Project Details
Title: Long-term Renewal of CVP Contracts - Sacramento River Division EA
Summary: The Sacramento River Division contains 18 water service contractors served primarily by the Tehama Colusa Canal and the Corning Canal in Tehama, Glenn, Colusa, and Yolo Counties. Potential impacts may be associated with potential changes in water use and cropping patterns,reduction of return flows,and availability of water.The contractor must ensure that all surface water delivered for irrigation purposes within the contractor's service area will be measured at each agricultural turnout, and water delivered for M&I purposes will be measured at each M&I service connection.
Contact
Phone
Fax
E-Mail
Notes
Status
02/28/2005Draft EA on 8/19/03. BA completed August 2003. Revised BA March 2004. Revised Draft EA released on July 30, 2004. Final EA completed November 11, 2004. FONSI signed February 25, 2005. PROBLEMS VIEWING OR DOWNLOADING FILES? PLEASE CONTACT LYNNETTE WIRTH AT (916) 978-5102 or lwirth@mp.usbr.gov
List of Available Reports
File Report Title File Ext File Size
Signed FONSI, Sac.River Division .pdf 195 B
Summary, contents, purpose & need - final EA, Sac. River Division .pdf 267 B
Figure 1-1, Final EA, Sac. River Division .pdf 2,066 B
Project Description, Affected Environ. and Environ. Consequences, Consult./Coord., References, Glossary, Final EA, Sac. River Division .pdf 1,553 B
Appendices A - F, Final EA, Sac. River Division .pdf 2,799 B
Appendix G, Final EA, Sac. River Division .pdf 1,577 B
NOAA Fisheries ESA Consultation letter 1/10/05, Sacramento River Division .pdf 238 B
FWS ESA Consultation letter 10/17/04 .pdf 49 B
FWS ESA Consultation letter 11/12/04 .pdf 41 B
FWS ESA Consultation letter 2/14/05 .pdf 32 B
FWS ESA Consultation letter 2/15/05 .pdf 43 B