skip navigation linksContact Us | Site IndexU.S. Department of the Interior | Reclamation | Upper Colorado Region
Search Reclamation
Skip to: [content] [navigation]

Albuquerque Area Office Water Resources Group

San Juan-Chama Project

2008
San Juan-Chama Water Storage
Rio Grande Basin
(Unit = Acre-Feet)

Table 5c. Jemez Canyon Reservoir Elephant Butte Reservoir
SJ-C Storage     Rio San Juan       Rio San Juan
   Total Grande Chama Accumulated   Total Grande Chama
Month Elevation Content Content Content Sediment Elevation Content Content Content
  (1) (2) (3) (4) (5) (6) (7) (8) (9)
Dec. 2006 5155.00 0 0 0 0 4332.22 408773 404725 4048
January 5155.00 0 0 0 0 4336.06 454646 450617 4029
February 5155.00 0 0 0 0 4338.24 481920 477913 4007
March 5155.00 0 0 0 0 4339.30 495505 469753 25752
April 5155.00 0 0 0 0 4342.34 535595 510995 24640
May                  
June                  
July                  
August                  
September                  
October                  
November                  
December                  
 
(5)Accumulated sediment is estimated from latest resurvey to present. The total actual accumulated sediment within the sediment retention pool at Jemez Canyon Reservoir from 1953 to last sediment survey of December 31, 1998 was 19788 AF. Estimated sediment accumulation since last survey is 0 AF for a total accumulation of 19788 AF.
Data Current as of May 19, 2008.
NA=Data currently unavailable.