Project Details
Title: Porterville Irrigation District In-Lieu Ground Water Recharge Project
Summary: Reclamation proposes to provide partial funding for Porterville Irrigation District (PID) to construct new water conveyance facilities to supply surface water to 2,120 acres that currently utilize groundwater for irrigation purposes. The proposed action would connect pipelines to the Wood Central Ditch and the Friant-Kern Canal. This would enable PID to deliver more of their surface water allocation within the district, and landowners in the project area would be able to use surface water in lieu of groundwater, allowing for passive groundwater recharge.
Contact
Phone
Fax
E-Mail
Notes
Becky Victorine (916) 978-4624 916-458-1850 rvictorine@usbr.gov San Joaquin River Restoration Project Office
Adam Nickels (916) 978-4415 (916) 978-5469 anickels@usbr.gov
Status
09/19/2016FONSI and EA-IS posted 09/19/16. The EA/IS was available for review on June 15, 2016.
List of Available Reports
File Report Title File Ext File Size
Finding of No Significant Impact - signed 09/19/2016. .pdf 2,268,565 B
Environmental Assessment/Initial Study - Porterville Irrigation District In-Lieu Groundwater Recharge Project .pdf 2,267,384 B
Attachment C - National Historic Preservation Act Consultation .pdf 120,915 B
Attachment D - Endangered Species Act Consultation .pdf 269,335 B
IS Checklist,Porterville Irrigation District In-Lieu Ground Water Recharge Project .pdf 4,014,617 B
IS,Appendix A, Porterville Irrigation District In-Lieu Ground Water Recharge Project .pdf 2,806,204 B
IS, Appendix B, Porterville Irrigation District In-Lieu Ground Water Recharge Project .pdf 154,313 B
IS, Appendix C,Porterville Irrigation District In-Lieu Ground Water Recharge Project .pdf 5,341,467 B