- Reclamation
- California Great Basin Region
- NEPA
- Project Detail
Title: | MU5 Farms Lateral 32.2 Turnout and Irrigation Pipeline Project on the Madera Canal |
---|---|
Summary: | Reclamation proposes to issue an MP-620 encroachment permit to MU5 Farms for construction of a turnout and irrigation pipeline on and adjacent to Lateral 32.2. The turnout structure and pipeline will provide irrigation water to MU5 Farms? property. The turnout will be located at the intersection of Road 25 and Avenue 25 in Madera County about 10 miles north of the City of Madera, 9 miles east of the City of Chowchilla, and 1.25 miles northwest of Berenda Creek. The turnout will have a concrete headwall, floor, and sidewalls. A steel canal gate will be bolted to the headwall to control the amount of water that will enter the 24-inch PVC pipeline that will be connected to the canal near the turnout. The pipeline will extend from a connection at the turnout to a standpipe located at the southeast corner of MU5 Farms? property approximately a half mile west of the turnout (latitude 37? 06? 44.93? N, longitude 120? 06? 7.04?W). Staging of equipment used for the Project will take place in, and immediately adjacent to, the proposed work areas. |
Contact
|
Phone
|
Fax
|
E-Mail
|
Notes
|
---|---|---|---|---|
Russell Taylor-Grimes | 916-978-5051 | N/A | RWGrimes@usbr.gov | |
Nathaniel Martin | 916-978-6153 | N/A | nmartin@usbr.gov | |
Rufino Gonzalez | N/A | N/A | rgonzalez@usbr.gov |
02/22/2017 | No comments received. FONSI signed. |
---|---|
11/29/2016 | Comments due by COB December 14th, 2016. |
File | Report Title | File Ext | File Size |
---|---|---|---|
FONSI - MU5 Farms Lateral 32.2 Turnout and Irrigation Pipeline Project on the Madera Canal | 104,136 B | ||
Mu5 Farms Lateral 32.2 Turnout and Irrigation Pipeline Project on the Madera Canal | 934,854 B |