Post-2026 Operational Guidelines and Strategies for Lake Powell and Lake Mead – Draft Environmental Impact Statement

Reclamation released the Post-2026 Operational Guidelines and Strategies for Lake Powell and Lake Mead – Draft Environmental Impact Statement. A Notice of Availability of the Draft EIS was published in the Federal Register on January 16, 2026, for a 45-day public review and comment period that ended March 2, 2026.

Additionally, Reclamation developed an interactive tool designed to allow for easy comparison of figures across the Post-2026 Draft EIS. This tool can be accessed here:  CRB Post-2026 Draft EIS Figure Viewer
For tool assistance, email:  crbpost2026@usbr.gov



Executive Summary (7.8 MB, PDF)

Volume 1 – Main Body

Volume 2 – Supporting Appendices

Volume 3 – Technical Appendices

Last Updated: 3/12/26