- Reclamation
- California Great Basin Region
- NEPA
- Project Detail
Title: | Cortina Water District - Discharge Facility - Tehama-Colusa Canal, Milepost 90.43L - Central Valley Project, California |
---|---|
Summary: | Cortina Water District (District) is requesting permission to install, operate and maintain a new discharge facility along the Tehama-Colusa Canal (TCC) for the purposes of discharging well water into the TCC in conjunction with the District?s Warren Act Contract. A 12-inch PVC or steel pipeline will be installed from a well located on land owned by Glenn Kelley. The pipeline would extend approximately 905 feet onto Reclamation?s right-of way, cross under Reclamation?s canal access road and extend into the canal through the embankment. The Tehama-Colusa Canal Authority (TCCA) and Reclamation reviewed the location on April 14, 2015, and it has been determined the proposed facility will not interfere with the operation and maintenance of the TCC. This action would occur in early spring in preparation for the irrigation season. |
Contact
|
Phone
|
Fax
|
E-Mail
|
Notes
|
---|---|---|---|---|
Paul Zedonis | (530) 276-2047 | (530) 275-2441 | pzedonis@usbr.gov |
05/21/2015 | Categorically excluded, May 2015. |
---|
File | Report Title | File Ext | File Size |
---|---|---|---|
Categorical Exclusion Checklist | 696 B |