Historic Conditions
Annual Precipitation
| Normal | 4.13 in |
| Maximum - 1965 | 7.96 in |
| Minimum - 1968 | 1.11 in |
| Las Vegas, Nevada 1961-1990 | |
Temperature
| Mean Annual | 66.7 ?F |
| Daily Maximum - 07/11/1959 | 116 ?F |
| Daily Minimum - 01/13/1963 | 8 ?F |
| Las Vegas, Nevada 1949-1996 | |
Colorado River
| Drainage area above Hoover Dam1 | 167,000 mi2 |
| Annual discharge near Grand Canyon2: | |
| Average | 11,270,000 acre-ft |
| Maximum - 19293 | 19,850,000 acre-ft |
| Minimum - 1963 | 1,629,000 acre-ft |
| Discharge near Grand Canyon: | |
| Momentary Maximum - 07/2/19274 | 127,000 ft3/s |
| Momentary Minimum - 12/28/24 | 700 ft3/s |
| Average | 15,570 ft3/s |
1 137,800 mi2 near Grand Canyon.
2 Grand Canyon Station is located 267.2 miles upstream from Hoover Dam.
3 Recorded maximum. Estimated maximum of 25,200,000 acre-ft occurred in 1909.
4 Other estimated maximums are 300,000 ft3/s on July 8, 1884, and 220,000 ft3/s on July 19, 1921.
Return to top
Project Water Quality
Havasu - Mohave Lakes
Lake Mead
Return to top
Facilities in Operation - First Stage
| Storage Dams | 1 |
| Main Aqueduct | 2.97 mi |
| River Mountain Tunnel | 4 mi |
| Laterals | 32.1 mi |
| Pumping Plants | 9 |
Return to top
Facilities in Operation - Second Stage
| Main Aqueduct `B` Line | 2.39 mi |
| Pittman Lateral | 19.79 mi |
| Pumping Plants | 6 |
Return to top
Storage Facilities
Hoover Dam
Return to top
Carriage Facilities - First Stage
Saddle Island Intake Facilities and Tunnel
| Location | Extends from the east side of Saddle Island in Lake Mead though the island to the west, and terminates in a pump chamber below Pumping Plant No.1. |
| Construction period | 1969-1971 |
| Length | 0.27 mi |
| Capacity1 | 623 cfs |
| Cross section: | Horseshoe |
| Diameter | 156 in |
| Elevation of inlet | 1,018.1 ft |
| Lining: | Generally unlined |
| Access adit: | Provides access to the intake tunnel and pumping plant chamber through an inclined tunnel. |
| Length | 1,400 ft |
| Width | 14 ft |
| Type: | Modified horseshoe |
| Slope | 0.17 |
1 The tunnel was designed to provide capacity for both first and second stage operation
Main Aqueduct
| Location | Extends from Pumping Plant No.1 to the River Mountain Tunnel. |
| Construction period | 1970-1971 |
| Description | Prestressed circular concrete |
| Length | 2.97 mi |
| Diameter | 120-96 in |
| Capacity | 585-300 cfs |
River Mountain Tunnel
| Location | Excavated through the River Mountains, which lie between Las Vegas Valley and Lake Mead. |
| Construction period | 1968-1970 |
| Length | 3.78 mi |
| Diversion capacity | 500-608 cfs |
| Cross section: | Circular |
| Diameter | 121.5-156 in |
| Lining: | Concrete |
| Thickness | 15-21 in |
Las Vegas Valley Lateral
| Location | Begins at the outlet portal of the River Mountain Tunnel and runs to the Whitney Bifurcation |
| Construction period | 1970-1971 |
| Description | Cylindrical |
| Prestressed concrete pipe | 3.08 mi |
| Steel pipe, mortar lined | 3.38 mi |
| Steel pipe, coal-tar coated | 0.53 mi |
| Total length: | 6.99 mi |
| River Mountain to Henderson Bifurcation | 0.97 mi |
| Henderson Bifurcation to Whitney Bifurcation | 6.02 mi |
| Diameter | 96090-in |
| Initial capacity | 289-261 cfs |
North Las Vegas Lateral
| Location | Begins at the Whitney Bifurcation and extends to a terminal reservoir near Nellis Air Force Base. |
| Construction period | 1970-1971 |
| Description | |
| Steel pipe, coal-tar coated | 0.21 mi |
| Steel pipe, mortar lined | 8.42 mi |
| Pretensioned concrete | 1.37 mi |
| Length | 10 mi |
| Diameter | 72-24 in |
