Project Details
Title: Fresno Irrigation District?s Installation of a Temporary Pumping Facility for the introduction of Kings River Water into the Friant-Kern Canal at the Gould Canal for Transfer and/or Exchange
Summary: Reclamation proposes to do the following: (1) enter into an exchange agreement with Fresno Irrigation Distric for the return of previously banked Unreleased Restoration Flows, (2) enter into Warren Act contracts and/or exchange agreements for the introduction and conveyance of the District?s available water supply into and through Friant Division facilities, and (3) issue a land use authorization to the District for the installation, operation, and maintenance of temporary pumping facilities within its right-of-way at or near the Gould Canal.
Contact
Phone
Fax
E-Mail
Notes
Becky Victorine (916) 978-4624 916-458-1850 rvictorine@usbr.gov San Joaquin River Restoration Project Office
Status
03/25/2014Draft FONSI and EA available for review on March 11, 2014. Comments due March 19, 2014. FONSI signed on March 21, 2014.
List of Available Reports
File Report Title File Ext File Size
Signed FONSI,Fresno Irrigation District Installation of Temporary Pumping Facility for the introduction of Kings River Water into the Friant-Kern Canal at the Gould Canal .pdf 703 B
Final EA, Fresno Irrigation District Installation of Temporary Pumping Facility for the introduction of Kings River Water into the Friant-Kern Canal at the Gould Canal .pdf 981 B
Draft FONSI, Fresno Irrigation District Installation of Temporary Pumping Facility for introduction of Kings River Water into Friant-Kern Canal at Gould Canal for Transfer and/or Exchange .pdf 483 B
Draft EA, Fresno Irrigation District Installation of Temporary Pumping Facility for introduction of Kings River Water into Friant-Kern Canal at Gould Canal for Transfer and/or Exchange .pdf 2,367 B
Draft EA, Attachment A, Fresno Irrigation District Installation of Temporary Pumping Facility for introduction of Kings River Water into Friant-Kern Canal at Gould Canal for Transfer and/or Exchange .pdf 1,366 B
Draft EA, Attachment B, Fresno Irrigation District Installation of Temporary Pumping Facility for introduction of Kings River Water into Friant-Kern Canal at Gould Canal for Transfer and/or Exchange .pdf 167 B