Project Details
Title: Advanced Metering Infrastructure (AMI) System - South Tahoe Public Utilities District
Summary: The Proposed Action involves installation of AMI for Phase 3 and part of Phase 4 in the STPUD service area. Phase 3 involves the installation of 1,432 water meters and Phase 4 involves the installation of 1,327 water meters. Metering in the STPUD service area will allow STPUD to meter volumetric consumption, and better determine district water allocation.
Contact
Phone
Fax
E-Mail
Notes
Nathaniel Martin 916-978-6153 N/A nmartin@usbr.gov
Status
04/17/2017Signed FONSI and Final EA posted.
03/16/2017Draft EA available for public review. Comments due 4/7/2017.
List of Available Reports
File Report Title File Ext File Size
Signed FONSI - Advanced Metering Infrastructure (AMI) System .pdf 109,570 B
FINAL EA - Advanced Metering Infrastructure (AMI) System .pdf 1,680,481 B
Advanced Metering Infrastructure (AMI) System - South Tahoe Public Utilities District .pdf 1,131,986 B