Project Details
Title: Reach 4B, Eastside Bypass and Mariposa Bypass Low Flow Channel and Structural Improvements Project
Summary: The Bureau of Reclamation and the California Department of Water Resources are proposing to prepare a joint EIS/EIR to evaluate effects of the proposed Reach 4B, Eastside Bypass and Mariposa Bypass Low Flow Channel and Structural Improvements Project. The Proposed Action includes the construction, operation, and maintenance of a low flow channel in Reach 4B of the San Joaquin River and in the Eastside and Mariposa bypasses and improvements to facilities in the Eastside and Mariposa bypasses to allow for fish passage. The purpose of the Proposed Action is to comply with the San Joaquin River Settlement by improving conveyance capacity in Reach 4B of the San Joaquin River to ensure conveyance of at least 475 cubic feet per second (cfs), modifying the Eastside and Mariposa bypass channels to establish a low flow channel, and modifying structures in the Eastside and Mariposa bypasses to provide for fish passage.
Contact
Phone
Fax
E-Mail
Notes
Michelle Banonis 916 978-5457 N/A mbanonis@usbr.gov
Status
12/21/2012NOI published September 9, 2009.
List of Available Reports
File Report Title File Ext File Size
No documents at this time!