Project Details
Title: Authorization of Naval Air Station Fallon Stormwater Discharge
Summary: Reclamation proposes to authorize the continued discharge and conveyance of stormwater from Naval Air Station Fallon through Newlands Project drainage facilities. Expected volumes and flow rates of stormwater discharging to Reclamation facilities would not change from the current estimated volumes and flow rates as long as the amount of impermeable surfaces remain the same.
Contact
Phone
Fax
E-Mail
Notes
Selena Werdon (775) 884-8366 N/A swerdon@usbr.gov
Status
12/17/2015Environmental Assessment available for review on November 6, 2015. Comments were due December 7, 2015. FONSI signed on December 11, 2015.
List of Available Reports
File Report Title File Ext File Size
FONSI, Authorization of Naval Air Station Fallon Stormwater Discharge .pdf 314,232 B
Final Environmental Assessment, Authorization of Naval Air Station Fallon Stormwater Discharge .pdf 2,811,990 B
Environmental Assessment, Authorization of Naval Air Station Fallon Stormwater Discharge .pdf 2,681,729 B