- Reclamation
- California Great Basin Region
- NEPA
- Project Detail
Title: | El Dorado Irrigation District's Pump Station Temperature Control Device Environmental Assessment |
---|---|
Summary: | Reclamation and EID plan to install a TCD on EID's existing water supply intake in Folsom Reservoir in order to preserve cold water for release to the lower American River for the benefit of fall-run Chinook salmon and steelhead. This project is part of the Water Forum's Initial Fisheries and In-stream Habitat Management and Restoration Plan for the Lower American River, dated October 31, 2001. |
Contact
|
Phone
|
Fax
|
E-Mail
|
Notes
|
---|
10/29/2002 | FONSI signed. |
---|
File | Report Title | File Ext | File Size |
---|---|---|---|
EA and FONSI - El Dorado Hills Raw Water Pumping Station Temperature Control Device Project | 745,522 B |