Project Details
Title: 2015 American River Division Interim Water Service Contract Renewal for the City of Roseville
Summary: The Bureau of Reclamation proposes to enter into a 24-month (third) Interim Renewal Contract with the City of Roseville, an American River contractor, to facilitate the annual delivery of up to 32,000 acre-feet per year of CVP water for M&I use in Roseville?s CVP service area. The term of the Roseville IRC would be from March 1, 2015 through February 28, 2017. In the event a new long-term water service contract is executed, the IRC, then-in-effect, would be superseded by the long-term water service contract and analyzed under a separate environmental review process.
Contact
Phone
Fax
E-Mail
Notes
John Hutchings (916)989-7179 (916)989-7208 jhutchings@usbr.gov
Status
11/03/2014Comments on draft EA/FONSI due by COB on December 3, 2014.
List of Available Reports
File Report Title File Ext File Size
Draft EA/FONSI, 2015 American River Division Interim Water Service Contract Renewal for the City of Roseville .pdf 875 B