- Reclamation
- California Great Basin Region
- NEPA
- Project Detail
Title: | 2015 Temporary Change in Water Quality Requirements for Groundwater Introduced into the Upper-Portion of the Delta-Mendota Canal |
---|---|
Summary: | For groundwater introduced into the upper portion of the Delta-Mendota Canal, the Bureau of Reclamation proposes to temporarily change the maximum acceptable concentration of selenium measured at the well head from 2 ppb to 5 ppb. The change would only be in effect through August 30, 2015. The maximum allowable selenium concentration for wells in the lower portion of the Delta-Mendota Canal would be unchanged |
Contact
|
Phone
|
Fax
|
E-Mail
|
Notes
|
---|---|---|---|---|
Rain Emerson | 559-262-0335 | N/A | remerson@usbr.gov |
07/28/2015 | The FONSI was signed and EA completed on July 28, 2015. |
---|
File | Report Title | File Ext | File Size |
---|---|---|---|
Signed FONSI and Completed EA, 2015 Temporary Change in Water Quality Requirements for Groundwater Introduced into the Upper-Portion of the Delta-Mendota Canal | 2,069,224 B | ||
Draft FONSI/EA, 2015 Temporary Change in Water Quality Requirements for Groundwater Introduced into the Upper-Portion of the Delta-Mendota Canal | 1,962,368 B |