Project Details
Title: 2015 Temporary Change in Water Quality Requirements for Groundwater Introduced into the Upper-Portion of the Delta-Mendota Canal
Summary: For groundwater introduced into the upper portion of the Delta-Mendota Canal, the Bureau of Reclamation proposes to temporarily change the maximum acceptable concentration of selenium measured at the well head from 2 ppb to 5 ppb. The change would only be in effect through August 30, 2015. The maximum allowable selenium concentration for wells in the lower portion of the Delta-Mendota Canal would be unchanged
Contact
Phone
Fax
E-Mail
Notes
Rain Emerson 559-262-0335 N/A remerson@usbr.gov
Status
07/28/2015The FONSI was signed and EA completed on July 28, 2015.
List of Available Reports
File Report Title File Ext File Size
Signed FONSI and Completed EA, 2015 Temporary Change in Water Quality Requirements for Groundwater Introduced into the Upper-Portion of the Delta-Mendota Canal .pdf 2,069,224 B
Draft FONSI/EA, 2015 Temporary Change in Water Quality Requirements for Groundwater Introduced into the Upper-Portion of the Delta-Mendota Canal .pdf 1,962,368 B