| Schedule |
Title |
View |
Size |
| A-1 |
Schedule of Irrigation Project Use Energy, Contract, Cost of Service, and Full Cost Water Rates Per Acre Foot by Contractor |
view |
632 KB |
| A-2A |
Schedule of Irrigation Cost of Service Water Rates Per Acre-Foot by Contractor |
view |
660 KB |
| A-2B1 |
Accumulated Irrigation Construction Relief Due to Ability-to-Pay Studies |
view |
857 KB |
| A-2BA |
Schedule of Irrigation Allocated Construction Costs Per Acre-Foot by Contractor |
view |
709 KB |
| A-2BB |
Schedule of Irrigation Construction Costs Allocation by Contractor |
view |
796 KB |
| A-2BC |
Schedule of Irrigation Allocated Intertie Construction Costs per Acre-Foot by Contractor |
view |
208 KB |
| A-2Bc fsod |
Schedule of FY 2025 Allocated Irrigation Folsom SOD Modification Project Cost by Component and Contractor |
view |
642 KB |
| A-2Bc intertie |
Schedule of FY 2025 Allocated Irrigation Intertie Modification Project Cost by Component and Contractor |
view |
193 KB |
| A-4 |
Schedule of Irrigation Construction Costs to be Repaid by Component and/or Facility as of September 30, 2025 |
view |
119 KB |
| A-5 |
Schedule of Irrigation Construction and Project Use Energy Costs by Component as of September 30, 2025 |
view |
98 KB |
| A-6A |
Schedule of FY 2025 Irrigation Results of Operations and Contractor Net Position at September 30, 2025 |
view |
69 KB |
| A-6B |
Schedule of Interest Bearing Deficit Costs Per Acre-Foot |
view |
639 KB |
| A-7 |
Schedule of Irrigation Historical and Projected Deliveries by Construction Cost Component and Contractor 1981-2030 |
view |
155 KB |
| A-8 |
Schedule of Irrigation Projected Deliveries by Contractor and O&M Costs Per Acre-Foot by Cost Component |
view |
477 KB |
| A-8XM IIJA |
Schedule of Allocated Irrigation IIJA-XM Costs by Component and Contractor |
view |
599 KB |
| A-8XM |
Schedule of Allocated Irrigation XM Cost by Component and Contractor |
view |
602 KB |
| A-9 |
Schedule of Irrigation Estimated Operation and Maintenance Costs by Facility and/or Component |
view |
1.22 MB |
| A-11 |
Schedule of Estimated Irrigation Direct Pumping Operation and Maintenance Costs |
view |
125 KB |
| A-12 |
Schedule of Projected 2027 Irrigation Water Deliveries for Calculation of Operations and Maintenance Rates (Deliveries in Acre-Feet) |
view |
566 KB |
| A-13 |
Schedule of Projected (2027-2030) Irrigation Water Deliveries (in acre-feet) for Calculation of Individual Contractor Prorated Construction Costs and Rate |
view |
1.41 MB |
| A-13 FSOD |
Schedule of Historical (2024-2073) and Projected (2027-2073) Irrigation Water Deliveries (in acre-feet) for Calculation of Individual Contractor Prorated for Folsom SOD Construction Costs and Rate |
view |
1.35 MB |