| Capacity | 101-16 cfs |
Whitney Lateral
| Location | Begins at the Whitney Bifurcation and extends in an easterly direction to a terminal reservoir near the intersection of Flamingo Road and Pecos Road. |
| Construction period | 1970-1971 |
| Description | |
| Steel pipe, coal-tar coated | 1.63 mi |
| Steel pipe, mortar lined | 1.65 mi |
| Length | 3.28 mi |
| Diameter | 66 in |
| Capacity | 160 cfs |
Sahara Lateral
| Location | Begins at Sahara Bifurcation and extends eastward to the Sahara Flow Control Station. |
| Construction period | 1970-1971 |
| Description | Steel pipe, mortar lined and coated |
| Length | 0.34 mi |
| Diameter | 24 in |
| Capacity | 15 cfs |
Henderson Lateral
| Location | Begins at the Henderson Bifurcation works in the Las Vegas Valley Lateral and extends in a south westerly direction to the city of Henderson terminal tank. |
| Construction period | 1968-1971 |
| Description | Steel pipe, mortar lined and coated |
| Length | 4.53 mi |
| Diameter | 36 in |
| Capacity | 28 cfs |
Boulder City Lateral
| Location | Begins at Pumping Plant No.1A and terminates at the twin receiving tanks near Boulder City, Nevada. |
| Construction period | 1968-1969 |
| Length | 7.48 mi |
| Diameter | 36-27 in |
| Capacity | 30 cfs |
Alfred Merritt Smith Water Treatment Facilities
| Location | Constructed by the State of Nevada near Pumping Plant 1A near the west shore of Lake Mead opposite Saddle Island. |
| Construction period | 1968-1970 |
| Description | The water treatment plant provides for pretreatment, aeration, taste and color control, flocculation, filtration, chlorination, and corrosion control. |
| Capacity | 34.5 MGD |
| Number of Flocculation units | 10 |
| Number of filters | 20 |
| Surface area of filters | 56,000 ft2 |
| Filter rating at maximum flow | 5 ft2 |
| Filter mediator | |
| Anthracite coal | 20 in |
| Sand | 10 in |
| Filter backwash rate | 22.5 cfs |
| Chemical additives: | Chlorine, sulfur dioxide, potassium permanganate, sodium silicate, activated silica, caustic soda, aluminum sulfate, activated carbon, and polyelectrolyte. |
Return to top
Carriage Facilities - Second Stage
Main Aqueduct `B` line
| Location | Runs from Pumping Plant 1B to the River Mountains Tunnel. |
| Construction period | 1977-1979 |
| Description | Prestressed circular concrete |
| Length | 2.39 mi |
| Diameter | 96-108 in |
| Capacity | 306 cfs |
Pittman Lateral
| Location | Begins at the outlet portal of the River Mountains Tunnel and extends to Oakey Blvd. |
| Construction period | 1978-1981 |
| Description | |
| River Mountain Tunnel portal to Mesa Lateral Bifurcation | 6.57 mi of 8.5-ft-diameter steel pipe with Pritec coating and field applied mortar lining |
| Mesa Lateral Bifurcation to Valley View Regulating Tank | 9.59 mi of 7.5- and 8.0-ft-diameter steel pipe with Pritec coating and field applied mortar lining |
| Valley View Regulating Tank to Oakey Turnout | 3.63 mi of 7.0-ft-diameter reinforced concrete pipe. |
| Length | 19.79 mi |
| Diameter | 102-84 in |
| Capacity | 232-319 cfs |
Fayle Lateral
| Location | From Valley View Regulating Tank to Fayle Reservoir. |
| Construction period | 1980 |
| Description | Steel pipe with Pritec coating and field applied mortar lining. |
| Length | 0.34 mi |
| Diameter | 72 in |
| Capacity | 140 cfs |
Twin Lakes Lateral
| Location | Begins at the Oakey Turnout, the end of Pittman Lateral, and extends to Carlton Square Reservoir. |
| Construction period | 1981-1982 |
| Description | Pretensioned concrete cylinder pipe |
| Length | 5.36 mi |
| Diameter | 33, 36, 42, 48 in |
