
Placement of Zone 4 material, obtained at Borrow Area B, being spread in the first lift at Ridges Basin Dam. Material is being placed to construct an upstream ramp/buttress which will improve excavated slope stability and provide access to the left abutment rock slide areas. 1/2005
Call Reclamation's toll free number for the latest construction information by phone:
866-720-0918

