- Reclamation
- California Great Basin Region
- NEPA
- Project Detail
| Title: | Transfer Approvals for the Exchange of Water between Del Puerto Water District and Arvin-Edison Water Storage District |
|---|---|
| Tracking Number: | |
| Progress: | |
| Summary: | Reclamation proposes to approve the transfers of up to 15,000 AF of water between Del Puerto and Arvin-Edison for storage during the 2017 Contract Year and later return a like amount of CVP water to Del Puerto, less 3% for conveyance losses, if applicable, when requested by Del Puerto. The available water supplies would include SJRRP recaptured/recirculated CVP water and/or Cross Valley Contractors? South-of-Delta CVP water supplies acquired by Arvin-Edison. The CVP water would be delivered to Del Puerto at its existing turnouts off the Delta-Mendota Canal upstream of San Luis Reservoir. |
|
Contact
|
Phone
|
Fax
|
E-Mail
|
Notes
|
|---|---|---|---|---|
| Stacy Holt | 559-487-5295 | N/A | slholt@usbr.gov |
| 10/19/2017 | Final documents posted. |
|---|


