Bureau of Reclamation logo Rio Grande Silvery Minnow Population Monitoring 2002


Monthly Fish Monitoring Data Reports:

Spawning Periodicity Study (ended 30 June)

General Information about the Monitoring Sites

Site-Specific Information:

Angostura Reach

Angostura Dam
Bernalillo
Rio Rancho
Central Ave. Bridge
Rio Bravo Blvd.

Isleta Reach

Los Lunas
Belen
Jarales
Bernardo
La Joya
0.6 mi upstream San Acacia

San Acacia Reach

San Acacia Dam
1.5 mi downstream San Acacia
Socorro
4 mi upstream 380 Bridge
380 Bridge
Middle Bosque del Apache
San Marcial
Station 500
Lower Corral

Data from previous project years:

2000 | 2001 | 2002

Credits

Click for information from 0.6 mi upstream San Acacia site Click for information from Angostura site Click for information from Bernalillo site Click for information from Rio Rancho site Click for information from Central Avenue Bridge site Click for information from Rio Bravo Blvd site Click for information from Los Lunas site Click for information from Belen site Click for information from Jarales site Click for information from Bernardo site Click for information from La Joya site Click for information from San Acacia Diversion Dam site Click for information from 1.5 mi downstream San Acacia site Click for information from Socorro site Click for information from 4 mi upstrea 380 Bridge site Click for information from 380 Bridge site Click for information from Middle Bosque site Click for information from San Marcial site Click for information from Station 500 site Click for information from Lower Corral site

Population Monitoring Data for 2003

January

Survey conducted 28 Jan - 3 Feb

February

Survey conducted 21-27 Feb

March

Survey conducted 24-28 March

April

Survey conducted 16-23 April

May

Survey conducted 27 May - 3 June

June

Survey conducted 23-26 June & 10 July (access to river restricted due to Bosque fires)

July

Survey conducted 28-31 July

August

Survey conducted 18-21 Aug

September

Survey conducted 22-26 Sept

October

Survey conducted 20-24 October

November

Survey conducted 17-21 November

December

Survey conducted 15-19 December


For More Information Contact:
Jim Wilber - Albuquerque Area Office
(505) 462-3548
JWILBER@uc.usbr.gov
Mike Porter - Albuquerque Area Office
(505) 462-3596
MPorter@uc.usbr.gov
555 Broadway NE, Suite 100
Albuquerque NM 87102