Title: | Ten-Year Exchange Agreements and/or Warren Act Contract for Conveyance of Groundwater in the Delta-Mendota Canal - Contract Years 2013 through 2023 |
---|---|
Summary: | Reclamation executed a 5-year Exchange Agreement and/or 5-year Warren Act contract with requesting Central Valley Project (CVP) contractors within the Delta Division and San Luis Unit. At the end of the first 5-year action(s), Reclamation could execute an additional 5-year Exchange Agreement and/or 5-year Warren Act contract to requesting CVP contractors within the Delta Division and San Luis Unit based on the 10-year environmental impact analysis covered under this Environmental Assessment. The terms for both would be March 1, 2013 through February 28, 2023 for pumping and conveyance, and March 1, 2013 through February 29, 2024 for storage in San Luis Reservoir and conveyance from the San Luis Reservoir. In 2014, Reclamation proposed to approve additional points of delivery for up to 5,000 AF of Panoche Water District?s non-CVP groundwater introduced into the DMC as part of the DMC Groundwater Pump-in Program through February 28, 2015. The 5,000 AF is included in the up to 10,000 AF provided for under Panoche?s existing 5-year Warren Act contract, which is part of the above action. Later in 2014, Reclamation temporarily changed the maximum acceptable concentration of selenium measured at the well head from 2 ppb to 5 ppb for groundwater introduced into the upper portion of the DMC. The change is only in effect through August 30, 2014. In 2016, Reclamation proposed to approve additional points of delivery for up to 5,000 AF of Panoche?s non-Project groundwater introduced into the DMC as part of the DMC Groundwater Pump-in Program through February 28, 2018. The 5,000 AF is included in the up to 10,000 AF provided for under Panoche?s existing 5-year Warren Act contract which is included in the cumulative total (50,000 AF per year) allowed under the DMC Groundwater Pump-in Program. |
Contact
|
Phone
|
Fax
|
E-Mail
|
Notes
|
---|---|---|---|---|
Rain Emerson | 559-262-0335 | N/A | remerson@usbr.gov |
05/13/2016 | FONSI signed May 12, 2016 for the Additional Points of Delivery for Panoche Water District's Non-Project Groundwater to Westlands Water District |
---|---|
05/03/2016 | The draft EA/FONSI for Additional Points of Delivery for Panoche Water District?s Non-Project Groundwater to Westlands Water District is available for public review from May 4, 2016 to May 10, 2016. |
08/08/2014 | The draft EA/FONSI for the Temporary Change in Water Quality Requirements for Groundwater Introduced into the Upper Portion of the Delta-Mendota Canal was available for public review from July 23, 2014 through August 1, 2014. FONSI signed and final EA completed on August 4, 2014. |
07/10/2014 | FONSI signed and EA completed for the Additional Points of Delivery for Panoche Water District?s Non-Project Groundwater to Westlands Water District 2014-2015 on July 9, 2014. |
06/13/2014 | Draft EA and FONSI, Additional Points of Delivery for Panoche Water District?s Non-Project Groundwater to Westlands Water District 2014-2015 available for review on June 16, 2014. |
01/14/2013 | The FONSI was signed on January 10, 2013. |
11/13/2012 | The EA and FONSI will be available for public review from November 13, 2012 through December 13, 2012. |