Project Details
Title: Firebaugh Canal Water District 2nd Lift Canal Lining Project Phase 5 - Washoe Avenue to Ashlan Avenue
Summary: The Bureau of Reclamation proposes to award $564,000 to FCWD through CALFED Water Use Efficiency Grant Funding to reduce canal seepage, improve water reliability, and update structures to allow conversion to high-efficiency irrigation systems. The grant will partially fund the concrete lining of 1.7 miles of the Second Lift Canal of the FCWD Lift System, from Washoe Avenue to Ashlan Avenue, to reduce seepage losses. Grant funds would also go towards replacing control structures along that segment of canal to improve water management capabilities. Water conserved by the project would also reduce the discharge of pollutant-containing subsurface drainage to the San Joaquin River.
Contact
Phone
Fax
E-Mail
Notes
Alexandra Woodward (916) 978-5056 (916) 978-5055 aawoodward@usbr.gov
Status
12/08/2016EA completed and FONSI signed on December 8, 2016. EA made available for public review from November 30, 2016 through December 7, 2016.
List of Available Reports
File Report Title File Ext File Size
FONSI - Firebaugh Canal Water District 2nd Lift Canal Lining Project Phase 5 - Washoe Avenue to Ashlan Avenue .pdf 325,496 B
EA - Firebaugh Canal Water District 2nd Lift Canal Lining Project Phase 5 - Washoe Avenue to Ashlan Avenue .pdf 1,051,801 B