Project Details
Title: MU5 Farms Lateral 32.2 Turnout and Irrigation Pipeline Project on the Madera Canal
Summary: Reclamation proposes to issue an MP-620 encroachment permit to MU5 Farms for construction of a turnout and irrigation pipeline on and adjacent to Lateral 32.2. The turnout structure and pipeline will provide irrigation water to MU5 Farms? property. The turnout will be located at the intersection of Road 25 and Avenue 25 in Madera County about 10 miles north of the City of Madera, 9 miles east of the City of Chowchilla, and 1.25 miles northwest of Berenda Creek. The turnout will have a concrete headwall, floor, and sidewalls. A steel canal gate will be bolted to the headwall to control the amount of water that will enter the 24-inch PVC pipeline that will be connected to the canal near the turnout. The pipeline will extend from a connection at the turnout to a standpipe located at the southeast corner of MU5 Farms? property approximately a half mile west of the turnout (latitude 37? 06? 44.93? N, longitude 120? 06? 7.04?W). Staging of equipment used for the Project will take place in, and immediately adjacent to, the proposed work areas.
Contact
Phone
Fax
E-Mail
Notes
Russell Taylor-Grimes 916-978-5051 N/A RWGrimes@usbr.gov
Nathaniel Martin 916-978-6153 N/A nmartin@usbr.gov
Rufino Gonzalez N/A N/A rgonzalez@usbr.gov
Status
02/22/2017No comments received. FONSI signed.
11/29/2016Comments due by COB December 14th, 2016.
List of Available Reports
File Report Title File Ext File Size
FONSI - MU5 Farms Lateral 32.2 Turnout and Irrigation Pipeline Project on the Madera Canal .pdf 104,136 B
Mu5 Farms Lateral 32.2 Turnout and Irrigation Pipeline Project on the Madera Canal .pdf 934,854 B