Ogden River Project
Ogden River Project | Project History | Project Data | Contact Information

Project Data
Land Areas (1997)
Area Irrigated and Crop Value

 

  

Project # 236

 

Land Areas (1997)
Irrigable area:
Full Irrigation Service0 acres
Supplemental Service13,312 acres
Temporary Irrigation Service0 acres
Number of Irrigated Farms166
Residential, Commercial, Industrial Lands10,571 acres
Total Irrigable Lands24,801 acres

 

Population Served:
Farm Population Served551
Non-Farm Population Served84,582
Total Population Served85,133

Return to top

Area Irrigated and Crop Value
YearActual Area Irrigated (Acres)Crop Value (Dollars)
198814,02110,406,330
198914,0217,708,366
199014,06113,116,894
199114,1459,313,641
199213,92113,992,686
199313,92110,431,970
199414,02614,246,573
199514,0077,354,480
199613,5537,872,723
199713,3128,842,662

Return to top

Project Water Supply

Current Conditions

Streamflow

Ogden River below Pineview Reservoir near Huntsville, Utah (USGS)

Streamflow Forecast Map

Spring and Summer (NRCS)

Snowpack Information

Mountain Snowpack Maps for Great Basin and California

Drought Index

Palmer Drought Index Map

Annual Precipitation

Normal17.05 in
Maximum - 198334.31 in
Minimum - 19668.25 in
Ogden Sugar Factory, Utah 1961-1990 

 

Temperature
Mean Annual50.8 ?F
Daily Maximum - 07/21/1931106 ?F
Daily Minimum - 01/21/1937-26 ?F
Ogden Sugar Factory, Utah 1928-1996 
Growing Season150 days
Elevation of irrigible area4,700 ft

 

Ogden River
Drainage area above Pineview Dam298 mi2
Annual discharge 
Maximumacre-ft
Minimumacre-ft
Averageacre-ft

Return to top

Project Water Quality

Curlew Valley

Lower Weber

Return to top

Facilities in Operation
Storage Dams1
Diversion Dams1
Canals30 mi
Laterals66 mi
Drains2 mi

Return to top

Storage Facilities

Pineview Dam

Return to top

Diversion Facilities

South Ogden Highline Canal Diversion Dam

Return to top

Carriage Facilities
Ogden River Crossing - South Ogden Highline Canal
Type:Circular steel siphon
Location:At Ogden River near Ogden, Utah.
Construction period:1936-1937
Length360 ft
Diversion capacity35 cfs
Diameter36 in

 

South Ogden Highline Canal
Type:Reinforced concrete pipe and concrete lined canal
Location:From the end of the Ogden Canyon Conduit generally southwest. Entire canal is concrete lined
Construction period:1938-1941 - Concrete lined canal. 1971-1979 - Replaced by reinforced concrete pipe
Length5.2 mi
Canal Diversion capacity35 cfs
Pipe Diversion capacity49 cfs
Pipe diameter48-18 in

 

Ogden-Brigham Canal
Type:Concrete lined canal
Location:From the end of Ogden-Brigham Conduit near Ogden, Utah, generally north to Brigham, Utah
Construction period:1935-1937
Length24.2 mi
Diversion capacity120 cfs
Typical section in concrete 
Bottom width4 ft
Side slopes1.25:1
Water depth3.1 ft
Lining thickness3 in

Return to top