Title: | Safety of Dams Modifications to Dike 1 Environmental Assessment |
---|---|
Summary: | Reclamation's Safety of Dams program has proposed modifications to Folsom Reservoir?s Dike 1 in the Granite Bay Unit of Folsom Recreation Area. Although there is no immediate danger, the purpose of the proposed project is to more thoroughly reduce the risk of Dike 1 failure from water seepage through the embankment. The project includes five primary components: (1) stockpiling of filter materials (sand and gravel); (2) removal and stockpiling of slope protection material and riprap; (3) installation of a toe drain at the base of Dike 1; (4) installation of a gravel and sand slope filter; and (5) replacement of the stockpiled protection material on the face of Dike 1. |
Contact
|
Phone
|
Fax
|
E-Mail
|
Notes
|
---|
12/24/2014 | The Environmental Assessment has been made available for a 14-day public review period, ending on December 12, 2014. FONSI signed and EA completed on December 24, 2014. |
---|
File | Report Title | File Ext | File Size |
---|---|---|---|
Signed FONSI, Dike 1 Modification Project | 2,330 B | ||
Completed EA, Dike 1 Modification Project | 706 B | ||
Dike 1 Modification Project - Environmental Assessment | 706 B |