| Capacity | 32-82 cfs |
Foothill Lateral
| Location | Begins at Foothill Turnout on Pittman Lateral, and extends to Foothill Tank (constructed by City of Henderson) |
| Construction period | 1981 |
| Description | Asbestos-cement pressure pipe |
| Length | 0.20 mi |
| Diameter | 21 in |
| Capacity | 12 cfs |
North Lateral
| Location | Begins at North Lateral Turnout on Pittman Lateral and extends to a reservoir constructed by the City of Henderson at a site near the city`s north boundary. |
| Construction period | 1980-1981 |
| Description | Asbestos-concrete pressure pipe and steel coal-tar enameled coated pipe. |
| Length | 0.58 mi |
| Diameter | 24 in |
| Capacity | 11 cfs |
Mesa Lateral
| Location | Begins at Mesa Lateral Bifurcation on Pittman Lateral and runs to receiving tank built by the city of Henderson. |
| Construction period | 1980-1982 |
| Description | Pretensioned concrete cylinder pipe and steel coal-tar enameled coated pipe. |
| Length | 2.17 mi |
| Diameter | 42 in |
| Capacity | 46 cfs |
Charleston Heights Lateral
| Location | Starts at a bifurcation on Twin Lakes Lateral and terminates at Las Vegas Valley Water District tanks. |
| Construction period | 1981-1982 |
| Description | Pretensioned concrete cylinder pipe and steel coal-tar enameled coated pipe. |
| Length | 0.14 mi |
| Diameter | 42 in |
| Capacity | 40 cfs |
Robinson Lateral
| Location | Begins at the Twin Lakes Pumping Plant and Forebay and extends to an existing North Las Vegas water tank located in the vicinity of the North Las Vegas Air Terminal. |
| Construction period | 1981-1982 |
| Description | Asbestos-cement pressure pipe |
| Length | 1.52 mi |
| Diameter | 24 in |
| Capacity | 10 cfs |
Colorado Street Lateral
| Location | Extends from Pumping Plant No. 7B near first stage Pumping Plant No. 7 to Boulder City`s existing west water tank. |
| Construction period | 1981-1982 |
| Description | Pretensioned concrete cylinder pipe |
| Length | 0.52 mi |
| Diameter | 18, 21, 27 in |
| Capacity | 7.5 cfs |
Hemenway Lateral
| Location | On the Boulder City Lateral about 2,500 feet before lateral reaches Surge Tank No. 5. |
| Construction period | 1981-1982 |
| Description | Asbestos-cement pressure pipe and steel pipe with Pritec coating and mortar lining. |
| Length | 0.12 mi |
| Diameter | 8-12 in |
| Capacity | 2.5 cfs |
Return to top
Pumping Plants
| Designation | Number of units | Total capacity, cfs | Total dynamic head, ft | Total horsepower |
| First Stage | | | | |
| Pumping Plant No. 1 | 10-0 sb | 311 | 223 | 10,000 |
| PP No. 1A Main Aqueduct | 6-1 sb | 300 | 355 | 15,000 |
| PP No. 1A Boulder City Lateral | 2-1 sb | 15 | 455 | 12,000 |
| No. 2A | 6-1 sb | 300 | 355 | 15,000 |
| No. 3 | 3-1 sb | 28 | 230 | 1,050 |
| No. 4 | 2-1 sb | 15 | 455 | 1,200 |
| No. 5 | 2-1 sb | 15 | 455 | 1,200 |
| No. 6 | 3-1 sb | 90 | 182 | 2,400 |
| No. 7 | 3-1 sb | 15 | 78 | 225 |
| Second Stage | | | | |
| PP No. 1 (modifications) | 10-0 sb | 312 | 223 | 10,000 |
| PP No. 1A - Boulder City Lateral (modifications) | 2-0 sb | 15 | 445 | 1,200 |
| PP No. 4 (modifications) | 2-0 sb | 15 | 445 | 1,200 |
| PP No. 5 (modifications) | 2-0 sb | 15 | 445 | 1,200 |
| PP No. 1B | 6-1 sb | 306 | 355 | 18,000 |
| PP No. 2B | 6-1 sb | 306 | 355 | 18,000 |
| PP No. 7B | 3-1 sb | 7.5 | 175 | 225 |
| Hacienda | 6-1 sb | 250 | 365 | 18,000 |
| Twin Lakes - Robinson | 3-1 sb | 10 | 102 | 180 |
| Twin Lakes - Carlton | 3-1 sb | 32 | 117 | 600 |
Return to top
Power Facilities
Robert B. Griffith Water Project - First Stage
Robert B. Griffith Water Project - Second Stage