Project Details
Title: Warren Act Contracts for Banta-Carbona Irrigation District, Byron-Bethany Irrigation District, and Patterson Irrigation District
Summary: Reclamation proposes to allow the continued annual introduction and conveyance of up to 5,000 AF of BBID?s and up to 10,000 AF of BCID?s non-CVP surface water in federal facilities through a series of 5-year Warren Act contracts ending on December 31, 2045. Reclamation would also allow the continued annual introduction of up to 10,000 AF of PID?s non-CVP surface water through August 31, 2046. Introduced non-CVP water may be stored within federal facilities for later use depending on available capacity. All of the non-CVP water would be delivered either directly or via exchange from existing turnouts within the SOD CVP facilities.In addition, the introduction, conveyance, and storage of non-CVP water is dependent on available capacity and operational constraints; therefore, the Proposed Action would not interfere with the normal operations of federal facilities nor would it impede any CVP obligations to deliver water to other contractors or to local fish and wildlife habitat.
Contact
Phone
Fax
E-Mail
Notes
Rain Emerson 559-262-0335 N/A remerson@usbr.gov
Status
12/05/2014Comments on draft EA due by COB on December 26, 2014. FONSI signed and EA completed on February 12, 2015.
List of Available Reports
File Report Title File Ext File Size
Signed FONSI and Completed EA, Warren Act Contracts for Banta-Carbona Irrigation District, Byron-Bethany Irrigation District, and Patterson Irrigation District .pdf 1,846,154 B
Draft EA, Warren Act Contracts for Banta-Carbona Irrigation District, Byron-Bethany Irrigation District, and Patterson Irrigation District .pdf 928 B