- Reclamation
- California Great Basin Region
- NEPA
- Project Detail
| Title: | 2021 Tehama-Colusa Canal Authority In-Basin Water Transfers |
|---|---|
| Tracking Number: | |
| Progress: | |
| Summary: | The Member Units of the Tehama Colusa Canal Authority (TCCA) may experience water shortages in 2021 and are soliciting willing sellers to transfer surface water to them. Several entities that use surface water from the Sacramento River have expressed interest in transferring water to Member Units of the TCCA. The TCCA would negotiate with these sellers, on behalf of the Member Units, to identify potential transfers of water and the specifics of each transfer arrangement. To facilitate the transfer of water throughout the State, Reclamation is considering whether it should approve and facilitate water transfers between willing sellers and buyers when Sacramento River Settlement Contractor Base Supply or Central Valley Project facilities are involved. |
|
Contact
|
Phone
|
Fax
|
E-Mail
|
Notes
|
|---|---|---|---|---|
| Natalie Taylor | 530-892-6275 | N/A | ntaylor@usbr.gov |
| 04/15/2021 | FONSI signed on April 15, 2021 |
|---|
| File | Report Title | File Ext | File Size |
|---|---|---|---|
![]() |
FONSI CGB-EA-2021-025 2021 Tehama-Colusa Canal Authority In-Basin Water Transfers | 244,246 B | |
![]() |
2021 Tehama-Colusa Canal Authority In-Basin Water Transfers Initial Study -Environmental Assessment | 1,240,039 B | |
![]() |
2021 Tehama-Colusa Canal Authority In-Basin Water Transfers Initial Study --Environmental Assessment Appendices A through F | 40,870,548 B | |
![]() |
2021 Tehama-Colusa Canal Authority In-Basin Water Transfers Initial Study- Environmental Assessment Appendices G through N | 12,877,303 B |


