Project Details
Title: Delta Cross Channel Gate Improvements Project
Tracking Number: CGB-ED-2025-068
Progress: IN-PROGRESS
Summary: The Proposed Action consists of improvements to the existing DCC gate facility, including complete replacement of the existing radial gates and installation of new wire rope hoists with full remote operation control and monitoring capability. As a result of the gate remote operation control capability, automatic gate devices would be introduced to the hoisting system. No modifications to the existing facility concrete structure and foundation are planned for this project. A small maintenance building would be constructed on the north side of the structure, moveable barriers would be added as an additional boater safety feature, and public access ramp would be added to the north bank along the downstream side of the DCC.
Contact
Phone
Fax
E-Mail
Notes
Carolyn Bragg (916) 444-2473 N/A cbragg@usbr.gov
Status
06/23/2025Draft Environmental Assessment posted for public review through 7/23/2025.
02/19/2025EA in progress.
List of Available Reports
File Report Title File Ext File Size
CGB-ED-2025-068 Delta Cross Channel Gate Improvements Project Appendix A .pdf 16,958,992 B
CGB-ED-2025-068 Delta Cross Channel Gate Improvements Project Draft EA .pdf 2,615,844 B