| Title: | Raw Water Bypass Pipeline Project Environmental Assessment |
|---|---|
| Tracking Number: | |
| Progress: | |
| Summary: | The San Juan Water District (SJWD), in partnership with the City of Roseville and the Bureau of Reclamation, constructed a permanent raw water bypass pipeline (Bypass Pipeline) on Reclamation's Central California Area Office land in Folsom. The new 72-inch Bypass Pipeline will run parallel to the existing 3,400 foot long, 84-inch pipeline, and ensures a secure and reliable water conveyance system during planned and/or unplanned outages of the existing pipeline. |
|
Contact
|
Phone
|
Fax
|
E-Mail
|
Notes
|
|---|
| 09/09/2009 | Draft EA/FONSI available April 22, 2009. Comments due May 22, 2009. FONSI signed and final EA completed on July 30, 2009. |
|---|
| File | Report Title | File Ext | File Size |
|---|---|---|---|
![]() |
Final EA/signed FONSI, Raw Water Bypass Pipeline Project | 6,548 B | |
![]() |
Appendix A to Final EA/signed FONSI, Raw Water Bypass Pipeline Project | 2,010 B | |
![]() |
Draft EA/FONSI, Raw Water Bypass Pipeline Project | 5,054 B |