Title: Western Area Power Administration's Proposed Installation of Security Gates at the Tracy Substation Facility - FONSI and EA available at the link below:
Site: https://www.wapa.gov/regions/SN/environment/Pages/san-joaquin-valley.aspx
Summary: Reclamation will approve the installation of security upgrades by WAPA at three sites within Reclamation land at the Tracy Substation Facility. Specific activities include retrofitting the existing gates, installing card readers and concrete security posts at two entrance locations into the substation, digging trenches for the utility hookup from the card reader to the gates, and installing conduits from the base of the care reader to the new gate operator on the exterior of Reclamation's Control Building.
Contact
Phone
Fax
E-Mail
Notes
Rain Emerson 559-262-0335 N/A remerson@usbr.gov
Status
12/07/2016FONSI
List of Available Reports
File Report Title File Ext File Size
Western Area Power Administrations Proposed Installation of Security Gates at the Tracy Substation Facility .pdf 1,008,535 B