Project Details
Title: Tracy Administration Building Rehabilitation
Summary: Reclamation proposes to rehabilitate the exterior of the Tracy Office Administration Building. Specific actions include the following: ? Roof replacement/rehabilitation and raising the administration building parapet 4 inches higher to the existing 24-foot-high building for the re-roofing. ? Installation of shatter proof film on the east facade and north elevation windows facing the switchyard to prevent injury in the event an explosion. ? Repair of cracks in the interior stairwell stucco walls. ? Installation of a new air conditioner server rack in the computer server room that would be in keeping with the function of that room. No groundbreaking and other intrusive construction work is planned during this project. Construction materials will be staged behind the building within the designated staging area. Construction equipment could include fork lifts, truck conveyors, scissor lifts, or other similar equipment.
Contact
Phone
Fax
E-Mail
Notes
Jennifer Lewis 559-487-5197 N/A jllewis@usbr.gov
Status
05/22/2017Categorical Exclusion Checklist signed 5/19/2017
List of Available Reports
File Report Title File Ext File Size
Categorical Exclusion Checklist Tracy Administration Building Rehabilitation CEC-17-008 .pdf 351,143 B