| Title: | Delta Cross Channel Gate Improvements Project |
|---|---|
| Tracking Number: | CGB-ED-2025-068 |
| Progress: | IN-PROGRESS |
| Summary: | The Proposed Action consists of improvements to the existing DCC gate facility, including complete replacement of the existing radial gates and installation of new wire rope hoists with full remote operation control and monitoring capability. As a result of the gate remote operation control capability, automatic gate devices would be introduced to the hoisting system. No modifications to the existing facility concrete structure and foundation are planned for this project. A small maintenance building would be constructed on the north side of the structure, moveable barriers would be added as an additional boater safety feature, and public access ramp would be added to the north bank along the downstream side of the DCC. |
|
Contact
|
Phone
|
Fax
|
E-Mail
|
Notes
|
|---|---|---|---|---|
| Carolyn Bragg | (916) 444-2473 | N/A | cbragg@usbr.gov |
| 06/23/2025 | Draft Environmental Assessment posted for public review through 7/23/2025. |
|---|---|
| 02/19/2025 | EA in progress. |
| File | Report Title | File Ext | File Size |
|---|---|---|---|
![]() |
CGB-ED-2025-068 Delta Cross Channel Gate Improvements Project Appendix A | 16,958,992 B | |
![]() |
CGB-ED-2025-068 Delta Cross Channel Gate Improvements Project Draft EA | 2,615,844 B |