- Reclamation
- California Great Basin Region
- NEPA
- Project Detail
Title: | Big Valley Rancheria Well Project EA |
---|---|
Summary: | The Bureau of Reclamation has awarded federal funding to the Big Valley Band of Pomo Indians of Big Valley Rancheria to help construct an additional drinking water well on Tribal property. The Big Valley Rancheria Water Treatment System requires an additional well to be used as a backup when the existing well is shut down for repairs and routine maintenance. The new well would provide increased capacity and reliability of the Tribe's water system to provide safe drinking water and sufficient fire suppression capacity during drought conditions prevalent in Clear Lake. |
Contact
|
Phone
|
Fax
|
E-Mail
|
Notes
|
---|---|---|---|---|
Doug Kleinsmith | (916) 978-5034 | N/A | dkleinsmith@usbr.gov |
10/11/2018 | EA available for review on September 17, 2018. Comments were due by October 1, 2018. FONSI signed on October 10, 2018. |
---|
File | Report Title | File Ext | File Size |
---|---|---|---|
FONSI, Big Valley Rancheria Well Project | 244,534 B | ||
EA, Big Valley Rancheria Well Project | 3,059,303 B |