- Reclamation
- California Great Basin Region
- NEPA
- Project Detail
Title: | Kern-Tulare Water District Oil Field Water Reuse Project |
---|---|
Tracking Number: | |
Progress: | |
Summary: | The District?s project site is located in the north-central portion of unincorporated Kern County, California, near the Kern County/Tulare County border (Figure 1). To date, the District has partnered with local oil producers located in the Jasmin, Dyer Creek, and Mount Poso oil fields. Although the District?s EIR analyzed a larger footprint and proposed action, because of reduced oil production from local oil producers, the District decided to separate the larger project into two phases, Phase I partnering with Jasmin Oil field (the Project or Proposed Action analyzed here), and Phase II partnering with Dyer Creek and Mount Poso. The Phase I project includes the construction of a produced water delivery and storage system from the nearby oil field and this project has independent utility from Phase II. The District has decided not to move forward with Phase II at this time, and it is unknown if and when they will pursue that phase. Reclamation does not have a federal action associated with Phase II and is, therefore, only assessing Phase I. |
Contact
|
Phone
|
Fax
|
E-Mail
|
Notes
|
---|---|---|---|---|
Rain Emerson | 559-262-0335 | N/A | remerson@usbr.gov | |
Jennifer Lewis | 559-487-5197 | N/A | jllewis@usbr.gov |
03/16/2017 | Final FONSI and EA posted. |
---|---|
01/17/2017 | Draft FONSI/EA. Comments due at COB February 21, 2017. |
File | Report Title | File Ext | File Size |
---|---|---|---|
![]() |
Signed FONSI - Kern-Tulare Water District Oil Field Water Reuse Project | 126,319 B | |
![]() |
Final EA - Kern-Tulare Water District Oil Field Water Reuse Project | 1,542,476 B | |
![]() |
FONSI - Kern - Tulare Water District Oil Field Water Reuse Project | 103,612 B | |
![]() |
EA - Kern - Tulare Water District Oil Field Water Reuse Project | 577,764 B |