Project Details
Title: Recirculation of Recaptured Water Year 2010 San Joaquin River Restoration Program Interim Flows EA
Summary: Reclamation is entering into various 12 consecutive month transfer and exchange agreements to recirculate recaptured water to the Friant Division. Recaptured water available for transfer to the Friant Division as a result of releases of flows from Friant Dam from the implementation of the San Joaquin River Restoration Program Interim Flows for Water Year 2010, specified as October 1, 2009 through September 30, 2010, is estimated to be up to 60,000 AF of the CVP Friant Division Class 2 water supply. The transfers and exchanges will be completed through several mechanisms utilizing potential Federal, State, and Local Facilities. The recaptured water will be recirculated back to 16 of the Class 2 Friant Division contractors as Class 2 supplies.
Contact
Phone
Fax
E-Mail
Notes
Michelle Banonis 916 978-5457 N/A mbanonis@usbr.gov
Status
02/07/2011Draft EA/FONSI available June 28, 2010. Comments are due by July 16, 2010. FONSI signed and final EA completed on July 22, 2010. Updated FONSI signed and Addendum to the final EA completed on February 4, 2011.
List of Available Reports
File Report Title File Ext File Size
Updated FONSI, Recirculation of Recaptured Water Year 2010 SJRRP Interim Flows .pdf 131 B
Addendum to the final EA, Recirculation of Recaptured Water Year 2010 SJRRP Interim Flows .pdf 76 B
Draft EA, Recirculation of Recaptured Water Year 2010 SJRRP Interim Flows. Appendix A-D .pdf 4,508 B
Final FONSI, Recirculation of Recaptured Water Year 2010 SJRRP Interim Flows .pdf 175 B
Final EA, Recirculation of Recaptured Water Year 2010 SJRRP Interim Flows .pdf 577 B
Appendices, Final EA, Recirculation of Recaptured Water Year 2010 SJRRP Interim Flows .pdf 5,886 B
Draft FONSI, Recirculation of Recaptured Water Year 2010 SJRRP Interim Flows .pdf 31 B
Draft EA, Recirculation of Recaptured Water Year 2010 SJRRP Interim Flows .pdf 571 B