Title: | Reclamation District 108 South Steiner Pumps and Pipeline Project EA |
---|---|
Summary: | Reclamation would help fund Reclamation District 108's (District) proposal to abandon in place the South Steiner Pumping Plant (SSPP) on the Sacramento River after constructing a 2,830 foot pipeline and related facilities to redirect irrigation water pumped from the Wilkins Slough Pumping Plant and Fish Screen Facility (also on the Sacramento River) to fields previously served by the SSPP. The proposed action includes two primary components: 1) installation of pump sumps; and 2) construction of a dual 21-inch, 2,830 foot-long PVC pipeline. |
Contact
|
Phone
|
Fax
|
E-Mail
|
Notes
|
---|---|---|---|---|
Shelly Hatleberg | (916) 978 5050 | (916) 978-5290 | shatleberg@usbr.gov |
09/30/2011 | Draft FONSI and EA available for review September 30, 2011. Comments due by October 28, 2011. Final FONSI signed October 31, 2011. |
---|
File | Report Title | File Ext | File Size |
---|---|---|---|
Final FONSI Reclamation District 108 South Steiner Pumps and Pipeline Project | 281 B | ||
Final EA Reclamation District 108 South Steiner Pumps and Pipeline Project | 5,838 B | ||
Reclamation District 108 South Steiner Pumps and Pipeline Project FONSI | 39 B | ||
Reclamation District 108 South Steiner Pumps and Pipeline Project EA | 2,039 B |