historical photo: Potter Wash Siphon 1956
Construction on the Potter Wash Siphon prior to final installation in May 1956. The 66-inch
diameter pipe runs under a 15-foot gully, replacing a failed wood and tin flume . The 160-foot
structure handled 250 cubic feet per second of water and cost $1440.00.

 