Project Details
Title: Recirculation of Recaptured Water Year 2012 San Joaquin River Restoration Program Interim Flows Environmental Assessment
Summary: Reclamation estimates the recirculation of approximately 20,000 to 80,000 acre-feet (AF), based on 90 and 50 percent exceedance levels, of recaptured water from south-of-Delta facilities as a result of San Joaquin River Restoration Program Water Year 2012 Interim Flows. The recaptured water will be recirculated back to the listed Friant Division long-term contractors whose supplies are impacted by Water Year 2012 Interim Flow releases.
Contact
Phone
Fax
E-Mail
Notes
Michelle Banonis 916 978-5457 N/A mbanonis@usbr.gov
Status
04/03/2012Draft EA and Draft Finding of No Significant Impact (FONSI) available for review on February 7, 2012 with comments due by February 24, 2012. FONSI signed and final EA completed on April 3, 2012.
List of Available Reports
File Report Title File Ext File Size
Signed FONSI, Recirculation of Recaptured Water Year 2012 San Joaquin River Restoration Program Interim Flows .pdf 165 B
Final EA, Recirculation of Recaptured Water Year 2012 San Joaquin River Restoration Program Interim Flows .pdf 3,974 B
Final EA, Attachment A, Recirculation of Recaptured Water Year 2012 San Joaquin River Restoration Program Interim Flows .pdf 3,204 B
Final EA, Attachment B, Recirculation of Recaptured Water Year 2012 San Joaquin River Restoration Program Interim Flows .pdf 3,497 B
Draft FONSI, Recirculation of Recaptured Water Year 2012 San Joaquin River Restoration Program Interim Flows .pdf 45 B
Draft EA, Recirculation of Recaptured Water Year 2012 San Joaquin River Restoration Program Interim Flows .pdf 1,091 B