Project Details
Title: Trinity River Channel Rehabilitation Site: Bucktail (River Mile 105.45 ? 107.0)
Summary: The Trinity River Restoration Program (TRRP), including the U.S. Bureau of Reclamation and the U.S. Bureau of Land Management (federal co-lead agencies), and the North Coast Regional Water Quality Control Board (Regional Water Board - state lead agency) propose to construct the 2016 Trinity River Channel Rehabilitation Project at the Bucktail site. The purpose is to increase salmon and steelhead habitat downstream of Lewiston Dam, as described in the December 19, 2000, Record of Decision for the Trinity River Mainstem Fishery Restoration Environmental Impact Statement. The proposed project is designed to enhance both terrestrial and aquatic habitat quality. In-river work will increase habitat complexity via construction of slow water refuge habitats (e.g., side channels), reconnection of the floodplain with the river, and placement of in-river geomorphic and habitat features (e.g., rock and wood structures). On-shore work will include revegetation of riverine and upland areas with native vegetation.
Contact
Phone
Fax
E-Mail
Notes
Brandt Gutermuth (530) 623-1806 (530) 623-5944 fgutermuth@usbr.gov
Status
05/17/2016Draft EA/IS available for review on November 18, 2015. Comments were due on January 4, 2016. FONSI signed on May 12, 2016.
List of Available Reports
File Report Title File Ext File Size
FONSI, Trinity River Channel Rehabilitation Site: Bucktail (River Mile 105.45 ? 107.0) .pdf 905,620 B
Final EA/IS, Cover and Contents, Trinity River Channel Rehabilitation Site: Bucktail (River Mile 105.45 ? 107.0) .pdf 751,082 B
Final EA/IS, Introduction and Background, Trinity River Channel Rehabilitation Site: Bucktail (River Mile 105.45 ? 107.0) .pdf 5,692,892 B
Final EA/IS, Project Develop and Alternatives, Trinity River Channel Rehabilitation Site: Bucktail (River Mile 105.45 ? 107.0) .pdf 2,975,502 B
Final EA/IS, Affected Environment and Consequences part 1, Trinity River Channel Rehabilitation Site: Bucktail (River Mile 105.45 ? 107.0) .pdf 2,767,315 B
Final EA/IS, Affected Environment and Consequences part 2, Trinity River Channel Rehabilitation Site: Bucktail (River Mile 105.45 ? 107.0) .pdf 5,236,096 B
Final EA/IS, Affected Environment and Consequences part 3, Trinity River Channel Rehabilitation Site: Bucktail (River Mile 105.45 ? 107.0) .pdf 5,320,014 B
Final EA/IS, Affected Environment and Consequences part 4, Trinity River Channel Rehabilitation Site: Bucktail (River Mile 105.45 ? 107.0) .pdf 3,050,935 B
Final EA/IS, Cumulative Effects and Other Considerations , Trinity River Channel Rehabilitation Site: Bucktail (River Mile 105.45 ? 107.0) .pdf 208,731 B
Final EA/IS, List of Preparers, Trinity River Channel Rehabilitation Site: Bucktail (River Mile 105.45 ? 107.0) .pdf 142,529 B
Final EA/IS, References, Trinity River Channel Rehabilitation Site: Bucktail (River Mile 105.45 ? 107.0) .pdf 214,674 B
Final EA/IS, Appendix A, Trinity River Channel Rehabilitation Site: Bucktail (River Mile 105.45 ? 107.0) .pdf 4,222,344 B
Final EA/IS, Appendix B, Trinity River Channel Rehabilitation Site: Bucktail (River Mile 105.45 ? 107.0) .pdf 308,385 B
Final EA/IS, Appendix C, Trinity River Channel Rehabilitation Site: Bucktail (River Mile 105.45 ? 107.0) .pdf 123,836 B
Final EA/IS, Appendix D, Trinity River Channel Rehabilitation Site: Bucktail (River Mile 105.45 ? 107.0) .pdf 81,115 B
Final EA/IS, Appendix E Trinity River Channel Rehabilitation Site: Bucktail (River Mile 105.45 ? 107.0) .pdf 860,787 B
Draft EA/IS main doc and Appendix A, Trinity River Channel Rehabilitation Site: Bucktail (River Mile 105.45 ? 107.0) .pdf 5,114,255 B
Draft EA/IS Appendix B Part 1, Trinity River Channel Rehabilitation Site: Bucktail (River Mile 105.45 ? 107.0) .pdf 4,621,818 B
Draft EA/IS Appendix B Part 2, Trinity River Channel Rehabilitation Site: Bucktail (River Mile 105.45 ? 107.0) .pdf 5,163,045 B