Project Details
Title: Long-Term Warren Act Contract with Cawelo Water District EA
Summary: Reclamation proposes to execute a Warren Act (WA) contract to allow for the conveyance of up to 20,000 acre-feet of non-Central Valley Project water through the Friant-Kern Canal from Cawelo Water District (CWD)for recovery by Alameda County Flood Control and Water Conservation District Zone 7. In addition, Reclamation would approve a right-of-use application for CWD for access across/through Reclamation facilities. CWD needs the WA contract for extreme drought conditions when surface water allocations are unavailable from CWD's exchangers.
Contact
Phone
Fax
E-Mail
Notes
Status
01/28/2013Draft FONSI and EA was available for public review on December 6, 2010. Comments were due January 3, 2011. FONSI signed on December 23, 2011.
List of Available Reports
File Report Title File Ext File Size
Signed FONSI and final EA, Long-Term Warren Act Contract with Cawelo Water District .pdf 4,992 B
Draft FONSI, Long-Term Warren Act Contract with Cawelo Water District .pdf 62 B
Draft EA, Long-Term Warren Act Contract with Cawelo Water District .pdf 3,599 B