public review and comment on the Draft EA. The proposed action includes repair of toe drain, filter system, and spillway. Construction is proposed to begin in 2017.

 
Bull Lake Dam Safety of Dams Corrective Action (EA) Wind River Indian Reservation, Wyoming Final EA/FONSI May 2014 Reclamation's Safety of Dams Office; Midvale Irrigation District Lyle Myler
(307) 261-5676
lmyler@usbr.gov
and
Laura Schwieger
(307) 261-5664
lschwieger@usbr.gov

Additional Information: Bull Lake Dam has been inspected for safety conditions and needs repair work to the spillway structure. The project would modify the spillway portion of the dam so that the dam could be safely operated under full reservoir conditions.

 
Central MT Rural Water (EA) Canyon Ferry, Montana Final EA/FONSI May 2014 Bureau of Reclamation Justin Kucera
(406) 247-7330
jkucera@usbr.gov

Additional Information: EA Completed. Signed a non-decisional FONSI while the project works through the authorization process.

 
Construction of the New South West Pipeline Water Treatment Plant (EA) Dickinson, ND Final EA/FONSI March 2015 Garrison Diversion Conservancy District; North Dakota State Water Commission Kelly McPhillips
(701) 221-1287
kmcphillips@usbr.gov

Additional Information: A new water treatment plant in Dickinson is being proposed for The South West Pipeline Project. The plant would supply potable water with the potential to serve the South West Pipeline Project area.

Additional Information: Construction of the New South West Pipeline Water Treatment Plant

 
Contract Renewal for Jacobsen and Hamilton (EA) Washakie County, Wyoming Final EA/FONSI November 2014 Independent Water Users Brock Merrill
(307) 261-5649
bemerrill@usbr.gov
and
Laura Schwieger
(307) 261-5664
lschwieger@usbr.gov
Additional Information: This action is for renewal of an existing long-term water service contract. Read the Final EA/FONSI.
 
Contract Renewal for Robbins (EA) Hot Springs County, Wyoming Final EA/FONSI November 2014 Independent Water Users Brock Merrill
(307) 261-5649
bemerrill@usbr.gov
and
Laura Schwieger
(307) 261-5664
lschwieger@usbr.gov
Additional Information: This action is for renewal of an existing long-term water service contract. Read the Final EA/FONSI.
 
Crossing Right of Way Through Fish and Wildlife Service Refuge Lands to Connect the Spirit Lake Rural Water Distribution Line to the School Tank (EA) Benson County, ND FONSI/ Decision Notice October 2014 Devils Lake Wetland Management District; Fish and Wildlife Service; Spirit Lake Rural Water System Kelly McPhillips
(701) 221-1287
kmcphillips@usbr.gov
Additional Information: A water distribution line from the Spirit Lake Rural Water System to serve a local water use near Devils Lake is being evaluated. Reclamation is no longer involved in the project. The U.S. Fish and Wildlife Service has the lead.
 
Crow Irrigation Project Rehabilitation and Improvement (EA) Crow Indian Reservation, Montana Final EA/FONSI June 2015 Crow Tribe Water Resources Department; Bureau of Indian Affairs Christina Gomer
(406) 247-7753
cmgomer@usbr.gov

Additional Information: Public Law 111-291 authorized funding to repair and rehabilitate the Crow Irrigation Project. The Crow Tribe has contracted with Bartlett & West to prepare the Programmatic Environmental Assessment (EA) and the Master Engineering Plan. The Final EA and Finding of No Significant Impact/Decision Document are now available online. For more information visit: www.usbr.gov/gp/nepa/cip/index.html

 
Crow MR&I Water System - Pilot Water Treatment Plant (EA) Crow Indian Reservation, Montana Final EA/FONSI July 2015 Crow Tribe, Water Resources Department Christina Gomer
(406) 247-7753
cmgomer@usbr.gov

Additional Information: Public Law 111-291 authorized funding to construct a MR&I water system on the Crow Indian Reservation. In order to facilitate the construction and design of the MR&I water system, the Crow Tribe conducted a three month pilot plant study. The Crow Tribe contracted with Bartlett & West to prepare an Environmental Assessment to evaluate the proposed pilot study. The Final EA and FONSI is available. For more information visit: www.usbr.gov/gp/nepa/cmri/index.html

 
Goose Bay Modernization (EA) Canyon Ferry, Montana Final EA/FONSI May 2014 Bureau of Reclamation Justin Kucera
(406) 247-7330
jkucera@usbr.gov
Additional Information: The Goose Bay Marina on Canyon Ferry Reservoir is being modernized and improved for recreation uses and services. For more information visit: www.usbr.gov/gp/mtao/canyonferry/goosebay/
 
Nelson Reservoir Safety of Dams Corrective Action (EA) Malta, Montana Final EA/FONSI January 2014 Malta Irrigation District Justin Kucera
(406) 247-7330
jkucera@usbr.gov

Additional Information: Nelson Reservoir has a series of dikes that were inspected for safety reasons, two of which were found in need of repair. Continued levels of water seepage through the dikes could lead to failure and result in property and resource damage. The project involves reconstructing the dikes to control water seepage and provide proper drainage.

 
Shoreline Protection and Aquatic Habitat Restoration Project at Medicine Creek State Recreation Area (EA) Cambridge, Nebraska Final EA/FONSI April 2014 Nebraska Game and Parks Commission Andrea Severson
(308) 345-1028
aseverson@usbr.gov

Additional Information: The EA can be accessed at www.usbr.gov/gp/nkao/nepa/med_creek_ea_fonsi.pdf.

 
Last Updated: 12/19/17