Project Details
Title: El Dorado Irrigation District Long-Term Warren Act Contract EA
Summary: Reclamation proposes to enter into a Long-term Warren Act Contract with the El Dorado Irrigation District to convey up to 17,000 acre-feet per year of non-Central Valley Project water through Folsom Reservoir for municipal and industrial uses in the western portion of El Dorado County. The 2002 EA and FONSI incorporated by reference in the 2016 EA can be found here: http://www.usbr.gov/mp/nepa/nepa_projdetails.cfm?Project_ID=797.
Contact
Phone
Fax
E-Mail
Notes
John Hutchings (916)989-7179 (916)989-7208 jhutchings@usbr.gov
Status
08/08/2016Finding of No Significant Impact and Environmental Assessment released.
List of Available Reports
File Report Title File Ext File Size
Finding of No Significant Impact: Long-Term Warren Act Contract between the El Dorado Irrigation District and the United States .pdf 175,822 B
Final Environmental Assessment: Long-Term Warren Act Contract between the El Dorado Irrigation District and the United States .pdf 1,359,818 B
Appendix A: Coldwater Pool Diversion Analysis (EID 2009) .pdf 3,260,246 B
Appendix B: Indian Trust Assets Compliance Memo .pdf 20,126 B
Appendix C: Cultural Resources Compliance Memo .pdf 20,160 B
Appendix D: Summary of Lower American River Hydrologic Analysis .pdf 2,126,486 B
Appendix E: Appendix 5B to the Coordinated Long-Term Operation of the CVP and SWP EIS .pdf 608,884 B
Appendix F: Potential Effect of Diversions on Folsom Reservoir Coldwater Pool .pdf 982,953 B
Appendix G: USFWS (2016) Species List .pdf 14,990 B