Title: | Recirculated Restoration Flows to Red Top |
---|---|
Summary: | The Bureau of Reclamation is proposing a new turnout and pipeline to facilitate a 10-year transfer and exchange of recaptured San Joaquin River Restoration Flows to Red Top. The purpose of the proposed action is to reduce reliance on deep aquifer groundwater pumping in the Red Top area to reduce the rate of subsidence, as well as avoid water supply impacts to Friant Contractors by providing a mechanism to recirculate, reuse, exchange or transfer recaptured Restoration Flows near the San Joaquin River and Eastside Bypass. |
Contact
|
Phone
|
Fax
|
E-Mail
|
Notes
|
---|---|---|---|---|
Becky Victorine | (916) 978-4624 | 916-458-1850 | rvictorine@usbr.gov | San Joaquin River Restoration Project Office |
10/03/2016 | FONSI, Final EA/IS, and Response to Comments - Water Year 2016-2026 Transfer and Exchange from Madera Irrigation District to Chowchilla Water District to the Red Top Area |
---|
File | Report Title | File Ext | File Size |
---|---|---|---|
FONSI - Water Year 2016-2026 Transfer and Exchange from Madera Irrigation District and Chowchilla Water District to the Red Top Area | 2,574,981 B | ||
Final EA - Water Year 2016-2026 Transfer and Exchange from Madera Irrigation District and Chowchilla Water District to the Red Top Area | 3,054,039 B | ||
10f2 IS/MND | 6,293,311 B | ||
20f2 - IS/MND | 5,048,821 B | ||
Draft EA - Water Year 2016-2026 Transfer and Exchange from Madera Irrigation District and Chowchilla Water District to the Red Top Area | 2,097,327 B | ||
Draft EA - Appendix A. | 232,109 B | ||
Draft EA - Appendix B. | 1,333,310 B | ||
Draft EA - Appendix C. | 2,568,955 B | ||
Draft EA - Appendix D. | 2,540,609 B |