- Reclamation
- California Great Basin Region
- NEPA
- Project Detail
Title: | Long-Term Warren Act Contract with Cawelo Water District EA |
---|---|
Summary: | Reclamation proposes to execute a Warren Act (WA) contract to allow for the conveyance of up to 20,000 acre-feet of non-Central Valley Project water through the Friant-Kern Canal from Cawelo Water District (CWD)for recovery by Alameda County Flood Control and Water Conservation District Zone 7. In addition, Reclamation would approve a right-of-use application for CWD for access across/through Reclamation facilities. CWD needs the WA contract for extreme drought conditions when surface water allocations are unavailable from CWD's exchangers. |
Contact
|
Phone
|
Fax
|
E-Mail
|
Notes
|
---|
01/28/2013 | Draft FONSI and EA was available for public review on December 6, 2010. Comments were due January 3, 2011. FONSI signed on December 23, 2011. |
---|
File | Report Title | File Ext | File Size |
---|---|---|---|
Signed FONSI and final EA, Long-Term Warren Act Contract with Cawelo Water District | 4,992 B | ||
Draft FONSI, Long-Term Warren Act Contract with Cawelo Water District | 62 B | ||
Draft EA, Long-Term Warren Act Contract with Cawelo Water District | 3,599 B |