Schuster, J.C.; Hansen, R.L.. 1969. "Discharge Measurements Using the Radioisotope Velocity, Integrated Sample, Dilution, and Total Cost methods at Flatiron Power and Pumping Plant, Colorado Big Thompson Project". Bureau of Reclamation, Report Number HYD-593.

Abstract:


Web Link: ../pubs/HYD/HYD-593.pdf

The script that generated this page was last revised on 05/20/15