Lower Yellowstone Diversion Dam

Overview

The Lower Yellowstone Diversion Dam, on the Yellowstone River about 18 miles below Glendive, MT, is a rockfilled timber crib weir about 12 feet high. The dam contains 23,000 cubic yards of material.

Water is diverted from the Yellowstone River into the Main Canal by the Lower Yellowstone Diversion Dam near Intake, Mont. It is carried by gravity to the greater portion of the project lands. About 2,300 acres of bench-land are irrigated by water pumped from the canal by the Thomas Point Pumping Plant.

Facility Descriptions
Lower Yellowstone Diversion Dam

The Lower Yellowstone Diversion Dam, on the Yellowstone River about 18 miles below Glendive, Montana, is a rockfilled timber crib weir about 12 feet high. The dam contains 23,000 cubic yards of material.

Pumping Plant

There are three pumping plants on the project; one at Thomas Point on the Main Canal, one at Crane on the Main Canal, and one on Drain 27. The Thomas Point Pumping Plant is on the Main Canal about 19 miles below the headworks. The plant has two units directly connected to hydraulic turbines and one motor-driven unit. The energy derived from 80 cubic feet per second of water falling 28 feet from the Main Canal to Lateral KK is utilized by the two hydraulic turbine driven centrifugal pumps to lift 45 cubic feet per second of water 31 feet to Lateral LL for irrigation of 2,300 acres of benchland north of Savage, Mont. The motor driven unit pumps 20 cubic feet per second of water from the Main Canal into Lateral LL. The Crane Pumping Plant has two motor-driven units, each of which pumps 5 cubic feet per second of water from the Main Canal into Lateral BP-1. The pumping plant at Drain 27 has one motor-driven unit which pumps 15 cubic feet per second of water from the drain into Lateral N.

Main Canal and Distribution System

The Main Canal diverts to the west side of the Yellowstone River at Intake and extends down the valley to the confluence of the Yellowstone and Missouri Rivers. The canal is 71.6 miles long and has an initial capacity of 1,200 cubic feet per second. A lateral system of 225 miles serves the project lands. A total of 118 miles of drains have been constructed.

Operating Agencies

The project is operated by the Board of Control of the Lower Yellowstone Project.


General
RegionFacilities in Great Plains | Great Plains Home Page
StateMontana
CountyDawson
ProjectLower Yellowstone
Dam TypeDiversion: rock filled timber-crib weir, embankment wing
Reservoir None
WatercourseYellowstone
Location18 miles north of Glendive, Montana
Longitude-104.5294
Latitude47.2801
Original Construction1910
Modified Construction
National ID Number
Hydrologic Unit Code

Dimensions
Structural Height12.00 ft
Hydraulic Height (Normal Operating Depth at Dam)4.00 ft
Top Parapet (Elevation)
Spillway Crest Elevation
Crest Elevation1,981.00 ft
Crest Length700.00 ft
Crest Width
Base Width
Volume of Dam Construction Materials 23,000.00 cu yd
Streambed at Dam Axis
Top of Exclusive Flood Control Pool (Elevation)
Top of Joint Use Pool (Elevation)
Top of Active Conservation Pool (Elevation)
Top of Inactive Conservation Pool (Elevation)
Top of Dead Storage Pool (Elevation)

Hydraulics & Hydrology
Total Water Storage at Elevation
Maximum Water Surface Elevation
Normal Water Surface Elevation
Spillway Type Ogee
Auxiliary Spillway
Spillway Capacity at Elevation
Auxiliary Spillway Capacity at Elevation
Uncontrolled Spillway Capacity at Elevation
Outlet Works Capacity at Elevation
Diversion Capacity at Elevation1,981.00 ft
Drainage Area
Hydrometeorological Report (HMR)
Probable Maximum Flood (PMF) Report

Contact Information
Owner
TitleArea Manager
OrganizationMontana Area Office
AddressP.O. Box 30137
CityBillings, MT 59107-0137
Phone (Fax)406 247-7338
Phone (Office)406 247-7300
Operator
TitleArea Manager
OrganizationMontana Area Office
AddressP.O. Box 30137
CityBillings, MT 59107-0137
Phone (Fax)406 247-7338
Phone (Office)406 247-7300


Last updated: Apr 02, 2013