Central Valley Project Cost Allocation Study

Central Valley Project Cost Allocation Study The Central Valley Project (CVP) is a multi-purpose water resources project that supplies water to over 250 long-term contractors throughout California’s Central Valley. The CVP also generates hydroelectric power first for project use purposes and second to partially meet the electricity needs of over 70 preference power customers. Congress authorized the CVP to serve water supply, power, flood control, fish and wildlife, recreation, navigation, and water quality needs, with portions of the costs for CVP facilities to be reimbursed by the water and power users. More...

Click here to be added to the CVP-CAS E-Mail list

Public Meeting: Friday, October 27, 2017, 10:00 a.m. to Noon

Federal Building
2800 Cottage Way
Sacramento, CA 95825
Cafeteria Conference Rooms
C1001-C1002
Call-In Number: 1-888-322-5810
Participant Code: 8540760#

  • For access to the Powerpoint presentation, please contact the Mid-Pacific Region Public Affairs Office.

Past Public Meetings

Friday, April 28, 2017, 10:00 a.m. to Noon

Friday, August 25, 2017, 1:00 p.m. to 3:00 p.m.

Friday, August 11, 2017, 10:00 a.m. to Noon

Contacts:

Michael Mosley
Chief, Water Supply Planning Branch
916-978-5119

Lisa Navarro
Public Affairs Specialist
916-978-5111

Note: documents in Portable Document Format (PDF) require Adobe Acrobat Reader 5.0 or higher to view download Adobe Acrobat Reader.

Last Updated: 10/27/17