Project Details
Title: Reclamation District 108 South Steiner Pumps and Pipeline Project EA
Summary: Reclamation would help fund Reclamation District 108's (District) proposal to abandon in place the South Steiner Pumping Plant (SSPP) on the Sacramento River after constructing a 2,830 foot pipeline and related facilities to redirect irrigation water pumped from the Wilkins Slough Pumping Plant and Fish Screen Facility (also on the Sacramento River) to fields previously served by the SSPP. The proposed action includes two primary components: 1) installation of pump sumps; and 2) construction of a dual 21-inch, 2,830 foot-long PVC pipeline.
Contact
Phone
Fax
E-Mail
Notes
Shelly Hatleberg (916) 978 5050 (916) 978-5290 shatleberg@usbr.gov
Status
09/30/2011Draft FONSI and EA available for review September 30, 2011. Comments due by October 28, 2011. Final FONSI signed October 31, 2011.
List of Available Reports
File Report Title File Ext File Size
Final FONSI Reclamation District 108 South Steiner Pumps and Pipeline Project .pdf 281 B
Final EA Reclamation District 108 South Steiner Pumps and Pipeline Project .pdf 5,838 B
Reclamation District 108 South Steiner Pumps and Pipeline Project FONSI .pdf 39 B
Reclamation District 108 South Steiner Pumps and Pipeline Project EA .pdf 2,039 B