Adaptive Management Work Group (AMWG)
Public Meeting
April 29, 2009 (9:15 a.m. - 5:30 p.m.)
April 30, 2009, 2008 (8 a.m. - 12 noon approximately)
Bureau of Indian Affairs, 2 Arizona Center, 400 N. 5th Street
12th Floor, Conference Rooms A&B
Phoenix, Arizona
Federal Register Notices(s):
Pre-Meeting Information:
- Final Minutes, Attachments (Order Subject to Change), Motions Passed
- Attachment 1: Action Item Tracking Report
- Attachment 2a: Memo from Kameran Onley dated 11/7/08, Subj: Report and Recommendation from the Glen Canyon Dam Adaptive Management Program Federal Advisory Committee; 2b: Memo from P. Lynn Scarlett dated 12/4/08, Subj: Response to Glen Canyon Dam Adaptive management Work Group Report and Recommendation; 2c: Memo from Kameran Onley dated 1/16/09, Subj: Glen Canyon Dam Adaptive Management Work Group; 2d: Memo from Kameran Onley dated 1/16/09, Subj: Transition and Farewell; 2e: Letter from the Seven Colorado River Basin States Representatives to the Glen Canyon Dam Adaptive Management Work Group dated 2/23/09, Subj: Decision Making Process Associated with the Glen Canyon Dam Operations and GCAMP
- Attachment 3a: AIF: Grand Canyon Monitoirng and Research Center (GCMRC) Updates; 3b: USGS Fact Sheet: Status and Trends of the Grand Canyon Population of Humpback Chub; 3c: USGS Open File Report: Abundance Trends and Status of the Little Colorado River Population of Humpback Chub: An Update Considering Data from 1989-2008 (prepared by Lew Coggins); 3d: Water Quality and Sediment, 2008 High Flow Experiment, and Integrated Flow, Temperature, and Sediment Modeling PPT; 3e: USGS Fact Sheet: Status and Trends of Resources Below Glen Canyon Dam Update-2009 and accompanying PPT; 3f: Update on the Cultural Monitoring R&D Project PPT
- Attachment 4a: AIF: Monitoring and Research Update with Memo from John Hamill dated 3/25/09, Subj: Amendment to GCMRC's Strategic Science Plan and the Monitoring and Research Plan and attachments: SSF to Support the GCDAMP, Fiscal years 2007-2011 and Amendment MRP (redline/strikeout version), and accompanying PPT; 4b: TWG Chair Report: MRP/SSP Revisions, Actions PPT
- Attachment 5a: AIF: 2007 and 2008 Biological Opinions Conservation Measures Update; 5b: Conservation Measures Razorback Sucker PPT; 5c: Science Plan for Fall Steady Flows and Near Shore Ecology PPT; 5d: Chute Falls Translocation 2003-2008 PPT; 5e: Shinumo HBC Translocation Site PPT; 5f: Nonnative Fishes Control Plan PPT
- Attachment 6a: AIF: Defining Management Actions; 6b: Defining Management Actions PPT
- Attachment 7a: AIF: Final FY08 Expenditures and Carryover, and FY09 CPI Increase; 7b: Memo from John Hamill dated 3/25/09, Subj: GCMRC's Final FY2008 Expenditure Report and Allocation of FY2008 Carryover Funds and FY2009 CPI Funds (w/3 attachments) and PPT; 7c: Reclamation FY08 Carryover and FY09 Underfunding Reallocation with PPT
- Attachment 8a: Budget Discussion Procedures; 8b: AIF: Review of FY10-11 Priorities, Preliminary Budget, and Hydrograph (Draft FY10-11 GCAMP Budget spreadsheet at end of document); 8c: FY 2010-11 Budget TWG Actions PPT; 8d: GCMRC's GCDAMP Preliminary FY 2010-11 Budget PPT
- Attachment 9: AIF: Grand Canyon Protection Act Annual Report to Congress
- Attachment 10: AIF: Science Advisor Nominations and "Strategy for Science Advisor Expertise to Respond to Emphasis Areas of the GCDAMP; 2009-2013" PPT
- Attachment 11: AIF: Basin Hydrology and PPT
- Attachment 12a: GCWC Draft White Paper: Extirpated Species in the Colorado River Ecosystem; 12b: Extirpated or At-risk Species in the Colorado River Ecosystem Downstream from Glen Canyon Dam PPT
- Attachment 13a: Grand Canyon River Guides Motion 1 and PPT; 13b: Grand Canyon River Guides Motion 2 and PPT
- Attachment 14a: AIF: Archaeological Sites Analysis with HEC-RAS Model; 14b: Analysis of Virtual Shorelines in Relation to Archaelogical Sites in the Colorado River Ecosystem PPT; 14c: Archaelogical Sites Analysis TWG Actions
- Attachment 15: AIF: Lees Ferry Trout Fishery Group Update
- Attachment 16: Interagency Agreement #06-AA-40-2458 Between the Bureau of Reclamation and the National Park Service, Grand Canyon National Park, Glen Canyon Dam Adaptive Management Program, Grand Canyon Research Permit Facilitation and Environmental Compliance, December 2008 Annual Report (This has to do with work identified in FY08 budget)
- Attachment 17: News Release: Salazar and Locke Restore Scientific Consultations under the Endangered Species Act to Protect Species and their Habitats
- Attachment 18: Concurrence Memo from DOI Secretary Ken Salazar dated March 26, 2009, Subj: Extension of Members of the Glen Canyon Dam Adaptive Management Work Group [through Sept. 30, 2009]

